DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 16 2004

Date
16 May 2004
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 16 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 4265Mw, 89, 687Mw hours, 7-day Avg. 4039Mw Generators Returned to Service: (1) 8 Mw Dibis 4, SP 8 Mw Generators Unscheduled Out of Service (18) 680 Mw PLANT Type SP, CP, RP, HP Fault Mw * Mussaibe 3 SP Condenser Cleaning 200 Najebia 5 SP Thrust bearing problem 80 * Nassirya 4 SP Boiler Leak 130 Baiji Mobile, 4 CP Fuel Filters 25 Doura 1,2 CP No gas pressure 40 Mosil 2 CP Reverse Power 15 Mosil 9 CP Rotor Defect 15 Old Mulla 7 CP High exhaust temp 15 * Najaf 1 CP Testing 20 * Najaf 3 CP Turbine protection trip 20 New Mulla 5 CP Stopped to connect # 6 30 * Shuaiba 2 CP Oil cooling problem 15 Taji 1,2,5 CP No gas pressure 45 M. Taji 1 CP Planned Outage 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (30) 1373 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M Bechtel 21 Mar 04 21 May 100 Dibis 3 SP M ME 26 Apr 04 TBD 8 Baiji 2 CP M ME 11 May 04 18 May 80 Doura 4 CP M ME 14 Apr 04 31 May 20 Doura 3 CP R ME 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 TBD 65 Doura 5 SP R Bechtel Jul 03 Aug 100 Doura 6 SP R Bechtel Jul 03 Sep 100 Dibis 4 CP R GRD/RIE Sep 03 23 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 3 Jul 50 Mosil 1 CP R GRD/RIE 24 Apr 04 11 Jun 15 Mosil 7 CP M ME 24 Apr 04 18 May 15 Mosil 8 CP R GRD/RIE 6 Feb 04 11Jun 15 Mussaibe 2 SP M (Additional work) ME 28 Feb 04 20 May 200 Nassirya 1 SP M ME 30 Mar 04 21 May 130 New Mulla 6 CP R GRD/RIE 28 Mar 04 23 May 30 Old Mulla 1 CP M GRD/RIE 17 Apr 04 15 Jun 15 Old Mulla 2 CP M GRD/RIE 17 Apr 04 6 Jun 15 Old Mulla 5 CP M GRD/RIE 17 Apr 04 6 Jun 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 12 Jun 15 South Baghdad 1 SP M ME 12 Feb 04 21 May 30 South Baghdad 2 SP M ME 12 Feb 04 20 May 30 South Baghdad 3 SP R ME 18 Mar 04 6 Jun 20 South Baghdad 5 SP M ME 15May 04 30 May 30 Taji 3 CP R GRD/RIE 6 Feb 04 23 Jul 15 Taji 4 CP M GRD/RIE 21 Apr 04 8 Jun 15 Taji 7 CP R GRD/RIE 1 Oct 03 24 JUL 15 Taji 6 CP M ME 2 Apr 04 26 May 15 New In-service date LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 159 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE Complete 246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE Complete 23 Apr Operational Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete Operational Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE 28 Feb 05 Start date 21 May 04 Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 15 Jun Foundations under construction Dibis/Erbil-Qara Quosh 132 New Line GRD/RIE 1 Jun Construction ongoing Dibis to Old Kirkuk 132 Reconductor GRD-RIE 31 Jul Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE TBD Assessment underway Jazair to Yarmook 132 Reconductor GRD-RIE TBD Assessment underway Baghd West – Jamia 132 Sabotage ME TBD Burzulgan-Old Amarah 132 Looting GRD-RIE 25 Jun Assessment underway Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: No report today Power transferred from North to Middle 750 MW. Power transferred from South to Middle 100 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1553 30108 1255 1537 Duhok 80 1910 80 114 Naynawa 355 8280 345 494 Tamim 139 3107 129 182 Salah Aldeen 210 4712 196 248 Anbar 212 4613 192 236 Dyala 91 2249 94 140 Babil 95 2249 94 137 Kirbala 80 1775 74 107 Najaf 95 2116 88 125 Kadsya 58 1303 54 85 Wasit 89 229 85 119 Muthana 65 1253 52 74 Nasirya 135 2605 109 124 Misan 69 1463 61 78 Basra 320 6913 288 342 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3