الرئيسية / الخدمات الأساسية / ESS-d11c9d79

الخدمات الأساسية

DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 17, 2004

التاريخ
17 أيار 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 17, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Baiji 2,3,4,6, SP, stopped on Sunday afternoon as the result of a fuel pump that tripped the auxiliary electrical system and caused a complete power failure. Units 2 and 6 returned to the grid Sunday night. Generation: Peak Power 3558Mw, 80,115Mw hours, 7-day Avg. 4006Mw Generators Returned to Service: (3) 150 Mw Mussaibe 3 100 Mw New Mulla 6 30 Mw Najaf 3 20 Mw Generators Unscheduled Out of Service (20) 658 Mw PLANT Type SP, CP, RP, HP Fault Mw * Baiji 3 SP Power Supply Failure 100 * Baiji 4 SP Power Supply Failure 75 * Dibis 4 SP Steam Valve Leakage 8 Najebia 5 SP Thrust bearing problem 80 Nassirya 4 SP Boiler Leak 130 Baiji Mobile, 4 CP Fuel Filters 25 Doura 1,2 CP No gas pressure 40 Mosil 2 CP Reverse Power 15 Mosil 9 CP Rotor Defect 15 * Old Mulla 3 CP Primary protector 15 Old Mulla 7 CP High exhaust temp 15 Najaf 1 CP Testing 20 New Mulla 5 CP Stopped to connect # 6 30 Shuaiba 2 CP Oil cooling problem 15 Taji 1,2,5 CP No gas pressure 45 M. Taji 1 CP Planned Outage 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (30) 1358 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M Bechtel 21 Mar 04 21 May 100 Dibis 3 SP M ME 26 Apr 04 TBD 8 Baiji 2 CP M ME 11 May 04 18 May 80 Doura 4 CP M ME 14 Apr 04 31 May 20 Doura 3 CP R ME 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 TBD 65 Doura 5 SP R Bechtel Jul 03 Aug 100 Doura 6 SP R Bechtel Jul 03 Sep 100 Dibis 4 CP R GRD/RIE Sep 03 23 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 3 Jul 50 Mosil 1 CP R GRD/RIE 24 Apr 04 11 Jun 15 Mosil 7 CP M ME 24 Apr 04 18 May 15 Mosil 8 CP R GRD/RIE 6 Feb 04 11Jun 15 Mussaibe 2 SP M (Additional work) ME 28 Feb 04 20 May 200 Nassirya 1 SP M ME 30 Mar 04 21 May 130 Old Mulla 1 CP M GRD/RIE 17 Apr 04 15 Jun 15 Old Mulla 2 CP M GRD/RIE 17 Apr 04 6 Jun 15 Old Mulla 5 CP M GRD/RIE 17 Apr 04 6 Jun 15 Old Mulla 8 CP M ME 17 Apr 04 TBD 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 12 Jun 15 South Baghdad 1 SP M ME 12 Feb 04 21 May 30 South Baghdad 2 SP M ME 12 Feb 04 20 May 30 South Baghdad 3 SP R ME 18 Mar 04 6 Jun 20 South Baghdad 5 SP M ME 15May 04 7 Jun 30 Taji 3 CP R GRD/RIE 6 Feb 04 23 Jul 15 Taji 4 CP M GRD/RIE 21 Apr 04 8 Jun 15 Taji 7 CP R GRD/RIE 1 Oct 03 24 Jun 15 Taji 6 CP M ME 2 Apr 04 26 May 15 New In-service date LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 159 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE Complete 246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE Complete 23 Apr Operational Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete Operational Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE 28 Feb 05 Start date 21 May 04 Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 15 Jun Foundations under construction Dibis/Erbil-Qara Quosh 132 New Line GRD/RIE 1 Jun Construction ongoing Dibis to Old Kirkuk 132 Reconductor GRD-RIE 31 Jul Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE TBD Assessment underway Jazair to Yarmook 132 Reconductor GRD-RIE TBD Assessment underway Baghd West – Jamia 132 Sabotage ME TBD Burzulgan-Old Amarah 132 Looting GRD-RIE 25 Jun Assessment underway Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: No report today Power transferred from North to Middle 500 MW. Power transferred from South to Middle 50 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1050 25555 1065 1529 Duhok 80 1800 75 115 Naynawa 285 6975 291 511 Tamim 120 3004 125 186 Salah Aldeen 185 4486 187 253 Anbar 190 4325 180 244 Dyala 65 1737 72 141 Babil 75 1936 81 143 Kirbala 75 1686 70 110 Najaf 75 1852 77 132 Kadsya 50 1191 50 95 Wasit 75 1759 73 120 Muthana 50 1071 45 73 Nasirya 120 2656 109 131 Misan 55 1430 60 83 Basra 290 6915 288 362 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3