Power System Highlights for January 13, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Power from Syria restored.
Generation:
Daily System peak on 12 Jan – 3,596Mw.
Daily system Demand on 12 Jan – 5,667 Mw (Estimated) (3596 Actual Generation, + 1755 Load Shed, + 316 Corrected Frequency, = 5667)
Total generation – 76,773Mwh
Imported power - Power from Syria (57Mw) and Turkey (82Mw) included in System Peak
Generators Returned to Service 115 Mw Mussaibe 2, SP 100 Mw Old Mulla 6, NG, Accessory Gear 15Mw
Generators Unscheduled Out of Service as of 12 JAN 04 1098 Mw
Dibis 4, SP, Steam Leak
8 Mw
Baiji 5, SP, Forced Outage (No ECD)
100 Mw
Baiji 3, SP, Thrust bearing defect
100 Mw
Daura 4, Rotor
100 Mw
South Baghdad 2, A/H
30 Mw
*South Baghdad 4, Boiler leakage
25Mw
Mussaibe 3, SP, Hydraulic test
150Mw
*Najebia 4, shut down due to heavy rain
35 Mw
*Najebia 5, shut down due to heavy rain
90Mw
*Hartha 1, shut down due to heavy rain
140Mw
Baiji 2, NG, Lubricating oil leak
60 Mw
Mosil 1, NG, Rotor Defect
15 Mw
Mosil 2, NG, Servo problem
15 Mw
Mosil 9, NG, Rotor Defect
15 Mw
Old Mulla 1,NG, Acc Gear
15 Mw
Old Mulla 2, NG, Servo and Circuit breaker problem
15 Mw
New Mulla 6, NG, Generator Defect
30 Mw
Taji 3, NG, Compressor
15 Mw
Taji 4, NG, Turbine problem
15 Mw
*Daura 2, generator differential
20Mw
Hilla,1,2,3,4, NG, Gas leak, caused low gas pressure
80 Mw
Taji Mobile, 2, NG, Software problem
10 Mw
Shuaiba 2, NG, Stand By
5 Mw
*Petro 1, NG, shut down due to heavy rain
10Mw
* RED – Denotes out of service since last report
Generators Scheduled Out of Service as of 12 JAN 04 1009 Mw
2 Thermal units off-line for rehabilitation ------------------------------------------------ 200 Mw Daura 5 and 6 200 Mw – ECD May 2004
6 Thermal units in programmed maintenance ----------------------------------------- 531 Mw Dibis 1 8 Mw – ECD Jan 25 Dibis 3 8 Mw – ECD Feb15 Baiji 2 100 Mw – ECD Mar 04 Baiji 6 100 Mw – ECD Jan 19 South Baghdad 5 35 Mw – ECD Jan 15 Nassirya 4 130 Mw – ECD Jan 28 Hartha 4 150 Mw – ECD slipped to Jan 23
6 Gas Turbine units off-line for rehabilitation ---------------------------------------------123 Mw Dibis 4, 5, 18 Mw Old Mulla 12 15 Mw Taji 7 15 Mw Daura 3 20 Mw Khor Zubayr 4 55 Mw
5 Gas Turbine units in programmed maintenance---------------------------------------155 Mw Mosil 3 15 Mw Old Mulla 5,7 30 Mw New Mulla 4, 5 60 Mw (#5 ECD Mar 31) Najaf 2 50 Mw (ECD Apr 30)
Transmission:
Countrywide, Iraq’s electrical output continues to be constrained by damaged transmission and distribution lines. The lines have come down due to sabotage and bad weather. Downed transmission lines increase the probability for complete nationwide blackout by reducing system contingency and causing mechanical damage at power plants. This may cause further temporary blackouts, which have already directly resulted in 1) impacted refineries causing reduced fuel flow to power plants and a subsequent reduction in power supply, and 2) damages in the power plants due to undercurrent causing units to come off-line for unscheduled maintenance.
Transmission Lines out of service:
400KV
Nassiriya-Khor Zubayr – ECD May 1 Haditha-Baghdad West – ECD slipped from Jan 24 to Feb 29 Haditha-Qarna – Wasit – ECD slipped from Jan 12 to Jan 31 Baghdad South – Qadisseya – ECD Jan 20 Baiji - Baghdad West #1 – ECD Jan 24 New line - Baghdad East-Baghdad South #2 – ECD Jan 23 Haditha – Qaim – no funding Baiji – Haditha – no funding/no contractor Diyala Connection – ECD April 30 Baiji – Mosul – Line hit by helicopter 9 Jan, ECD, TBD
132KV
Mosul – Mosul East is sabotaged Shuwaiba-Toba-Hamar– ECD Dec 30, (delay due to material shortage) Baghdad West – Jamia – ECD TBD Omara-Burzegan – Sabotaged. ECD March 2004 Temim- Tuz – ECD TBD Nejibiya – Hartha ECD TBD
Lines Returned to service:
None reported today
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
NG: NATURAL GAS
SP: STEAM POWER – These plants use either fuel oil or crude in burners HYDRO: WATER POWER
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-bc27af8f
الخدمات الأساسية
Power System Highlights for January 13, 2004
- التاريخ
- 13 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: