# A-Steam Power Stations
REPORT DATE - 13 JANUARY 2004
A - Steam Power Stations
Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 8 8 24 #1 prog maint; #3 prog maint; #4 live steam pipe leakage Baiji Fuel Oil 6 2 90 95 185 500 #2 prog maint; #3 thrust bearing defect; #5 forced outage; #6 prog maint Daura Fuel Oil 4 1 80 80 180 #4 rotor repair; #5 & #6 rehab South Baghdad Fuel Oil 6 3 30 20 30 80 200 #2 air heater defect; #4 stopped at 2200 boiler leakage; #5 prog maint Mussaibe Crude and Fuel Oil 4 3 220 100 220 540 860 #2 synco at 1235; #3 hydraulic test Nassirya Crude 4 3 130 140 150 420 600 #4 prog maint. 28 DEC to 28 JAN.
Najebia Natural Gas and Crude 2 0 160 shut down at 2240 due to heavy rain Hartha Natural Gas and Crude 4 0 300 shut down at 2240 due to heavy rain; #4 prog maint Out of Service for Unscheduled Maintanence Total: 1313 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date- 13 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 130 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 3 380 600 Quds 2 2 205 160 Gas Oil fuel lever 5: 20m Musil Dam reg 4 3 38 60 450 Mosil 12 8 125 150 29 #1 rotor defect; #2 servo + ACC; #3 prog maint; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 27 30 28 #4 and #5 rehab Haditha Dam 6 2 22 160 Old Mulla 12 8 97 128 30 #1 ACC gear; #2 servo; #5 prog maint; #7 prog maint; #12 rehab Samarra 3 2 33 55 New Mulla 6 3 92 173 30 #4 & #5 prog maint; #6 Generator defect Himrin 2 1 22 21 Taji 7 4 70 55 20 #3 Compressor; #4 turbine; #7 Rehab Hindia 4 4 5 5 M. Taji 2 1 7 18 #2 software. Kufa 4 0 Daura 4 2 50 30 21 #2 stopped at 2225 gen-diff; #3 Rehab Total 610 896 Hilla 4 64 11 gaspipe leakage System Generation 75103 MWh Najaf 3 1 22 129 11 #2 prog maint; #3 working on gas oil - gaspipe leakage Syrian Line Generation 1456 MWh Khor 4 3 75 80 Natural Gas synco - after shut down; #4 rehab Turkey Line Generation 214 MWh Shuaiba 2 1 5 20 Natural Gas synco - after shut down; #2 S/B Total Generation 76773 MWh M. Shuaiba 2 Natural Gas System Peak Load 3380 MW Petro 4 Natural Gas shut down at 2240 due to heavy rain Syria Peak Load 57 MW M. Dibis 4 3 30 24 Natural Gas Turkey Peak Load 82 MW Mossil East 5 3 21 0 Gas Oil Fixed Gen Peak Load 127 MW Hmam/Zafranya 7 Gas Oil Total Peak Load 3596 MW Diesel 12 Gas Oil Baghdad Load 1300 MW Total 968 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report - 13 January 2004
GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1300 24699 1029 Duhok 82 1939 81 Naynawa 320 8030 335 Tamim 140 3302 138 Salah Aldeen 200 4493 187 Anbar 183 4051 169 Dyala 55 1613 67 Babil 78 1808 75 Kirbala 80 1752 73 Najaf 100 2099 87 Kadsya 48 1248 52 Wasit 71 1820 76 Muthana 40 1210 50 Nasirya 130 2879 120 Misan 60 1288 54 Basra 325 7339 106
الرئيسية / الخدمات الأساسية / ESS-5740f81a
الخدمات الأساسية
System Status Jan 13
- التاريخ
- 13 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| REPORT DATE - 13 JANUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #1 prog maint; #3 prog maint; #4 live steam pipe leakage | |||||
| Baiji | Fuel Oil | 6 | 2 | 90 | 95 | 185 | 500 | #2 prog maint; #3 thrust bearing defect; #5 forced outage; #6 prog maint | ||||
