Home / Essential Services / ESS-ed2cc479

Essential Services

DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 14, 2004

Date
14 February 2004
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 14, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 4488Mw, 98,917Mw hours, 7-day Avg. 4260Mw Generators Returned to Service 60 Mw South Baghdad 4 30 Mw New Mulla 4 30 Mw Generators Unscheduled Out of Service 533 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 2 SP Boiler leak 8 * Daura 3 SP Boiler Problem 65 * South Baghdad 3 SP Air Heater 30 South Baghdad 5 SP Air Heater 30 Baiji 2, CP Lubricating oil leak 110 Hilla 2 CP Servo 15 Mosil 1 CP Rotor Defect 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo and Circuit breaker 15 * Old Mulla 3 CP Principle Protector 15 New Mulla 6 CP Generator Defect 30 Taji 3, CP Compressor 15 Taji Mobile, 2 CP Software problem 15 Hilla 1 CP Cooling System problems 20 Hilla 2 CP Servo 40 Shuaiba 2, CP Stand By 80 * RED – Denotes out of service since last report Generators Scheduled Out of Service 996 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 4 Mar 100 Daura 3 CP R GRD/RIE 1 Mar 03 1 Jun 20 Daura 4 SP M ME 2 Feb 04 20 Apr 65 Daura 5 SP R Bechtel Jul 03 30 Apr 100 Daura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME 30Dec 03 15 Feb 8 Dibis 4 CP R GRD/RIE Sep 03 30 Mar 18 Hartha 4 SP M ME/Bechtel 23Oct 03 14 Feb 150 Khor Zubayr 4 CP R GRD/RIE 20Dec03 14 Feb 55 Mussaibe 4 SP M ME 7 Feb 04 7 Mar 180 Najaf 2 CP M GRD/RIE 5 Dec 03 30 Apr 50 New Mulla 1 CP M GRD/RIE 13 Jan 04 1 Jun 30 Old Mulla 5 CP M GRD/RIE 1 Nov 03 1 Jun 15 Old Mulla 10 CP M GRD/RIE 6 Jan 04 1 Jun 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 1 Jun 15 Taji 7 CP R GRD/RIE 1 Oct 03 TBD 15 South Baghdad 1 SP M ME 12 Feb 04 4 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 4 Apr 30 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 1 May Haditha-Baghd West 400 Sabotage GRD/RIE 22 Mar 41 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE 29 Feb 264 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE 5 Mar 68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE 20 Feb 81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME TBD No contract awarded Baiji – Haditha 400 Sabotage ME TBD No contract awarded Diyala Connection 400 Sabotage ME 30 Apr Mosul – Mosul East 132 Sabotage ME TBD Dibis/Irbil-Azadi/Quarqush 132 New Line GRD/RIE 1 Jun Shuwaiba-Toba-Hamar 132 Sabotage ME 15 Feb Baghd West – Jamia 132 Sabotage ME TBD Omara-Burzegan 132 Looting ME 1 Mar Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Report Date - 14 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 850 MW. Power transferred from South to Middle 292 MW. Baghdad 1700 35570 1482 Duhok 80 1916 80 Naynawa 400 9614 401 Tamim 151 3643 152 Salah Aldeen 230 4963 207 Anbar 202 4503 188 Dyala 118 2522 105 Babil 110 2614 109 Kirbala 128 2799 117 Najaf 135 3097 129 Kadsya 70 1446 60 Wasit 100 2445 102 Muthana 65 1389 58 Nasirya 130 2886 120 Misan 65 1419 59 Basra 270 7523 313 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 4