DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 28, 2004

التاريخ
28 شباط 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 28, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: 8, 14, and 16-inch pipelines feeding Taji and Doura Power plants sabotaged 26 February. Eight and 16-inch pipeline fires are out, 14-inch pipeline fire still burning. Major damage to valve boxes will require valve replacement. Estimate 7 days repair time. Generation: Peak Power 4024Mw, 87,178Mw hours, 7-day Avg. 4154Mw Generators Returned to Service 105 Mw South Baghdad 3 30 Mw South Baghdad 6 30 Mw Mosil 12 15 Mw New Mulla 5 30 Mw Generators Unscheduled Out of Service 883 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 4 SP Boiler Leak 8 * South Baghdad 5 SP Boiler Leak 30 Doura 3 SP Drum Level low 70 Mussaibe 1 SP Boiler Leak 200 Mussaibe 2 SP Thrust Bearing problem 200 Najebia 5 SP Auxillary power Loss 90 Baiji 2, CP Lubricating oil leak 110 Hilla 1 CP Cooling System problems 20 Hilla 2 CP Servo 20 Mosil 1 CP Rotor Defect 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo 15 New Mulla 6 CP Generator Defect 30 Taji 3, CP Compressor 15 Taji 4 CP Control card 15 Taji Mobile, 2 CP Software problem 15 * RED – Denotes out of service since last report Generators Scheduled Out of Service 831 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 4 Mar 100 Doura 2 CP M ME 21 Feb 04 TBD 20 Doura 3 CP R GRD/RIE 1 Mar 03 15 May 20 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 30 Apr 100 Doura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME 30Dec 03 31 May 8 Dibis 4 CP R GRD/RIE Sep 03 30 Mar 18 Khor Zubayr 2 CP M ME 19 Feb 04 TBD 50 Mosul 8 CP M ME 28 Feb 04 TBD 15 Mussaibe 4 SP M ME 7 Feb 04 7 Mar 180 New Mulla 2 CP M ME 17 Feb04 TBD 30 Old Mulla 5 CP M GRD/RIE 1 Nov 03 15 May 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 Taji 7 CP R GRD/RIE 1 Oct 03 TBD 15 Shuaiba 1 CP M ME 14 Feb 04 31 May 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE 20 Apr 45 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE 7 Mar 287 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE 14 Mar 68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE 28 Feb 81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE Compl. 24 Jan 27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME TBD No contract awarded Baiji – Haditha 400 Sabotage ME TBD No contract awarded Diyala Connection 400 New Line ME 30 Apr Dibis/Irbil-Quarqush 132 New Line GRD/RIE 15 May Contractor on-site 20 Feb Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME 28 Feb 44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME TBD Omara-Burzegan 132 Looting ME 1 May 26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Power transferred from North to Middle 815 MW. Power transferred from South to Middle 270 MW. GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1125 28706 Duhok 80 1818 1196 Naynawa 365 7467 76 Tamim 140 3264 311 Salah Aldeen 190 4644 136 Anbar 195 4454 194 Dyala 95 2126 186 Babil 100 2622 89 Kirbala 125 2620 109 Najaf 156 2995 125 Kadsya 70 1466 61 Wasit 95 2098 87 Muthana 59 1382 58 Nasirya 125 2823 118 Misan 61 1525 64 Basra 320 7759 323 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 2 of NUMPAGES 3