Report Date - 17 FEBRUARY 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas418824#2 boiler leakage; #3 prog maint; #4 boiler leakage
BaijiFuel Oil639080120290500#2 prog maint; #3 stopped at 1035 control valve closed; #4 synch at 1107; #5 forced outage
DauraFuel Oil417070180#4 prog maint; #5 & #6 rehab
South BaghdadFuel Oil62203050200#1 & #2 prog maint; #5 synch at 1825 - stopped at 140 steam leakage; #6 stopped 445 no signal
MussaibeCrude and Fuel Oil43190200190580860#2 synch at 943; #4 prog maint
NassiryaCrude43160170150480600
NajebiaNatural Gas and Crude2280100180160
HarthaNatural Gas and Crude41135135300#4 prog maint
Out of Service for Unscheduled MaintanenceTotal:1,7932,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Report Date - 17 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #2 boiler leakage; #3 prog maint; #4 boiler leakage Baiji Fuel Oil 6 3 90 80 120 290 500 #2 prog maint; #3 stopped at 1035 control valve closed; #4 synch at 1107; #5 forced outage Daura Fuel Oil 4 1 70 70 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 2 20 30 50 200 #1 & #2 prog maint; #5 synch at 1825 - stopped at 140 steam leakage; #6 stopped 445 no signal Mussaibe Crude and Fuel Oil 4 3 190 200 190 580 860 #2 synch at 943; #4 prog maint Nassirya Crude 4 3 160 170 150 480 600 Najebia Natural Gas and Crude 2 2 80 100 180 160 Hartha Natural Gas and Crude 4 1 135 135 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1793 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Report Date - 17 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 555 600 Quds 2 1 100 160 Gas Oil 30 trucks - #2 shortage of fuel Musil Dam reg 4 4 45 60 1000 Mosil 12 7 70 150 15 #1 rotor defec; #3 & #4 stopped at 515 g.p.l.; #8 stopped at 935 g.p.l.; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 2 58 30 20 #4 rehab Haditha Dam 6 2 125 160 350 Old Mulla 12 7 100 128 360 #1 acc.gear; #2 servo; #3 synch at 1030; #5 prog main; #10 prog maint; #12 needs rehab Samarra 3 2 40 55 440 New Mulla 6 3 100 173 24 #1 prog maint; #2 prog maint - stopped at 0010; #6 generator defect Himrin 2 2 42 21 160 Taji 7 4 61 55 13 #3 compressor; #7 needs rehab Hindia 4 4 5 5 180 M. Taji 2 18 #2 software Kufa 4 0 Daura 4 1 10 30 14 #3 needs rehab; #4 stopped at 703 g.p.l. Total 922 896 Hilla 4 2 35 64 34 #1 cooling sys prob; #2 servo System Generation 80481 MWh Najaf 3 2 95 129 32 #2 prog maint Syrian Line Generation 1449 MWh Khor 4 3 115 80 Natural Gas #4 rehab Turkey Line Generation 1963 MWh Shuaiba 2 1 5 20 Natural Gas #1 prog maint Total Generation 89315 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3863 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 55 MW M. Dibis 4 24 Natural Gas Turkey Peak Load 82 MW Mossil East 5 2 10 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 4266 MW Diesel 46 Gas Oil Baghdad Load 1500 MW Total 943 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Report Date - 17 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 810 MW. Power transferred from South to Middle 240MW. Baghdad 1500 31691 1320 Duhok 82 1922 80 Naynawa 360 9070 378 Tamim 150 3287 137 Salah Aldeen 220 5127 214 Anbar 240 4304 179 Dyala 125 2204 92 Babil 95 2350 98 Kirbala 85 1710 71 Najaf 92 2190 91 Kadsya 55 1383 58 Wasit 90 1924 80 Muthana 65 1326 55 Nasirya 120 2834 118 Misan 70 1396 58 Basra 355 7542 314