Power System Highlights for January 13, 2004

التاريخ
13 كانون الثاني 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
Power System Highlights for January 13, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Power from Syria restored. Generation: Daily System peak on 12 Jan – 3,596Mw. Daily system Demand on 12 Jan – 5,667 Mw (Estimated) (3596 Actual Generation, + 1755 Load Shed, + 316 Corrected Frequency, = 5667) Total generation – 76,773Mwh Imported power - Power from Syria (57Mw) and Turkey (82Mw) included in System Peak Generators Returned to Service 115 Mw Mussaibe 2, SP 100 Mw Old Mulla 6, NG, Accessory Gear 15Mw Generators Unscheduled Out of Service as of 12 JAN 04 1098 Mw Dibis 4, SP, Steam Leak 8 Mw Baiji 5, SP, Forced Outage (No ECD) 100 Mw Baiji 3, SP, Thrust bearing defect 100 Mw Daura 4, Rotor 100 Mw South Baghdad 2, A/H 30 Mw *South Baghdad 4, Boiler leakage 25Mw Mussaibe 3, SP, Hydraulic test 150Mw *Najebia 4, shut down due to heavy rain 35 Mw *Najebia 5, shut down due to heavy rain 90Mw *Hartha 1, shut down due to heavy rain 140Mw Baiji 2, NG, Lubricating oil leak 60 Mw Mosil 1, NG, Rotor Defect 15 Mw Mosil 2, NG, Servo problem 15 Mw Mosil 9, NG, Rotor Defect 15 Mw Old Mulla 1,NG, Acc Gear 15 Mw Old Mulla 2, NG, Servo and Circuit breaker problem 15 Mw New Mulla 6, NG, Generator Defect 30 Mw Taji 3, NG, Compressor 15 Mw Taji 4, NG, Turbine problem 15 Mw *Daura 2, generator differential 20Mw Hilla,1,2,3,4, NG, Gas leak, caused low gas pressure 80 Mw Taji Mobile, 2, NG, Software problem 10 Mw Shuaiba 2, NG, Stand By 5 Mw *Petro 1, NG, shut down due to heavy rain 10Mw * RED – Denotes out of service since last report Generators Scheduled Out of Service as of 12 JAN 04 1009 Mw 2 Thermal units off-line for rehabilitation ------------------------------------------------ 200 Mw Daura 5 and 6 200 Mw – ECD May 2004 6 Thermal units in programmed maintenance ----------------------------------------- 531 Mw Dibis 1 8 Mw – ECD Jan 25 Dibis 3 8 Mw – ECD Feb15 Baiji 2 100 Mw – ECD Mar 04 Baiji 6 100 Mw – ECD Jan 19 South Baghdad 5 35 Mw – ECD Jan 15 Nassirya 4 130 Mw – ECD Jan 28 Hartha 4 150 Mw – ECD slipped to Jan 23 6 Gas Turbine units off-line for rehabilitation ---------------------------------------------123 Mw Dibis 4, 5, 18 Mw Old Mulla 12 15 Mw Taji 7 15 Mw Daura 3 20 Mw Khor Zubayr 4 55 Mw 5 Gas Turbine units in programmed maintenance---------------------------------------155 Mw Mosil 3 15 Mw Old Mulla 5,7 30 Mw New Mulla 4, 5 60 Mw (#5 ECD Mar 31) Najaf 2 50 Mw (ECD Apr 30) Transmission: Countrywide, Iraq’s electrical output continues to be constrained by damaged transmission and distribution lines. The lines have come down due to sabotage and bad weather. Downed transmission lines increase the probability for complete nationwide blackout by reducing system contingency and causing mechanical damage at power plants. This may cause further temporary blackouts, which have already directly resulted in 1) impacted refineries causing reduced fuel flow to power plants and a subsequent reduction in power supply, and 2) damages in the power plants due to undercurrent causing units to come off-line for unscheduled maintenance. Transmission Lines out of service: 400KV Nassiriya-Khor Zubayr – ECD May 1 Haditha-Baghdad West – ECD slipped from Jan 24 to Feb 29 Haditha-Qarna – Wasit – ECD slipped from Jan 12 to Jan 31 Baghdad South – Qadisseya – ECD Jan 20 Baiji - Baghdad West #1 – ECD Jan 24 New line - Baghdad East-Baghdad South #2 – ECD Jan 23 Haditha – Qaim – no funding Baiji – Haditha – no funding/no contractor Diyala Connection – ECD April 30 Baiji – Mosul – Line hit by helicopter 9 Jan, ECD, TBD 132KV Mosul – Mosul East is sabotaged Shuwaiba-Toba-Hamar– ECD Dec 30, (delay due to material shortage) Baghdad West – Jamia – ECD TBD Omara-Burzegan – Sabotaged. ECD March 2004 Temim- Tuz – ECD TBD Nejibiya – Hartha ECD TBD Lines Returned to service: None reported today LEGEND OF ELECTRICAL SYSTEM POWER SOURCE NG: NATURAL GAS SP: STEAM POWER – These plants use either fuel oil or crude in burners HYDRO: WATER POWER Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3