DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 23, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 4166Mw, 90,119Mw hours, 7-day Avg. 4194Mw
Generators Returned to Service 30 Mw South Baghdad 4 30 Mw
Generators Unscheduled Out of Service 631 Mw 876 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler Leak
8
Dibis 4
SP
Boiler Leak
8
South Baghdad 5
SP
Boiler Leak
30
* Hartha 4
SP
Condensation Pump
150
Baiji 1
CP
Line Trip
85
Baiji 2,
CP
Lubricating oil leak
110
Hilla 1
CP
Cooling System problems
20
Hilla 2
CP
Servo
20
Khor Zubayr 4
CP
Testing
50
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
New Mulla 2
CP
Maintenance
30
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 811 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
180
Najaf 2
CP
M
GRD/RIE
5 Dec 03
30 Apr
50
New Mulla 1
CP
M
GRD/RIE
13 Jan 04
15 May
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
15 May
15
Old Mulla 10
CP
M
GRD/RIE
6 Jan 04
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
1 May
102 towers complete/211req’d Haditha-Baghd West 400 Sabotage GRD/RIE
20 Apr
45 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
7 Mar
281 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
14 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
28 Feb
81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE
Compl. 24 Jan
27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
15 Feb/TBD
43 towers complete/43 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date - 23 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 780 MW.
Power transferred from South to Middle 150 MW.
Baghdad
1221
30836
1285
Duhok
70
1717
72
Naynawa
470
9538
397
Tamim
165
3587
149
Salah Aldeen
220
4751
198
Anbar
175
4067
169
Dyala
85
1969
82
Babil
85
2447
102
Kirbala
124
2527
105
Najaf
140
2844
119
Kadsya
75
1458
61
Wasit
85
2187
91
Muthana
65
1336
56
Nasirya
135
2716
113
Misan
65
1481
62
Basra
360
7565
315
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-ea1b8269
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 23, 2004
- Date
- 23 February 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1