| Daura | Fuel Oil | 4 | 1 | 80 | 80 | 180 | #4 rotor repair; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 3 | 30 | 20 | 30 | 80 | 200 | #2 air heater defect; #4 stopped at 2200 boiler leakage; #5 prog maint | |||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 220 | 100 | 220 | 540 | 860 | #2 synco at 1235; #3 hydraulic test | |||
| Nassirya | Crude | 4 | 3 | 130 | 140 | 150 | 420 | 600 | #4 prog maint. 28 DEC to 28 JAN. | |||
| Najebia | Natural Gas and Crude | 2 | 0 | 160 | shut down at 2240 due to heavy rain | |||||||
| Hartha | Natural Gas and Crude | 4 | 0 | 300 | shut down at 2240 due to heavy rain; #4 prog maint | |||||||
| Out of Service for Unscheduled Maintanence | Total: | 1,313 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date- 13 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 130 | 125 | Gas Oil | #2 lub oil leak from bearing | Musil Dam Main | 4 | 3 | 380 | 600 | |
| Quds | 2 | 2 | 205 | 160 | Gas Oil | fuel lever 5: 20m | Musil Dam reg | 4 | 3 | 38 | 60 | 450 |
| Mosil | 12 | 8 | 125 | 150 | 29 | #1 rotor defect; #2 servo + ACC; #3 prog maint; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 27 | 30 | 28 | #4 and #5 rehab | Haditha Dam | 6 | 2 | 22 | 160 | |
| Old Mulla | 12 | 8 | 97 | 128 | 30 | #1 ACC gear; #2 servo; #5 prog maint; #7 prog maint; #12 rehab | Samarra | 3 | 2 | 33 | 55 | |
| New Mulla | 6 | 3 | 92 | 173 | 30 | #4 & #5 prog maint; #6 Generator defect | Himrin | 2 | 1 | 22 | 21 | |
| Taji | 7 | 4 | 70 | 55 | 20 | #3 Compressor; #4 turbine; #7 Rehab | Hindia | 4 | 4 | 5 | 5 | |
| M. Taji | 2 | 1 | 7 | 18 | #2 software. | Kufa | 4 | 0 | ||||
| Daura | 4 | 2 | 50 | 30 | 21 | #2 stopped at 2225 gen-diff; #3 Rehab | Total | 610 | 896 | |||
| Hilla | 4 | 64 | 11 | gaspipe leakage | System Generation | 75,103 | MWh | |||||
| Najaf | 3 | 1 | 22 | 129 | 11 | #2 prog maint; #3 working on gas oil - gaspipe leakage | Syrian Line Generation | 1,456 | MWh | |||
| Khor | 4 | 3 | 75 | 80 | Natural Gas | synco - after shut down; #4 rehab | Turkey Line Generation | 214 | MWh | |||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | synco - after shut down; #2 S/B | Total Generation | 76,773 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,380 | MW | |||||||
| Petro | 4 | Natural Gas | shut down at 2240 due to heavy rain | Syria Peak Load | 57 | MW | ||||||
| M. Dibis | 4 | 3 | 30 | 24 | Natural Gas | Turkey Peak Load | 82 | MW | ||||
| Mossil East | 5 | 3 | 21 | 0 | Gas Oil | Fixed Gen Peak Load | 127 | MW | ||||
| Hmam/Zafranya | 7 | Gas Oil | Total Peak Load | 3,596 | MW | |||||||
| Diesel | 12 | Gas Oil | Baghdad Load | 1,300 | MW | |||||||
| Total | 968 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report - 13 January 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,300 | 24,699 | 1,029 |
| Duhok | 82 | 1,939 | 81 |
| Naynawa | 320 | 8,030 | 335 |
| Tamim | 140 | 3,302 | 138 |
| Salah Aldeen | 200 | 4,493 | 187 |
| Anbar | 183 | 4,051 | 169 |
| Dyala | 55 | 1,613 | 67 |
| Babil | 78 | 1,808 | 75 |
| Kirbala | 80 | 1,752 | 73 |
| Najaf | 100 | 2,099 | 87 |
| Kadsya | 48 | 1,248 | 52 |
| Wasit | 71 | 1,820 | 76 |
| Muthana | 40 | 1,210 | 50 |
| Nasirya | 130 | 2,879 | 120 |
| Misan | 60 | 1,288 | 54 |
| Basra | 325 | 7,339 | 106 |