الرئيسية / الخدمات الأساسية / ESS-3c0a066a

الخدمات الأساسية

power system11nov03

التاريخ
10 تشرين الثاني 2003
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي XLSتنزيل النص الإنكليزي

معاينة الجدول

الورقة «A-Steam Power Stations»: 13 صفاً × 13 عموداً

REPORT DATE -10 NOVEMBER 2003
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas400000024No. 2 Boiler Leakage. No. 1 and 3 stopped minimum load. No. 4 oil pump.
BaijiFuel Oil6209000080170500No. 5 rehab. No. 4 stopped excitation. No. 1 and 3 stopped minimum load.
DuraFuel Oil417500075180No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation.
South BaghdadFuel Oil644003035350140200No.2 Boiler Leakage. No. 5 synch at 0030. No. 6 programmed mnt 11 NOV to 26 DEC.
MussaibeCrude and Fuel Oil4220000130330860No. 2 program mnt 20 OCT to 12 NOV. No. 3 program mnt 5 NOV to 20 DEC. No. 4 synch at 1003 voltage drop.
NassiryaCrude43150150090390600No. 4 limited due to vacuum. No. 3 programmed mnt 11 NOV to 11 DEC.
NajebiaNatural Gas and Crude2108080160No. 4 programmed mnt 6 NOV to 21 DEC.
HarthaNatural Gas and Crude411000100300No. 4 Programmed Maintenance from 23 OCT to 23 DEC.
Total:1,2852,824
# A-Steam Power Stations REPORT DATE -10 NOVEMBER 2003 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 0 0 0 0 0 0 24 No. 2 Boiler Leakage. No. 1 and 3 stopped minimum load. No. 4 oil pump. Baiji Fuel Oil 6 2 0 90 0 0 0 80 170 500 No. 5 rehab. No. 4 stopped excitation. No. 1 and 3 stopped minimum load. Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation. South Baghdad Fuel Oil 6 4 40 0 30 35 35 0 140 200 No.2 Boiler Leakage. No. 5 synch at 0030. No. 6 programmed mnt 11 NOV to 26 DEC. Mussaibe Crude and Fuel Oil 4 2 200 0 0 130 330 860 No. 2 program mnt 20 OCT to 12 NOV. No. 3 program mnt 5 NOV to 20 DEC. No. 4 synch at 1003 voltage drop. Nassirya Crude 4 3 150 150 0 90 390 600 No. 4 limited due to vacuum. No. 3 programmed mnt 11 NOV to 11 DEC. Najebia Natural Gas and Crude 2 1 0 80 80 160 No. 4 programmed mnt 6 NOV to 21 DEC. Hartha Natural Gas and Crude 4 1 100 0 100 300 No. 4 Programmed Maintenance from 23 OCT to 23 DEC. Total: 1285 2824 # B- Gas_C-Power Stations Report Date- 10 NOVEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 0 0 125 Gas Oil No. 2 s/b. No. 1 clean filters. Musil Dam Main 4 2 250 600 Quds 2 2 200 160 Gas Oil 37 trucks. Musil Dam reg 4 3 30 60 450 Mosil 12 4 25 150 21 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 servo. No. 5, 7, 11 and 12 s/b. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 32 No. 5 problem turbine rotor. No. 6: Programmed Maintenance. No. 4 rotor defect. Haditha Dam 6 2 80 160 300 Old Mulla 12 0 0 128 25 Tripped due to network. Samarra 3 3 58 55 480 New Mulla 6 0 0 173 2.7 No. 6 Generator Defective. No. 1, 2, 3, 4 and 5 s/b. Himrin 2 1 23 21 130 Taji 7 5 75 55 14 No. 5 Diesel. No.7 Rehabilitation. No. 4 trip servo. Hindia 4 4 5 5 M. Taji 2 0 0 20 0 NGPL Kufa 4 0 0 1 Dura 4 0 0 30 15 No.1 Control. No.3 Rehabilitation. No. 2 NGPL. No. 4 NGPL. Total 446 896 Hilla 4 4 35 64 30 No. 4 synch at 1351. System Generation 62180 MWh Najaf 3 3 55 129 30 Syrian Line Generation 1876 MWh Khor 4 3 90 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 3190 MWh Shuaiba 2 1 3 20 Natural Gas No. 1 Programmed Maintenance. Total Generation 67246 MWh Petro 4 0 0 0 Natural Gas System Peak Load 2945 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 55 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 80 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3157 MW Total 483 1233 Baghdad Load 900 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads GOVERNORATE Peak Load MW MWH Average Load MW 10 NOVEMBER, 2003 Baghdad 900 20754 864.75 Power transferred from North to Middle 280 MW Duhok 80 1932 80.5 Naynawa 530 10836 451.5 Power transferred from South to Middle 200 MW Tamim 155 3350 139.5833 Salah Aldeen 125 3636 151.5 Anbar 120 2593 108.0417 Dyala 55 923 38.4583 Babil 85 1981 82.5417 Kirbala 65 1551 64.625 Najaf 60 1614 67.25 Kadsya 45 1165 48.5417 Wasit 75 1742 72.5833 Muthana 60 1338 55.75 Nasirya 100 2537 105.7083 Misan 65 1455 60.625 Basra 285 6045 251.875 2805