REPORT DATE -4 NOVEMBER 2003
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas4200881624No. 2 Boiler Leakage. No. 1 tripped at 2127 due to FWP.
BaijiFuel Oil62959500085275500No. 1 synch at 0845. No. 4 trip at 0725 due to SCVC. No. 3 starting.
DuraFuel Oil417500075180No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation.
South BaghdadFuel Oil644000354030145200No.2 Boiler Leakage. Nos. 3 A/H.
MussaibeCrude and Fuel Oil4220000210410860No. 2 program mnt 20 OCT to 12 NOV. No. 3 program mnt 5 NOV to 20 DEC.
NassiryaCrude4315012000270600No. 4 tripped 0010 due to turbine expansion. No. 3 limite due to leak in FWL.
NajebiaNatural Gas and Crude223075105160No. 4 one boiler in operation.
HarthaNatural Gas and Crude411500150300No. 1: Limited due to load flow. No. 4: Programmed Maintenance from 23 OCT to 23 DEC.
Total:1,4462,824
# A-Steam Power Stations REPORT DATE -4 NOVEMBER 2003 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 0 0 8 8 16 24 No. 2 Boiler Leakage. No. 1 tripped at 2127 due to FWP. Baiji Fuel Oil 6 2 95 95 0 0 0 85 275 500 No. 1 synch at 0845. No. 4 trip at 0725 due to SCVC. No. 3 starting. Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation. South Baghdad Fuel Oil 6 4 40 0 0 35 40 30 145 200 No.2 Boiler Leakage. Nos. 3 A/H. Mussaibe Crude and Fuel Oil 4 2 200 0 0 210 410 860 No. 2 program mnt 20 OCT to 12 NOV. No. 3 program mnt 5 NOV to 20 DEC. Nassirya Crude 4 3 150 120 0 0 270 600 No. 4 tripped 0010 due to turbine expansion. No. 3 limite due to leak in FWL. Najebia Natural Gas and Crude 2 2 30 75 105 160 No. 4 one boiler in operation. Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 1: Limited due to load flow. No. 4: Programmed Maintenance from 23 OCT to 23 DEC. Total: 1446 2824 # B- Gas_C-Power Stations Report Date- 4 NOVEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 110 125 Gas Oil No. 2 waiting expret. Musil Dam Main 4 2 170 600 Quds 2 2 200 160 Gas Oil 37 trucks. Musil Dam reg 4 3 33 60 450 Mosil 12 7 85 150 14 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 S/B. No. 7 tripped at 2127 NGPL. Musil Pumping 2 0 0 0 Dibis 3 1 10 60 24 No. 5 problem turbine rotor. No. 6: Programmed Maintenance. Haditha Dam 6 2 130 160 300 Old Mulla 12 6 90 128 25 No. 1 excitation. No. 2 Clutch. No. 5 programmed maintenance. No. 7 Oil Cooler. No. 11 Programmed Maintenance. Samarra 3 2 41 55 420 New Mulla 6 5 155 173 36 No. 6 Generator Defective. Himrin 2 1 23 21 130 Taji 7 4 55 55 13 No. 1 Programmed Maintenance. No. 5 Diesel. No.7 Rehabilitation. Hindia 4 4 6 5 M. Taji 2 0 0 20 0 NGPL Kufa 4 1 1 1 Dura 4 0 0 30 13 No.1 Control. No.3 Rehabilitation. No. 4 and 2 NGPL. Total 404 896 Hilla 4 3 150 64 28 No. 1 Programmed Maintenance. System Generation 71502 MWh Najaf 3 3 90 129 26 Syrian Line Generation 1434 MWh Khor 4 3 105 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 1948 MWh Shuaiba 2 1 4 20 Natural Gas No. 1 Programmed Maintenance. Total Generation 74884 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3542 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 60 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 80 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3759 MW Total 1064 1233 Baghdad Load 1220 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads GOVERNORATE Peak Load MW MWH Average Load MW 4 NOVEMBER, 2003 Baghdad 1220 25667 1069.4583 Power transferred from North to Middle 540 MW Duhok 80 1925 80.2083 Naynawa 345 9278 386.5833 Power transferred from South to Middle 360 MW Tamim 145 3345 139.375 Salah Aldeen 190 4452 185.5 Anbar 185 3877 161.5417 Dyala 90 2215 92.2917 Babil 110 2632 109.6667 Kirbala 70 1700 70.8333 Najaf 110 2381 99.2083 Kadsya 65 1565 65.2083 Wasit 69 1979 82.4583 Muthana 70 1493 62.2083 Nasirya 125 2728 113.6667 Misan 65 1518 63.25 Basra 300 6122 255.0833 3239