الرئيسية / الخدمات الأساسية / ESS-a0afc601

الخدمات الأساسية

power system04nov03

التاريخ
3 تشرين الثاني 2003
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي XLSتنزيل النص الإنكليزي

معاينة الجدول

الورقة «A-Steam Power Stations»: 13 صفاً × 13 عموداً

REPORT DATE -03 NOVEMBER 2003
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas4380882424No. 2 Boiler Leakage.
BaijiFuel Oil63-100850085270500No. 1 Stopped leakage HP by pass. No. 4 trip at 0239 close contr valve. No. 5 Rehab.
DuraFuel Oil418000080180No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation.
South BaghdadFuel Oil643500353530135200No.1 synch 2022. No.2 Boiler Leakage. Nos. 3 A/H.
MussaibeCrude and Fuel Oil4220000215415860No. 2: Control System. No. 3: Boiler Leakage.
NassiryaCrude44150155150100555600No. 4 synch at 1615.
NajebiaNatural Gas and Crude228565150160
HarthaNatural Gas and Crude411000100300No. 1: Limited due to load flow. No. 4: Programmed Maintenance from 24 October.
Total:1,7292,824
# A-Steam Power Stations REPORT DATE -03 NOVEMBER 2003 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 3 8 0 8 8 24 24 No. 2 Boiler Leakage. Baiji Fuel Oil 6 3 - 100 85 0 0 85 270 500 No. 1 Stopped leakage HP by pass. No. 4 trip at 0239 close contr valve. No. 5 Rehab. Dura Fuel Oil 4 1 80 0 0 0 80 180 No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation. South Baghdad Fuel Oil 6 4 35 0 0 35 35 30 135 200 No.1 synch 2022. No.2 Boiler Leakage. Nos. 3 A/H. Mussaibe Crude and Fuel Oil 4 2 200 0 0 215 415 860 No. 2: Control System. No. 3: Boiler Leakage. Nassirya Crude 4 4 150 155 150 100 555 600 No. 4 synch at 1615. Najebia Natural Gas and Crude 2 2 85 65 150 160 Hartha Natural Gas and Crude 4 1 100 0 100 300 No. 1: Limited due to load flow. No. 4: Programmed Maintenance from 24 October. Total: 1729 2824 # B- Gas_C-Power Stations Report Date- 03 NOVEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 115 125 Gas Oil No. 2 waiting expret. Musil Dam Main 4 2 170 600 Quds 2 2 80 160 Gas Oil 39 trucks. Musil Dam reg 4 3 33 60 450 Mosil 12 8 80 150 14 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 S/B. Musil Pumping 2 0 0 0 Dibis 3 1 10 60 24 No. 5 problem turbine rotor. No. 6: Programmed Maintenance. Haditha Dam 6 2 130 160 300 Old Mulla 12 6 85 128 25 No. 1 excitation. No. 2 Clutch. No. 5 programmed maintenance. No. 7 Oil Cooler. No. 11 Programmed Maintenance. Samarra 3 2 41 55 420 New Mulla 6 5 170 173 36 No. 6 Generator Defective. Himrin 2 1 23 21 130 Taji 7 4 60 55 13 No. 1 Programmed Maintenance. No. 5 Diesel. No.7 Rehabilitation. Hindia 4 4 6 5 M. Taji 2 0 0 20 0 NGPL Kufa 4 1 1 1 Dura 4 1 10 30 13 No.1 Control. No.3 Rehabilitation. No. 4 tripped at 1905 NGPL. Total 404 896 Hilla 4 3 50 64 28 No. 1 Programmed Maintenance. System Generation 72924 MWh Najaf 3 3 110 129 26 Syrian Line Generation 1432 MWh Khor 4 3 60 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 2169 MWh Shuaiba 2 1 5 20 Natural Gas No. 1 Programmed Maintenance. Total Generation 76525 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3820 MW M. Dibis 4 0 0 24 Natural Gas Turkey Peak Load 85 MW Mossil East 5 0 0 15 Gas Oil Syria Peak Load 60 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 4042 MW Total 845 1233 Baghdad Load 1230 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads GOVERNORATE Peak Load MW MWH Average Load MW 03 NOVEMBER, 2003 Baghdad 1230 25385 1057.7083 Power transferred from North to Middle 730 MW Duhok 85 2057 85.7083 Naynawa 360 9088 378.6667 Power transferred from South to Middle 320 MW Tamim 145 3534 147.25 Salah Aldeen 206 4593 191.375 Anbar 190 4065 169.375 Dyala 95 2043 85.125 Babil 112 2555 106.4583 Kirbala 86 1835 76.4583 Najaf 120 2459 102.4583 Kadsya 75 1670 69.5833 Wasit 95 2210 92.0833 Muthana 71 1536 64 Nasirya 135 2600 108.3333 Misan 68 1614 67.25 Basra 320 7090 295.4167 3393