DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 23, 2004

التاريخ
23 شباط 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 23, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 4166Mw, 90,119Mw hours, 7-day Avg. 4194Mw Generators Returned to Service 30 Mw South Baghdad 4 30 Mw Generators Unscheduled Out of Service 631 Mw 876 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 2 SP Boiler Leak 8 Dibis 4 SP Boiler Leak 8 South Baghdad 5 SP Boiler Leak 30 * Hartha 4 SP Condensation Pump 150 Baiji 1 CP Line Trip 85 Baiji 2, CP Lubricating oil leak 110 Hilla 1 CP Cooling System problems 20 Hilla 2 CP Servo 20 Khor Zubayr 4 CP Testing 50 Mosil 1 CP Rotor Defect 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo 15 New Mulla 2 CP Maintenance 30 New Mulla 6 CP Generator Defect 30 Taji 3, CP Compressor 15 Taji Mobile, 2 CP Software problem 15 * RED – Denotes out of service since last report Generators Scheduled Out of Service 811 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 4 Mar 100 Doura 3 CP R GRD/RIE 1 Mar 03 15 May 20 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 30 Apr 100 Doura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME 30Dec 03 31 May 8 Dibis 4 CP R GRD/RIE Sep 03 30 Mar 18 Mussaibe 4 SP M ME 7 Feb 04 7 Mar 180 Najaf 2 CP M GRD/RIE 5 Dec 03 30 Apr 50 New Mulla 1 CP M GRD/RIE 13 Jan 04 15 May 30 Old Mulla 5 CP M GRD/RIE 1 Nov 03 15 May 15 Old Mulla 10 CP M GRD/RIE 6 Jan 04 15 May 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 Taji 7 CP R GRD/RIE 1 Oct 03 TBD 15 Shuaiba 1 CP M ME 14 Feb 04 31 May 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 1 May 102 towers complete/211req’d Haditha-Baghd West 400 Sabotage GRD/RIE 20 Apr 45 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE 7 Mar 281 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE 14 Mar 68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE 28 Feb 81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE Compl. 24 Jan 27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME TBD No contract awarded Baiji – Haditha 400 Sabotage ME TBD No contract awarded Diyala Connection 400 New Line ME 30 Apr Dibis/Irbil-Quarqush 132 New Line GRD/RIE 15 May Contractor on-site 20 Feb Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME 15 Feb/TBD 43 towers complete/43 req’d Baghd West – Jamia 132 Sabotage ME TBD Omara-Burzegan 132 Looting ME 1 May 26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Report Date - 23 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 780 MW. Power transferred from South to Middle 150 MW. Baghdad 1221 30836 1285 Duhok 70 1717 72 Naynawa 470 9538 397 Tamim 165 3587 149 Salah Aldeen 220 4751 198 Anbar 175 4067 169 Dyala 85 1969 82 Babil 85 2447 102 Kirbala 124 2527 105 Najaf 140 2844 119 Kadsya 75 1458 61 Wasit 85 2187 91 Muthana 65 1336 56 Nasirya 135 2716 113 Misan 65 1481 62 Basra 360 7565 315 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3