DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 23, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output.
Generation:
Peak Power 4016Mw, 89,940Mw hours, 7-day Avg. 4132Mw
Generators Returned to Service: 170 Mw Baiji 2, CP 110 Mw Hilla 3 20 Mw Khor Zubayr 4 40 Mw
Generators Unscheduled Out of Service (19) 598Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Dibis 3
SP
Feed water pump
8
Baiji 4
SP
High water Consumption
90
* South Baghdad 4
SP
Boiler Leak
30
South Baghdad 5
SP
Air Heater
30
Nassirya 4
SP
Turbine
125
Najebia 4
SP
Oil Leak
90
Mosil 1
CP
Rotor Defect
15
* Mosil 8
CP
Emergency stop
15
Mosil 9
CP
Rotor Defect
15
Mosil 11
CP
Hydraulic Pressure
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
Old Mulla 8
CP
Vibrations
15
Old Mulla 5
CP
Inlet Valve
15
Old Mulla 9,10
CP
Transformer damage
30
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report Generators Scheduled Out of Service (21) 1478 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
21 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 2
CP
M
ME
21 Feb 04
15 May
20
Doura 3
CP
R
TBD
1 Mar 03
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 May
100
Doura 6
SP
R
Bechtel
Jul 03
30 Jun
100
Dibis 3
SP
M
GRD-RIE
30Dec 03
1 Aug
110
Dibis 4
CP
R
GRD/RIE
Sep 03
1 Sep
110
Khor Zubayr 2
CP
M
GRD/RIE
15 Mar 04
21 May
50
Mosil 2
CP
M
ME
21 Mar 04
TBD
15
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
15 May
200
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
297 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
31 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 May
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
15 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Bids for work under evaluation Jazair to Yarmook 132 Reconductor GRD-RIE
15 Jun
Bids for work under evaluation Baghd West – Jamia 132 Sabotage ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
15 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service: None reported today Distribution:
Report Date -23 MARCH 2004 Power transferred from North to Middle 780 MW.
Power transferred from South to Middle 85 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1380
29948
1248
Duhok
80
1924
80
Naynawa
335
8723
363
Tamim
140
3253
136
Salah Aldeen
210
5339
222
Anbar
205
5052
211
Dyala
100
2626
109
Babil
110
2715
113
Kirbala
94
2144
89
Najaf
115
2690
112
Kadsya
70
1516
63
Wasit
90
2178
91
Muthana
59
1474
61
Nasirya
120
2721
113
Misan
65
1510
63
Basra
275
5985
248
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 3 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-23d94f12
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 23, 2004
- التاريخ
- 23 آذار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: