الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً

Reporting Peak for 22 MARCH 2004 / Report Date - 23 MARCH 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas42881624#3 FWP; #4 prog maint
BaijiFuel Oil6212585210500#1 & #3 prog maint; #4 starting; #5 forced outage; #6 limited to crack in furnace wall
DauraFuel Oil416565180#4 prog maint; #5 & #6 rehab
South BaghdadFuel Oil613030200#1, #2, #3 prog maint; #4 stopped at 1320 boiler leakage to be start tomorrow; #5 a/h to be start afternoon
MussaibeCrude and Fuel Oil42200225425860#2 prog maint; #4 prog maint
NassiryaCrude42140150290600#2 prog maint; #4 IDF defect - to be start tomorrow
NajebiaNatural Gas and Crude219090160#4 oil leakage to be start after 48 hrs
HarthaNatural Gas and Crude4255150205300load flow problem
Out of Service for Unscheduled MaintanenceTotal:1,3312,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 22 MARCH 2004 / Report Date - 23 MARCH 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #3 FWP; #4 prog maint Baiji Fuel Oil 6 2 125 85 210 500 #1 & #3 prog maint; #4 starting; #5 forced outage; #6 limited to crack in furnace wall Daura Fuel Oil 4 1 65 65 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 1 30 30 200 #1, #2, #3 prog maint; #4 stopped at 1320 boiler leakage to be start tomorrow; #5 a/h to be start afternoon Mussaibe Crude and Fuel Oil 4 2 200 225 425 860 #2 prog maint; #4 prog maint Nassirya Crude 4 2 140 150 290 600 #2 prog maint; #4 IDF defect - to be start tomorrow Najebia Natural Gas and Crude 2 1 90 90 160 #4 oil leakage to be start after 48 hrs Hartha Natural Gas and Crude 4 2 55 150 205 300 load flow problem Out of Service for Unscheduled Maintanence Total: 1331 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 22 MARCH 2004 / Report Date - 23 MARCH 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 2 170+55 125 Gas Oil #2 synch at 1350+3 mobil gass unit at peak load Musil Dam Main 4 4 620 600 Quds 2 2 200 160 Gas Oil 46 trucks Musil Dam reg 4 3 30 60 1100 Mosil 12 7 50 150 13 #1 rotor defect; #2 prog maint - NGPL; #8 stopped at 1710; #11 HP Musil Pumping 2 1 110 0 Dibis 3 2 50 30 28 #4 rehab Haditha Dam 6 4 216 160 2100 Old Mulla 12 6 96 128 420 #1 acc gear; #2 servo; #5 inlet valve; #8 VIB; #9 & #10 Cp explosion; #12 needs rehab Samarra 3 3 80 55 780 New Mulla 6 5 170 173 2.9 #6 generator defect sch at 15/5 Himrin 2 2 45 21 200 Taji 7 55 #3 compressor; #7 needs rehab - no control card NG press low Hindia 4 3 4 5 160 M. Taji 2 18 #2 software + NGPL Kufa 4 0 Daura 4 30 #2 prog maint; #3 needs rehab NG press low Total 1105 896 Hilla 4 4 59 64 31 #3 synch at 1214 System Generation 78213 MWh Najaf 3 3 137 129 29 Syrian Line Generation 1373 MWh Khor 4 3 125 80 Natural Gas #2 prog maint; #4 synch at 1341 Turkey Line Generation 1927 MWh Shuaiba 2 2 7 20 Natural Gas Total Generation 86940 MWh M. Shuaiba 2 Natural Gas System Peak Load 3610 MW Petro 4 1 10 0 Natural Gas #2 vib Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 2 10 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 4016 MW Diesel 48 Gas Oil Baghdad Load 1380 MW Total 973 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 22 MARCH 2004 / Report Date - 23 MARCH 2004 Power transferred from North to Middle 780 MW. Power transferred from South to Middle 85 MW. GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1380 29948 1248 Duhok 80 1924 80 Naynawa 335 8723 363 Tamim 140 3253 136 Salah Aldeen 210 5339 222 Anbar 205 5052 211 Dyala 100 2626 109 Babil 110 2715 113 Kirbala 94 2144 89 Najaf 115 2690 112 Kadsya 70 1516 63 Wasit 90 2178 91 Muthana 59 1474 61 Nasirya 120 2721 113 Misan 65 1510 63 Basra 275 5985 248