DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 2, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 3913Mw, 89,225 Mw hours, 7-day Avg. 4116 Mw
Generators Returned to Service 30 Mw Mosil 3 15 Mw Taji 5, 15 Mw
Generators Unscheduled Out of Service 783 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 4
SP
NG system trouble
8
Baiji 4
SP
Boiler Leak
100
Baiji 5,
SP
Forced Outage (No ECD)
30
*Daura 4
SP
Generator trip
25
South Baghdad 1
SP
Air Heater
30
South Baghdad 2
SP
Boiler Leak
30
South Baghdad 4
SP
Boiler Leak
30
Nassirya 3
SP
Boiler Leak
150
Najebia
SP
Steam Leak
90
Baiji 2,
CP
Lubricating oil leak
40
*Baiji 1
CP
High Compression Vibration 40 Mosil 1 CP Rotor Defect 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo and Circuit breaker 15 New Mulla 6 CP Generator Defect 15 Taji 3, CP Compressor 15
*Taji 4
CP
Combustion chamber temp.
15
Taji Mobile, 2
CP
Software problem
15
Shuaiba 2,
CP
Gas Turbine Leak
80
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 874 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
01Mar
100
Baiji 6
SP
M
Bechtel
5 Dec 03
03Feb
100
Daura 3
CP
R
RIE/ME
1 Mar 03
TBD
20
Daura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Daura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME/Bechtel
30Dec 03
15 Feb
8
Dibis 4
CP
R
ME/GRD
Sep 03
30 Mar
18
Dibis 5
CP
R
ME/Bechtel
Sep 03
6 Feb
18
Hartha 4
SP
M
ME/Bechtel
23Oct 03
1 Feb
150
Khor Zubayr 4
CP
R
RIE/GRD
20Dec03
31 Jan
55
Najaf 2
CP
R
RIE/GRD
5 Dec 03
30 Apr
50
New Mulla 1
CP
M
RIE/GRD
13 Jan 04
15 Feb
30
New Mulla 4
CP
M
RIE/GRD
3 Jan 04
31 Mar
30
Old Mulla 5
CP
M
RIE/GRD
1 Nov 03
15 Feb
15
Old Mulla 10
CP
M
RIE/GRD
6 Jan 04
5 Feb
15
Old Mulla 12
CP
R
RIE/GRD
1 Oct 03
TBD
15
South Baghdad 5
SP
M
ME/Bechtel
1 Mar 03
6 Feb
35
Taji 7
CP
R
RIE/GRD
1 Oct 03
TBD
15
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
1 May
Haditha-Baghd West
400
Sabotage
RIE/GRD
15 Mar
28 towers complete/236 req’d Hartha-Qarna – Wasit 400 Sabotage RIE/GRD
29 Feb
208 towers complete/293 req’d Baghd South – Diwaniya 400 Sabotage RIE/GRD
Complete
27 towers complete/27 req’d Baiji - Baghd West #1 400 Sabotage RIE/GRD
10 Feb
60 towers complete/66 req’d Baghd E.-Baghd S. #2 400 New Line RIE/GRD
10 Feb
81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME
TBD
No Contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
Sabotage
ME
30 Apr
Baiji – Mosul
400
Damaged
ME
Complete
Mosul – Mosul East
132
Sabotage
RIE/GRD
TBD
Dibis/Irbil-Azadi/Quarqush 132 New Line RIE/GRD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
TBD
Baghd West – Jamia
132
Sabotage
RIE/GRD
TBD
Omara-Burzegan
132
Looting
ME
1 Mar
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date - 2 February 2004
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Power transferred from North to Middle 730 MW.
Power transferred from South to Middle 50MW.
Baghdad
1000
Duhok
82
Naynawa
450
Tamim
190
Salah Aldeen
175
Anbar
218
Dyala
136
Babil
114
Kirbala
131
Najaf
128
Kadsya
60
Wasit
115
Muthana
65
Nasirya
135
Misan
65
Basra
290
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-23f13ce6
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 2, 2004
- التاريخ
- 2 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: