DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 7, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Haditha-Baghdad West 400 Kv Transmission line energized, expect power flow within one week.
Loss of 105 Mw of power daily due to Natural Gas Pressure low at Taji (3 units), and Doura (3 units).
We will continue to see decreased power as we enter into the spring maintenance period.
Generation:
Peak Power 3830Mw, 73,559Mw hours, 7-day Avg. 3733Mw
Generators Returned to Service: Mussaibe #1 now producing 200 Mw 15 Mw Mosil 10 15 Mw
Generators Unscheduled Out of Service (20) 413 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Dibis 2
SP
Excitor Problem
8
South Baghdad 5
SP
Drum Level Low
30
South Baghdad 6
SP
Boiler Leak
30
* Baiji Mobile, 1,2,3,4
CP
No Fuel
100
Mosil 1
CP
Rotor Defect
15
Doura 1
CP
Natural Gas Pressure low
15
* Doura 2
CP
Natural Gas Pressure low
15
Doura 4
CP
Natural Gas Pressure low
15
* Hilla 5
CP
Testing
20
Mosil 2
CP
Hydraulic Pressure Low
15
Mosil 3
CP
Servo
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
* Old Mulla 3
CP
Primary Protector
15
Old Mulla 5
CP
Primary Protector
15
Old Mulla 6
CP
High exhaust temperature
15
Old Mulla 8
CP
Vibrations
15
Taji 2
CP
Turbine temperature
15
Taji 3,
CP
Compressor
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report Generators Scheduled Out of Service (27) 1918 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
21 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 3
CP
R
GRD/RIE
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 1
CP
M
ME
4 Apr 04
TBD
50
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
15 Jun
50
Mosil 11
CP
M
ME
2 Apr 04
TBD
15
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
30 Apr
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
Nassirya 3
SP
M
ME
31 Mar 04
15 Apr
130
Nassirya 4
SP
M
ME
31 Mar 04
15 Apr
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 6
CP
M
ME
2 Apr 04
TBD
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
MoE completing PLC work
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
In service 31 March
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 May
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
15 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
15 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution:
Power transferred from North to Middle 1170 MW.
Power transferred from South to Middle -180 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1250
26621
1109
1433
Duhok
82
1951
81
110
Naynawa
325
7708
321
504
Tamim
125
3093
129
176
Salah Aldeen
190
4705
196
245
Anbar
210
4540
189
238
Dyala
70
2039
85
134
Babil
130
2596
108
140
Kirbala
125
2214
92
99
Najaf
145
2633
110
123
Kadsya
65
1470
61
82
Wasit
88
2022
84
114
Muthana
60
1364
57
73
Nasirya
100
2218
92
119
Misan
65
1457
61
81
Basra
320
7516
313
313
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-d2af025d
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 7, 2004
- التاريخ
- 7 نيسان 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: