DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 6, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 3847Mw, 82,841Mw hours, 7-day Avg. 3953Mw
Generators Returned to Service: 230 Mw Baiji 6, SP 100 Mw Qudas 1 100 Mw Mosil 3 15 Mw Old Mulla 7 15 Mw
Generators Unscheduled Out of Service 636 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler Leak
8
* Dibis 4
SP
Boiler Leak
8
* Baiji 4
SP
Low Air Flow
100
South Baghdad 4
SP
Boiler Leak
30
Najebia 4
SP
Valve Leak
90
Baiji 2,
CP
Lubricating oil leak
110
* Hilla 1
CP
Cooling System prob.
20
Hilla 2
CP
Servo
20
Khor Zubayr 3
CP
Generator Transf. Prob.
50
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
* Mosil 12
CP
Generator fault
15
* Najaf 2
CP
Vibrations
50
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 1101 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Baiji 3
SP
M
GRD/RIE
29 Feb 04
30 Jun
100
Doura 2
CP
M
ME
21 Feb 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
200
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
15 May
15
Old Mulla 8
CP
M
GRD/RIE
28 Feb 04
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
101 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
7 Mar
293 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
22 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
3 Mar
81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE
Compl. 24 Jan
27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
28 Feb
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date -6 MARCH 2004
Power transferred from North to Middle 850 MW.
Power transferred from South to Middle 250 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1400
27414
1142
Duhok
80
1866
78
Naynawa
280
8252
344
Tamim
124
3260
136
Salah Aldeen
200
4912
205
Anbar
190
4429
185
Dyala
75
2043
85
Babil
100
2205
92
Kirbala
115
2238
93
Najaf
132
2548
106
Kadsya
65
1387
58
Wasit
90
2081
87
Muthana
50
1350
56
Nasirya
120
2720
116
Misan
65
1436
60
Basra
275
6350
265
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-40c1ee7f
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 6, 2004
- التاريخ
- 6 آذار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: