DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 14, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 4488Mw, 98,917Mw hours, 7-day Avg. 4260Mw
Generators Returned to Service 60 Mw South Baghdad 4 30 Mw New Mulla 4 30 Mw
Generators Unscheduled Out of Service 533 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler leak
8
* Daura 3
SP
Boiler Problem
65
* South Baghdad 3
SP
Air Heater
30
South Baghdad 5
SP
Air Heater
30
Baiji 2,
CP
Lubricating oil leak
110
Hilla 2
CP
Servo
15
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo and Circuit breaker
15
* Old Mulla 3
CP
Principle Protector
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji Mobile, 2
CP
Software problem
15
Hilla 1
CP
Cooling System problems
20
Hilla 2
CP
Servo
40
Shuaiba 2,
CP
Stand By
80
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 996 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Daura 3
CP
R
GRD/RIE
1 Mar 03
1 Jun
20
Daura 4
SP
M
ME
2 Feb 04
20 Apr
65
Daura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Daura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
15 Feb
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Hartha 4
SP
M
ME/Bechtel
23Oct 03
14 Feb
150
Khor Zubayr 4
CP
R
GRD/RIE
20Dec03
14 Feb
55
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
180
Najaf 2
CP
M
GRD/RIE
5 Dec 03
30 Apr
50
New Mulla 1
CP
M
GRD/RIE
13 Jan 04
1 Jun
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
1 Jun
15
Old Mulla 10
CP
M
GRD/RIE
6 Jan 04
1 Jun
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
1 Jun
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
South Baghdad 1
SP
M
ME
12 Feb 04
4 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
4 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
1 May
Haditha-Baghd West
400
Sabotage
GRD/RIE
22 Mar
41 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
29 Feb
264 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
5 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
20 Feb
81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
Sabotage
ME
30 Apr
Mosul – Mosul East
132
Sabotage
ME
TBD
Dibis/Irbil-Azadi/Quarqush 132 New Line GRD/RIE
1 Jun
Shuwaiba-Toba-Hamar
132
Sabotage
ME
15 Feb
Baghd West – Jamia
132
Sabotage
ME
TBD
Omara-Burzegan
132
Looting
ME
1 Mar
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date - 14 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 850 MW.
Power transferred from South to Middle 292 MW.
Baghdad
1700
35570
1482
Duhok
80
1916
80
Naynawa
400
9614
401
Tamim
151
3643
152
Salah Aldeen
230
4963
207
Anbar
202
4503
188
Dyala
118
2522
105
Babil
110
2614
109
Kirbala
128
2799
117
Najaf
135
3097
129
Kadsya
70
1446
60
Wasit
100
2445
102
Muthana
65
1389
58
Nasirya
130
2886
120
Misan
65
1419
59
Basra
270
7523
313
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 4
الرئيسية / الخدمات الأساسية / ESS-ed2cc479
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 14, 2004
- التاريخ
- 14 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: