DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 28, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: 8, 14, and 16-inch pipelines feeding Taji and Doura Power plants sabotaged 26 February. Eight and 16-inch pipeline fires are out, 14-inch pipeline fire still burning. Major damage to valve boxes will require valve replacement. Estimate 7 days repair time.
Generation:
Peak Power 4024Mw, 87,178Mw hours, 7-day Avg. 4154Mw
Generators Returned to Service 105 Mw South Baghdad 3 30 Mw South Baghdad 6 30 Mw Mosil 12 15 Mw New Mulla 5 30 Mw Generators Unscheduled Out of Service 883 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 4
SP
Boiler Leak
8
* South Baghdad 5
SP
Boiler Leak
30
Doura 3
SP
Drum Level low
70
Mussaibe 1
SP
Boiler Leak
200
Mussaibe 2
SP
Thrust Bearing problem
200
Najebia 5
SP
Auxillary power Loss
90
Baiji 2,
CP
Lubricating oil leak
110
Hilla 1
CP
Cooling System problems
20
Hilla 2
CP
Servo
20
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 831 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Doura 2
CP
M
ME
21 Feb 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Khor Zubayr 2
CP
M
ME
19 Feb 04
TBD
50
Mosul 8
CP
M
ME
28 Feb 04
TBD
15
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
180
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
20 Apr
45 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
7 Mar
287 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
14 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
28 Feb
81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE
Compl. 24 Jan
27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
28 Feb
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Power transferred from North to Middle 815 MW.
Power transferred from South to Middle 270 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1125
28706
Duhok
80
1818
1196
Naynawa
365
7467
76
Tamim
140
3264
311
Salah Aldeen
190
4644
136
Anbar
195
4454
194
Dyala
95
2126
186
Babil
100
2622
89
Kirbala
125
2620
109
Najaf
156
2995
125
Kadsya
70
1466
61
Wasit
95
2098
87
Muthana
59
1382
58
Nasirya
125
2823
118
Misan
61
1525
64
Basra
320
7759
323
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 2 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-a76f9f14
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 28, 2004
- التاريخ
- 28 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: