DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 29, 2004

التاريخ
29 آذار 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 29, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output. Generation: Peak Power 3856Mw, 85,989Mw hours, 7-day Avg. 4023Mw Generators Returned to Service: 140 Mw Nassirya 4 140 Mw Generators Unscheduled Out of Service (17) 480 Mw PLANT Type SP, CP, RP, HP Fault Mw * Baiji 4 SP Air Heater 80 Baiji 2 CP Testing 110 Mosil 1 CP Rotor Defect 15 Mosil 9 CP Rotor Defect 15 Mosil 11 CP High exhaust temperature 15 Dibis 6 CP Converting to Diesel 30 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo 15 Old Mulla 5 CP Inlet Valve 15 Old Mulla 6 CP High exhaust temperature 15 Old Mulla 8 CP Vibrations 15 Old Mulla 9,10 CP Transformer damage 30 Taji 3, CP Compressor 15 Taji 1 CP Vibrations 15 * Taji 4 CP Lubrication oil leak 15 M. Taji 2 CP Software 15 * Khor Zubayr 4 CP Cooling System problem 50 RED – Denotes out of service since last report Generators Scheduled Out of Service (23) 1483 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M TBD 21 Mar 04 21 May 100 Baiji 3 SP M Bechtel 29 Feb 04 1 May 100 Dibis 4 SP M ME 15 Mar 04 30 Apr 8 Doura 2 CP M ME 21 Feb 04 15 May 20 Doura 3 CP R GRD/RIE 1 Mar 03 TBD 20 Doura 3 SP M ME 28 Mar 04 TBD 65 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 30 May 100 Doura 6 SP R Bechtel Jul 03 30 Jun 100 Dibis 4 CP R GRD/RIE Sep 03 12 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 15 Jun 50 Mosil 2 CP M GRD/RIE 21 Mar 04 15 May 15 Mussaibe 2 SP M ME 28 Feb 04 28 Apr 200 Mussaibe 4 SP M ME 7 Feb 04 15 May 200 Nassirya 2 SP M ME 9 Mar 04 15 Apr 150 New Mulla 6 CP R GRD/RIE 28 Mar 04 15 May 30 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 Shuaiba 1 CP M ME 14 Feb 04 31 May 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 3 SP R ME 18 Mar 04 18 May 20 Taji 7 CP R GRD/RIE 1 Oct 03 15 May 15 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE 15 Apr 246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE Complete 297 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE 31 Mar 68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE TBD No contract awarded Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 30 May Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE 15 May Contractor mobilized Dibis to Old Kirkuk 132 Reconductor GRD-RIE 15 Jun Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Jazair to Yarmook 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Baghd West – Jamia 132 Sabotage ME TBD Al Amarah-Burzulgan 132 Looting GRD-RIE 15 Jun 26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Power transferred from North to Middle 850 MW. Power transferred from South to Middle 70 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1265 27772 1157 1356 Duhok 84 1928 80 107 Naynawa 385 8792 366 487 Tamim 149 3337 139 185 Salah Aldeen 248 5082 212 265 Anbar 200 4449 185 247 Dyala 94 2502 104 143 Babil 93 2660 111 145 Kirbala 75 1973 82 110 Najaf 90 2492 104 128 Kadsya 60 1441 60 85 Wasit 80 2089 87 122 Muthana 65 1404 59 76 Nasirya 130 2879 120 129 Misan 65 1492 62 77 Basra 265 5932 247 247 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3