Sheet “A-Steam Power Stations”: 16 rows × 13 columns

REPORT DATE - 13 JANUARY 2004
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas418824#1 prog maint; #3 prog maint; #4 live steam pipe leakage
BaijiFuel Oil629095185500#2 prog maint; #3 thrust bearing defect; #5 forced outage; #6 prog maint
DauraFuel Oil418080180#4 rotor repair; #5 & #6 rehab
South BaghdadFuel Oil6330203080200#2 air heater defect; #4 stopped at 2200 boiler leakage; #5 prog maint
MussaibeCrude and Fuel Oil43220100220540860#2 synco at 1235; #3 hydraulic test
NassiryaCrude43130140150420600#4 prog maint. 28 DEC to 28 JAN.
NajebiaNatural Gas and Crude20160shut down at 2240 due to heavy rain
HarthaNatural Gas and Crude40300shut down at 2240 due to heavy rain; #4 prog maint
Out of Service for Unscheduled MaintanenceTotal:1,3132,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations REPORT DATE - 13 JANUARY 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 8 8 24 #1 prog maint; #3 prog maint; #4 live steam pipe leakage Baiji Fuel Oil 6 2 90 95 185 500 #2 prog maint; #3 thrust bearing defect; #5 forced outage; #6 prog maint Daura Fuel Oil 4 1 80 80 180 #4 rotor repair; #5 & #6 rehab South Baghdad Fuel Oil 6 3 30 20 30 80 200 #2 air heater defect; #4 stopped at 2200 boiler leakage; #5 prog maint Mussaibe Crude and Fuel Oil 4 3 220 100 220 540 860 #2 synco at 1235; #3 hydraulic test Nassirya Crude 4 3 130 140 150 420 600 #4 prog maint. 28 DEC to 28 JAN. Najebia Natural Gas and Crude 2 0 160 shut down at 2240 due to heavy rain Hartha Natural Gas and Crude 4 0 300 shut down at 2240 due to heavy rain; #4 prog maint Out of Service for Unscheduled Maintanence Total: 1313 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Report Date- 13 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 130 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 3 380 600 Quds 2 2 205 160 Gas Oil fuel lever 5: 20m Musil Dam reg 4 3 38 60 450 Mosil 12 8 125 150 29 #1 rotor defect; #2 servo + ACC; #3 prog maint; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 27 30 28 #4 and #5 rehab Haditha Dam 6 2 22 160 Old Mulla 12 8 97 128 30 #1 ACC gear; #2 servo; #5 prog maint; #7 prog maint; #12 rehab Samarra 3 2 33 55 New Mulla 6 3 92 173 30 #4 & #5 prog maint; #6 Generator defect Himrin 2 1 22 21 Taji 7 4 70 55 20 #3 Compressor; #4 turbine; #7 Rehab Hindia 4 4 5 5 M. Taji 2 1 7 18 #2 software. Kufa 4 0 Daura 4 2 50 30 21 #2 stopped at 2225 gen-diff; #3 Rehab Total 610 896 Hilla 4 64 11 gaspipe leakage System Generation 75103 MWh Najaf 3 1 22 129 11 #2 prog maint; #3 working on gas oil - gaspipe leakage Syrian Line Generation 1456 MWh Khor 4 3 75 80 Natural Gas synco - after shut down; #4 rehab Turkey Line Generation 214 MWh Shuaiba 2 1 5 20 Natural Gas synco - after shut down; #2 S/B Total Generation 76773 MWh M. Shuaiba 2 Natural Gas System Peak Load 3380 MW Petro 4 Natural Gas shut down at 2240 due to heavy rain Syria Peak Load 57 MW M. Dibis 4 3 30 24 Natural Gas Turkey Peak Load 82 MW Mossil East 5 3 21 0 Gas Oil Fixed Gen Peak Load 127 MW Hmam/Zafranya 7 Gas Oil Total Peak Load 3596 MW Diesel 12 Gas Oil Baghdad Load 1300 MW Total 968 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Report - 13 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1300 24699 1029 Duhok 82 1939 81 Naynawa 320 8030 335 Tamim 140 3302 138 Salah Aldeen 200 4493 187 Anbar 183 4051 169 Dyala 55 1613 67 Babil 78 1808 75 Kirbala 80 1752 73 Najaf 100 2099 87 Kadsya 48 1248 52 Wasit 71 1820 76 Muthana 40 1210 50 Nasirya 130 2879 120 Misan 60 1288 54 Basra 325 7339 106