# A-Steam Power Stations
Report Date - 05 MARCH 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 X X 16 24 Baiji Fuel Oil 6 3 X X X 275 500 Daura Fuel Oil 4 1 X 55 180 South Baghdad Fuel Oil 6 3 X X X 85 200 #4 leak in boiler Mussaibe Crude and Fuel Oil 4 2 X X 406 860 #2 problem in thrust bearing Nassirya Crude 4 4 X X X X 520 600 Najebia Natural Gas and Crude 2 1 X 90 160 #4 leak in boiler Hartha Natural Gas and Crude 4 2 X X 180 300 Out of Service for Unscheduled Maintanence Total: 1627 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 05 MARCH 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 100 125 Gas Oil Musil Dam Main 4 4 570 600 Quds 2 1 100 160 Gas Oil Musil Dam reg 4 3 27 60 Mosil 12 9 137 150 Musil Pumping 2 109 0 Dibis 3 2 56 30 Haditha Dam 6 160 Old Mulla 12 6 85 128 Samarra 3 3 55 55 New Mulla 6 4 110 173 Himrin 2 2 50 21 Taji 7 55 Hindia 4 4 6 5 M. Taji 2 18 Kufa 4 1 1 0 Daura 4 30 Total 818 896 Hilla 4 2 31 64 System Generation MWh Najaf 3 1 50 129 Syrian Line Generation MWh Khor 4 3 110 80 Natural Gas #3 gen trans protection Turkey Line Generation MWh Shuaiba 2 1 8 20 Natural Gas Total Generation 84170 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3367 MW Petro 4 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 81 MW Mossil East 5 2 10 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 45 Gas Oil Total Peak Load 3774 MW Diesel Gas Oil Baghdad Load 1350 MW Total 851 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 05 MARCH 2004 GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1350 Duhok 82 Naynawa 300 Tamim 125 Salah Aldeen 190 Anbar 150 Dyala 91 Babil 90 Kirbala 100 Najaf 101 Kadsya 65 Wasit 80 Muthana 55 Nasirya 120 Misan 60 Basra 300
الرئيسية / الخدمات الأساسية / ESS-3340e968
الخدمات الأساسية
System Status Mar 05
- التاريخ
- 5 آذار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| Report Date - 05 MARCH 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 2 | X | X | 16 | 24 | |||||
| Baiji | Fuel Oil | 6 | 3 | X | X | X | 275 | 500 | ||||
| Daura | Fuel Oil | 4 | 1 | X | 55 | 180 | ||||||
| South Baghdad | Fuel Oil | 6 | 3 | X | X | X | 85 | 200 | #4 leak in boiler | |||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | X | X | 406 | 860 | #2 problem in thrust bearing | ||||
| Nassirya | Crude | 4 | 4 | X | X | X | X | 520 | 600 | |||
| Najebia | Natural Gas and Crude | 2 | 1 | X | 90 | 160 | #4 leak in boiler | |||||
| Hartha | Natural Gas and Crude | 4 | 2 | X | X | 180 | 300 | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,627 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date - 05 MARCH 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 100 | 125 | Gas Oil | Musil Dam Main | 4 | 4 | 570 | 600 | ||
| Quds | 2 | 1 | 100 | 160 | Gas Oil | Musil Dam reg | 4 | 3 | 27 | 60 | ||
| Mosil | 12 | 9 | 137 | 150 | Musil Pumping | 2 | 109 | 0 | ||||
| Dibis | 3 | 2 | 56 | 30 | Haditha Dam | 6 | 160 | |||||
| Old Mulla | 12 | 6 | 85 | 128 | Samarra | 3 | 3 | 55 | 55 | |||
| New Mulla | 6 | 4 | 110 | 173 | Himrin | 2 | 2 | 50 | 21 | |||
| Taji | 7 | 55 | Hindia | 4 | 4 | 6 | 5 | |||||
| M. Taji | 2 | 18 | Kufa | 4 | 1 | 1 | 0 | |||||
| Daura | 4 | 30 | Total | 818 | 896 | |||||||
| Hilla | 4 | 2 | 31 | 64 | System Generation | MWh | ||||||
| Najaf | 3 | 1 | 50 | 129 | Syrian Line Generation | MWh | ||||||
| Khor | 4 | 3 | 110 | 80 | Natural Gas | #3 gen trans protection | Turkey Line Generation | MWh | ||||
| Shuaiba | 2 | 1 | 8 | 20 | Natural Gas | Total Generation | 84,170 | MWh | ||||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,367 | MW | ||||||
| Petro | 4 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 81 | MW | ||||
| Mossil East | 5 | 2 | 10 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 45 | Gas Oil | Total Peak Load | 3,774 | MW | |||||
| Diesel | Gas Oil | Baghdad Load | 1,350 | MW | ||||||||
| Total | 851 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 05 MARCH 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,350 | ||
| Duhok | 82 | ||
| Naynawa | 300 | ||
| Tamim | 125 | ||
| Salah Aldeen | 190 | ||
| Anbar | 150 | ||
| Dyala | 91 | ||
| Babil | 90 | ||
| Kirbala | 100 | ||
| Najaf | 101 | ||
| Kadsya | 65 | ||
| Wasit | 80 | ||
| Muthana | 55 | ||
| Nasirya | 120 | ||
| Misan | 60 | ||
| Basra | 300 |