DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 17, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Baiji 2,3,4,6, SP, stopped on Sunday afternoon as the result of a fuel pump that tripped the auxiliary electrical system and caused a complete power failure. Units 2 and 6 returned to the grid Sunday night.
Generation:
Peak Power 3558Mw, 80,115Mw hours, 7-day Avg. 4006Mw Generators Returned to Service: (3) 150 Mw Mussaibe 3 100 Mw New Mulla 6 30 Mw Najaf 3 20 Mw
Generators Unscheduled Out of Service (20) 658 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Baiji 3
SP
Power Supply Failure
100
* Baiji 4
SP
Power Supply Failure
75
* Dibis 4
SP
Steam Valve Leakage
8
Najebia 5
SP
Thrust bearing problem
80
Nassirya 4
SP
Boiler Leak
130
Baiji Mobile, 4
CP
Fuel Filters
25
Doura 1,2
CP
No gas pressure
40
Mosil 2
CP
Reverse Power
15
Mosil 9
CP
Rotor Defect
15
* Old Mulla 3
CP
Primary protector
15
Old Mulla 7
CP
High exhaust temp
15
Najaf 1
CP
Testing
20
New Mulla 5
CP
Stopped to connect # 6
30
Shuaiba 2
CP
Oil cooling problem
15
Taji 1,2,5
CP
No gas pressure
45
M. Taji 1
CP
Planned Outage
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report
Generators Scheduled Out of Service (30) 1358 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
Bechtel
21 Mar 04
21 May
100
Dibis 3
SP
M
ME
26 Apr 04
TBD
8
Baiji 2
CP
M
ME
11 May 04
18 May
80
Doura 4
CP
M
ME
14 Apr 04
31 May
20
Doura 3
CP
R
ME
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
TBD
65
Doura 5
SP
R
Bechtel
Jul 03
Aug
100
Doura 6
SP
R
Bechtel
Jul 03
Sep
100
Dibis 4
CP
R
GRD/RIE
Sep 03
23 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
3 Jul
50
Mosil 1
CP
R
GRD/RIE
24 Apr 04
11 Jun
15
Mosil 7
CP
M
ME
24 Apr 04
18 May
15
Mosil 8
CP
R
GRD/RIE
6 Feb 04
11Jun
15
Mussaibe 2
SP
M (Additional work)
ME
28 Feb 04
20 May
200
Nassirya 1
SP
M
ME
30 Mar 04
21 May
130
Old Mulla 1
CP
M
GRD/RIE
17 Apr 04
15 Jun
15
Old Mulla 2
CP
M
GRD/RIE
17 Apr 04
6 Jun
15
Old Mulla 5
CP
M
GRD/RIE
17 Apr 04
6 Jun
15
Old Mulla 8
CP
M
ME
17 Apr 04
TBD
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
12 Jun
15
South Baghdad 1
SP
M
ME
12 Feb 04
21 May
30
South Baghdad 2
SP
M
ME
12 Feb 04
20 May
30
South Baghdad 3
SP
R
ME
18 Mar 04
6 Jun
20
South Baghdad 5
SP
M
ME
15May 04
7 Jun
30
Taji 3
CP
R
GRD/RIE
6 Feb 04
23 Jul
15
Taji 4
CP
M
GRD/RIE
21 Apr 04
8 Jun
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
24 Jun
15
Taji 6
CP
M
ME
2 Apr 04
26 May
15
New In-service date
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
159 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Complete
246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE
Complete
23 Apr Operational
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
28 Feb 05
Start date 21 May 04
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Foundations under construction Dibis/Erbil-Qara Quosh 132 New Line GRD/RIE
1 Jun
Construction ongoing
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
31 Jul
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
TBD
Assessment underway
Jazair to Yarmook
132
Reconductor
GRD-RIE
TBD
Assessment underway
Baghd West – Jamia
132
Sabotage
ME
TBD
Burzulgan-Old Amarah
132
Looting
GRD-RIE
25 Jun
Assessment underway
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution: No report today Power transferred from North to Middle 500 MW.
Power transferred from South to Middle 50 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1050
25555
1065
1529
Duhok
80
1800
75
115
Naynawa
285
6975
291
511
Tamim
120
3004
125
186
Salah Aldeen
185
4486
187
253
Anbar
190
4325
180
244
Dyala
65
1737
72
141
Babil
75
1936
81
143
Kirbala
75
1686
70
110
Najaf
75
1852
77
132
Kadsya
50
1191
50
95
Wasit
75
1759
73
120
Muthana
50
1071
45
73
Nasirya
120
2656
109
131
Misan
55
1430
60
83
Basra
290
6915
288
362
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-d11c9d79
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 17, 2004
- التاريخ
- 17 أيار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: