DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 24, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Najaf 2 and New Mulla 1 out of programmed maintenance and operational ahead of schedule.
Generation:
Peak Power 4011Mw, 88,490Mw hours, 7-day Avg. 4157Mw
Generators Returned to Service 223 Mw Dibis 2, SP 8 Mw Baiji 1, CP 85 Mw New Mulla 1 30 Mw Khor Zubayr 4 50 Mw Najaf 2 50 Mw Generators Unscheduled Out of Service 1043 Mw 876 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 4
SP
Boiler Leak
8
* South Baghdad 4
SP
Boiler Leak
30
South Baghdad 5
SP
Boiler Leak
30
* South Baghdad 6
SP
Boiler Leak
30
Hartha 4
SP
Excit. problem
150
* Mussaibe 1
SP
Boiler Leak
200
* Nassirya 3
SP
Vacuum problems
165
Baiji 2,
CP
Lubricating oil leak
110
* Qudis 2
CP
Fuel level low
80
Hilla 1
CP
Cooling System problems
20
Hilla 2
CP
Servo
20
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
* Mosil 7,8
CP
Transistor problems
30
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
New Mulla 2
CP
Maintenance
30
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji Mobile, 2
CP
Software problem
15
* Doura 4
CP
Circuit breaker
20
* RED – Denotes out of service since last report Generators Scheduled Out of Service 831 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Doura 2
CP
M
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Khor Zubayr 2
CP
M
ME
19 Feb 04
TBD
50
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
180
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
15 May
15
Old Mulla 10
CP
M
GRD/RIE
6 Jan 04
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
1 May
102 towers complete/211req’d Haditha-Baghd West 400 Sabotage GRD/RIE
20 Apr
45 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
7 Mar
281 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
14 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
28 Feb
81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE
Compl. 24 Jan
27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
15 Feb/TBD
43 towers complete/43 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Power transferred from North to Middle 845 MW.
Power transferred from South to Middle 125 MW.
Baghdad
1300
29740
1239
Duhok
84
1303
54
Naynawa
310
9447
394
Tamim
120
3827
159
Salah Aldeen
200
4837
202
Anbar
185
4012
167
Dyala
75
1847
77
Babil
75
2202
92
Kirbala
146
2657
111
Najaf
156
2861
119
Kadsya
55
1310
55
Wasit
65
1871
78
Muthana
59
1353
56
Nasirya
140
2807
117
Misan
61
1439
60
Basra
310
7455
311
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-24e887cf
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 24, 2004 — Najaf — 24 شباط 2004 (ESS-24e887cf)
- التاريخ
- 24 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: