DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 17, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Expectations high that generation will increase soon as units return from maintenance.
We will continue to see decreased power as progress through the spring maintenance period.
Generation:
Peak Power 3610Mw, 75,016Mw hours, 7-day Avg. 3634Mw
Generators Returned to Service: 0 Mw
Generators Unscheduled Out of Service (17) 495 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* South Baghdad 5
SP
Boiler leak
30
* South Baghdad 5
SP
Boiler leak
30
Baiji 1
CP
Filter Cleaning
85
Baiji Mobile, 1,2,3,4
CP
No Fuel
100
* Doura 2
CP
High generator temp
20
Mosil 1
CP
Rotor Defect
15
* Khor Zubayr 4
CP
Primary Protector
50
Mosil 9
CP
Rotor Defect
15
* Mosil 11
CP
Vibrations
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 6
CP
High exhaust temperature
15
Old Mulla 7
CP
Generator Vibrations
15
Old Mulla 8
CP
Vibrations
15
Old Mulla 10
CP
Vibrations
15
Taji 3,
CP
Compressor
15
Taji 5
CP
Excitor problem
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report
Generators Scheduled Out of Service (27) 1923 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
15 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
20 Apr
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 4
CP
M
ME
14 Apr 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 1
CP
M
ME
4 Apr 04
TBD
50
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
15 Jun
50
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
30 Apr
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
Nassirya 3
SP
M
ME
31 Mar 04
15 Apr
130
Nassirya 4
SP
M
ME
31 Mar 04
15 Apr
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 2
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 6
CP
M
ME
2 Apr 04
TBD
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Complete
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
MoE completing PLC work
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
15 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
15 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution:
Power transferred from North to Middle 1020 MW.
Power transferred from South to Middle 220 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1130
23036
960
1449
Duhok
80
1894
79
112
Naynawa
295
6336
264
514
Tamim
120
2949
123
190
Salah Aldeen
195
4567
190
252
Anbar
220
4272
178
237
Dyala
95
1753
73
139
Babil
105
2112
88
141
Kirbala
115
2235
93
108
Najaf
125
2227
93
121
Kadsya
75
1809
75
131
Wasit
50
1219
51
89
Muthana
55
1360
57
76
Nasirya
80
2347
98
124
Misan
50
1462
61
80
Basra
290
6593
275
282
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-ef888874
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 17, 2004
- التاريخ
- 17 نيسان 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: