# A-Steam Power Stations
Report Date - 23 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 Baiji Fuel Oil 6 4 100 95 90 70 355 500 Daura Fuel Oil 4 1 25 25 30 80 180 South Baghdad Fuel Oil 6 3 75 75 200 Mussaibe Crude and Fuel Oil 4 2 205 205 410 860 Nassirya Crude 4 3 100 100 80 280 600 Najebia Natural Gas and Crude 2 2 130 130 160 Hartha Natural Gas and Crude 4 1 94 93 187 300 Out of Service for Unscheduled Maintanence Total: 1533 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 23 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 140 125 Gas Oil Musil Dam Main 4 4 562 600 Quds 2 2 200 160 Gas Oil Musil Dam reg 4 3 23 60 Mosil 12 7 104 150 Musil Pumping 2 1 100 0 Dibis 3 2 62 30 Haditha Dam 6 160 Old Mulla 12 7 106 128 Samarra 3 3 47 55 New Mulla 6 3 145 173 Himrin 2 2 43 21 Taji 7 5 70 55 Hindia 4 4 5 5 M. Taji 2 1 7 18 Kufa 4 1 1 0 Daura 4 2 15 30 Total 781 896 Hilla 4 2 30 64 System Generation MWh Najaf 3 3 140 129 Syrian Line Generation MWh Khor 4 3 120 80 Natural Gas Turkey Line Generation MWh Shuaiba 2 1 5 20 Natural Gas Total Generation 90119 MWh M. Shuaiba 2 Natural Gas System Peak Load 3770 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 70 MW Mossil East 5 4 12 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 2 45 Gas Oil Total Peak Load 4166 MW Diesel Gas Oil Baghdad Load 1221 MW Total 1220 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 23 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1300 Duhok 84 Naynawa 310 Tamim 120 Salah Aldeen 200 Anbar 185 Dyala 75 Babil 75 Kirbala 146 Najaf 156 Kadsya 55 Wasit 65 Muthana 59 Nasirya 140 Misan 61 Basra 310
الرئيسية / الخدمات الأساسية / ESS-17a16baf
الخدمات الأساسية
System Status Feb 23
- التاريخ
- 23 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| Report Date - 23 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | |||||
| Baiji | Fuel Oil | 6 | 4 | 100 | 95 | 90 | 70 | 355 | 500 | |||
| Daura | Fuel Oil | 4 | 1 | 25 | 25 | 30 | 80 | 180 | ||||
| South Baghdad | Fuel Oil | 6 | 3 | 75 | 75 | 200 | ||||||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 205 | 205 | 410 | 860 | |||||
| Nassirya | Crude | 4 | 3 | 100 | 100 | 80 | 280 | 600 | ||||
| Najebia | Natural Gas and Crude | 2 | 2 | 130 | 130 | 160 | ||||||
| Hartha | Natural Gas and Crude | 4 | 1 | 94 | 93 | 187 | 300 | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,533 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date - 23 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 140 | 125 | Gas Oil | Musil Dam Main | 4 | 4 | 562 | 600 | ||
| Quds | 2 | 2 | 200 | 160 | Gas Oil | Musil Dam reg | 4 | 3 | 23 | 60 | ||
| Mosil | 12 | 7 | 104 | 150 | Musil Pumping | 2 | 1 | 100 | 0 | |||
| Dibis | 3 | 2 | 62 | 30 | Haditha Dam | 6 | 160 | |||||
| Old Mulla | 12 | 7 | 106 | 128 | Samarra | 3 | 3 | 47 | 55 | |||
| New Mulla | 6 | 3 | 145 | 173 | Himrin | 2 | 2 | 43 | 21 | |||
| Taji | 7 | 5 | 70 | 55 | Hindia | 4 | 4 | 5 | 5 | |||
| M. Taji | 2 | 1 | 7 | 18 | Kufa | 4 | 1 | 1 | 0 | |||
| Daura | 4 | 2 | 15 | 30 | Total | 781 | 896 | |||||
| Hilla | 4 | 2 | 30 | 64 | System Generation | MWh | ||||||
| Najaf | 3 | 3 | 140 | 129 | Syrian Line Generation | MWh | ||||||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | Turkey Line Generation | MWh | |||||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | Total Generation | 90,119 | MWh | ||||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,770 | MW | |||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 70 | MW | ||||
| Mossil East | 5 | 4 | 12 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 45 | Gas Oil | Total Peak Load | 4,166 | MW | |||||
| Diesel | Gas Oil | Baghdad Load | 1,221 | MW | ||||||||
| Total | 1,220 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 23 FEBRUARY 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,300 | ||
| Duhok | 84 | ||
| Naynawa | 310 | ||
| Tamim | 120 | ||
| Salah Aldeen | 200 | ||
| Anbar | 185 | ||
| Dyala | 75 | ||
| Babil | 75 | ||
| Kirbala | 146 | ||
| Najaf | 156 | ||
| Kadsya | 55 | ||
| Wasit | 65 | ||
| Muthana | 59 | ||
| Nasirya | 140 | ||
| Misan | 61 | ||
| Basra | 310 |