Generation:
Peak Power 4265Mw, 89, 687Mw hours, 7-day Avg. 4039Mw Generators Returned to Service: (1) 8 Mw Dibis 4, SP 8 Mw
Generators Unscheduled Out of Service (18) 680 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Mussaibe 3
SP
Condenser Cleaning
200
Najebia 5
SP
Thrust bearing problem
80
* Nassirya 4
SP
Boiler Leak
130
Baiji Mobile, 4
CP
Fuel Filters
25
Doura 1,2
CP
No gas pressure
40
Mosil 2
CP
Reverse Power
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 7
CP
High exhaust temp
15
* Najaf 1
CP
Testing
20
* Najaf 3
CP
Turbine protection trip
20
New Mulla 5
CP
Stopped to connect # 6
30
* Shuaiba 2
CP
Oil cooling problem
15
Taji 1,2,5
CP
No gas pressure
45
M. Taji 1
CP
Planned Outage
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report
Generators Scheduled Out of Service (30) 1373 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
Bechtel
21 Mar 04
21 May
100
Dibis 3
SP
M
ME
26 Apr 04
TBD
8
Baiji 2
CP
M
ME
11 May 04
18 May
80
Doura 4
CP
M
ME
14 Apr 04
31 May
20
Doura 3
CP
R
ME
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
TBD
65
Doura 5
SP
R
Bechtel
Jul 03
Aug
100
Doura 6
SP
R
Bechtel
Jul 03
Sep
100
Dibis 4
CP
R
GRD/RIE
Sep 03
23 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
3 Jul
50
Mosil 1
CP
R
GRD/RIE
24 Apr 04
11 Jun
15
Mosil 7
CP
M
ME
24 Apr 04
18 May
15
Mosil 8
CP
R
GRD/RIE
6 Feb 04
11Jun
15
Mussaibe 2
SP
M (Additional work)
ME
28 Feb 04
20 May
200
Nassirya 1
SP
M
ME
30 Mar 04
21 May
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
23 May
30
Old Mulla 1
CP
M
GRD/RIE
17 Apr 04
15 Jun
15
Old Mulla 2
CP
M
GRD/RIE
17 Apr 04
6 Jun
15
Old Mulla 5
CP
M
GRD/RIE
17 Apr 04
6 Jun
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
12 Jun
15
South Baghdad 1
SP
M
ME
12 Feb 04
21 May
30
South Baghdad 2
SP
M
ME
12 Feb 04
20 May
30
South Baghdad 3
SP
R
ME
18 Mar 04
6 Jun
20
South Baghdad 5
SP
M
ME
15May 04
30 May
30
Taji 3
CP
R
GRD/RIE
6 Feb 04
23 Jul
15
Taji 4
CP
M
GRD/RIE
21 Apr 04
8 Jun
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
24 JUL
15
Taji 6
CP
M
ME
2 Apr 04
26 May
15
New In-service date
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
159 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Complete
246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE
Complete
23 Apr Operational
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
28 Feb 05
Start date 21 May 04
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Foundations under construction Dibis/Erbil-Qara Quosh 132 New Line GRD/RIE
1 Jun
Construction ongoing
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
31 Jul
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
TBD
Assessment underway
Jazair to Yarmook
132
Reconductor
GRD-RIE
TBD
Assessment underway
Baghd West – Jamia
132
Sabotage
ME
TBD
Burzulgan-Old Amarah
132
Looting
GRD-RIE
25 Jun
Assessment underway
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution: No report today Power transferred from North to Middle 750 MW.
Power transferred from South to Middle 100 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1553
30108
1255
1537
Duhok
80
1910
80
114
Naynawa
355
8280
345
494
Tamim
139
3107
129
182
Salah Aldeen
210
4712
196
248
Anbar
212
4613
192
236
Dyala
91
2249
94
140
Babil
95
2249
94
137
Kirbala
80
1775
74
107
Najaf
95
2116
88
125
Kadsya
58
1303
54
85
Wasit
89
229
85
119
Muthana
65
1253
52
74
Nasirya
135
2605
109
124
Misan
69
1463
61
78
Basra
320
6913
288
342
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-638ae97d
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 16 2004
- التاريخ
- 16 أيار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: