الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً

Reporting Peak for 15 APRIL 2004 / Report Date - 16 APRIL 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas438882424
BaijiFuel Oil6310080100280500
DauraFuel Oil40180
South BaghdadFuel Oil60200
MussaibeCrude and Fuel Oil42215215430860
NassiryaCrude40600
NajebiaNatural Gas and Crude226070130160
HarthaNatural Gas and Crude41180180300
Out of Service for Unscheduled MaintanenceTotal:1,0442,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 15 APRIL 2004 / Report Date - 16 APRIL 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 3 8 8 8 24 24 Baiji Fuel Oil 6 3 100 80 100 280 500 Daura Fuel Oil 4 0 180 South Baghdad Fuel Oil 6 0 200 Mussaibe Crude and Fuel Oil 4 2 215 215 430 860 Nassirya Crude 4 0 600 Najebia Natural Gas and Crude 2 2 60 70 130 160 Hartha Natural Gas and Crude 4 1 180 180 300 Out of Service for Unscheduled Maintanence Total: 1044 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 15 APRIL 2004 / Report Date - 16 APRIL 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 95 125 Gas Oil Musil Dam Main 4 4 600 600 M. Baiji 8 Gas Oil Musil Dam reg 4 4 48 60 Quds 2 2 150 160 Gas Oil Musil Pumping 2 1 110 0 Mosil 12 10 150 150 Haditha Dam 6 160 Dibis 3 2 50 30 Samarra 3 3 54 55 Old Mulla 12 6 83 128 Himrin 2 2 36 21 New Mulla 6 5 160 173 Hindia 4 4 6 5 Taji 7 4 57 55 Kufa 4 2 1 0 M. Taji 2 18 Total 855 896 Daura 4 2 35 30 System Generation MWh Hilla 4 4 65 64 Syrian Line Generation MWh Najaf 3 3 80 129 Turkey Line Generation MWh Khor 4 1 45 80 Natural Gas Total Generation 76668 MWh Shuaiba 2 1 8 20 Natural Gas System Peak Load 3389 MW M. Shuaiba 2 Natural Gas Syria Peak Load 60 MW Petro 4 1 10 0 Natural Gas Turkey Peak Load 85 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 4 22 0 Gas Oil Total Peak Load 3800 MW Hmam/Zafranya 7 2 59 Gas Oil Baghdad Load 1285 MW Diesel Gas Oil Total 1078 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 15 APRIL 2004 / Report Date - 16 APRIL 2004 GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1130 Duhok 80 Naynawa 295 Tamim 120 Salah Aldeen 195 Anbar 220 Dyala 95 Babil 105 Kirbala 115 Najaf 125 Kadsya 50 Wasit 75 Muthana 55 Nasirya 80 Misan 50 Basra 290