CPA CONTRUCTION PROJECT BID SHEET
•
•
•
CPA PROJECT INFORMATION (To b. completed by th• CPA Action Officer) CPA PROJECT NUMBER:
CPA T PROJECTITLE:
Yard and com ound Secur
BID ITEMS
UNIT OF
MEASURE QUANTITY
UNIT PRICE ITEM COST
(S US) (S US)
1 • PERIMETER SECURITY ITEM DESCRIPTION SUE
Repair penmeter wall (concrete or II brick construction) sU
---+-
Construa new perimeter wall
1.2
(concrete or brick construction) SM consouct Precast concrete perimeter well LOA 2900 i
--
o
-----I
,
12300 348000
1.3 Repair perimeter fence (Neil
1.4 Construct newprimier wall (steel) ._ Construct new sbsel chin link fence 3 meters high SM 5520 60 .00 331200 Install steel dig plates 1 meter Ngh LM 1840 40.00 73600
1.5
Repair entry/m(10i Each
- _
1.6
Install new entry/exit gate Each Vehicle "$ell/ Pon' Each 3 1200.00 3600 Man "Sally Pon" Each 6 350.00 2100 Install razor wire on existing fence or I 1.8
1.7
well
Prepare surface And Paint mdalmil Oates Or fences wilt 1 coat primer
1.8
and 2 coats oil paint SPA
Prepare surface end Joint existing petirnter wall vnth 2 coats water based paint (latex) SPA
1.10 Othet (Describe.in
the
Use Bid Item 1
p if necejg
below.
0
Complete structural
tower with steel roofing concrtegte guar& 5000.00 UNIT OF
2. SITEWORK ITEM DESCRIPTION SIZE
MEASURE QUANTITY
UNIT PRICE (5
US)
40000
ITEM COST
(S US)
24
Remove ris and dispose
aru deb
d off site all SU_ trash
Demolish unsafe
structures
and
r
- 12 -
_
OtIspose_ofall_debris__ Grading and I7eling _ of _ LS round - (to
- - -- I
'nclude removi rorn_gr_ound)- 13 g prtotruaing ig_ 3Jects o
- - - - - - 2.4
Re air asphalt pavemelents or _SIV1-- 2009 7_00 14000
2.5 Replace asph ays
It paveri Llents or
S 5500
- - - —
Repair concret vvaiicwara
2.6
I pavements or It/J-_ o
Replace concr waiKway_s_ 2 ?--- te pavements or Re air other ty ie of pavements or 2 8 Other pescri Use Bi Item An the belovv.
it nece
_ _ _ _
_
Construct con rete entry atbpsi 0
- -
I Construct congrete entry orEtt-np 0 UNIT OF ( UNIT PRICE (S
3- FLOOR SYSTEMS rims DESCRIPTION SUE MEASURE QUANTITY I US) ITEM COST (A US) 1 ._31 Pressure wash lonrs and clean existing S o I Remove and d 3 2 r•ov_erirtgs spose damag_ed floor I SIVl o ! i A
•
CPA CONTRUCTION PROJECT BID SHEET
•
•
3.4
Repair structurally damaged floor slabs SM 0
3.5
SA Install new reinforced concrete floor slabispeciti thickness in bid)_. _ Other (Describe in the space below.
ills(' BM hem 10 if necessary i SM Indcate Unit of Measure Wow fRepair stairs SM « Install stairway raring LM 4 • WALL a CEILIN G SYSTEMS ITEM DESCRIPTION SIZE UNIT OF MEASURE QUANTITY UNIT PRICE US) 0 0 rt (6 ITEM COST (6 US) ;Remo.* damaged plaster from wells I (or ceilings and repair with mortar
4.1 and/
i r gypsum_plaster as regusind o SM 0 ,.
Prepare wall or ceding surface. apply I Coal primer/seater and 2 coats
4.2
latex (wale( based) pewit
SM 0
Prepare wait or ceiling surface, apply 1 coat pnmerisealer and 2 coats oil
4.3
besedyant
SM
Demolish unsound wells / °slings
4.4
and die/Eine of ail debris SM 0 Build new masonry wall with
4.5
mortar/plaster Fnish
Remove damaged ceramic tile wall
4.6
covering_and install new tiles
4.7
t- - Other (Describe in die space below.
lUst Bid Item 10 Inst./slurry) SSA SM I- 0 , Incicale Unit of Measure Below
-I
Fill In won openings SM
*- 0
Install suspended ceiling SM L Rernove suspeideo ceiling I SSA r 6 • ROOF SYSTEMS IT DESCRIPTION SIZE UNIT OF MEASURE QUANTITY UNIT PRICE US) 0 0 0 ($ ITEM COST (8 US)
5.1 Reseal Joints around roof tiles SM 0
5.2
5.9
Replace and seal damaged or miuintroof des SSA -4 0
-
Repair parapet wells. faida, or eaves 881 0
5.4 India new steel roof panels SM 0
5.5 Clear root drain and downspout Each 0 _ _ _ _ _ _ 56 Install new roof drain Each 0
5.7 Install new downspout Each
5.8 Other (Descnbe in the specie below.
Use Bid Item 10 if necessary) Indcate Unit of Measure Below 6 • DOORS 8 WINDOWS flU DESCRIPTION SRI UNIT OF MEASURE QUANTITY UNIT PRICE US) 0 (6 ITEM COST (6 US)
6.1
82
Install new wooden troilow-core door (*L recify_size)_ Each 0 Install new wooden door frame (Tecify 'MI) Each 0
5.3 Install new steel door Lsecify_sizt Steel cloud* door Each 0 84 High securq steel bars Install new steel door frames (spedfy size) Steel double door kerns Each
-.."-- 0
8.5
Install new deadbolt lodt and furnish 3 $eta of kyi Each 0 Lock set for high security steel bars door Each 0 _ —
•
CPA CONTRUCT1ON PROJECT BID SHEET
68
Paint existing door (1 coat primer .2 coats oil pain° Install other type ol door (specify size an _iLhi l pe in bid) Each
6.7
6.8
6.9
Bathroom stak door Each
Remove broken window glass and replace with new glass in existing frame 844 0 Prepare rough opening in wall and install now window frame and glass weary sue in bid) 0 _ Frame only Each P — Install steel security bars (burglar bars) on window Each High security Neel bars Each 0
0.10 Clean existing windows SM 0
6.11 Paint exis±N Window frames 8.12 Other (Descnbe in Ire space below.
Use Bid Item 101 necessary) EA
-.-1 — nclaste Unk Of
Measure Below
UNITOF
MEASURE QUANTITY
UNIT PRICE (8
US)
0
ITEM COST
mum •
7 • ELECTRICAL SYSTEMS ITEM DESCRIPTION SIZE
Install new surface-mounted electrical wiring (specify wire type 8
7.1
diameter) IN 0
7.2 Install new electrical outlet Each 0
7.3 Install nee wall switch Each
7.4 Install new flourescent light fixture Each 224 Install nightfghts Each 0
7.5 i Install nee _t_ Ian Each 140 Install new telephone cable (single 78 pair) Each 2100 10.00 20 Install new telephone **Wee
7.7
_4dlann_p _sk Each 0
'Install new circuit breaker (specify _7_.13 ...... pe and capacity) Each 0 _ _ Install new circuit breaker panel (specify number of breakers and
7.9
capa _Lo_ry)
-- -- - -
Install new isolation switch (specify
7.10
type and capacity) Each 0
Install new mains transformer
7.11
and csity)
Install new mains cabling (specify
7.12
type and size) LM 2100 70.00 147000 Install new electrical generator with changeover switch (specify make.
7.13
model, and cacityl_ Each
Install new fuel tank for generator (with capacity to ooerate generator 714 72 h for ours continuously) Each _ _ _ _ .
._ _ _
_
0
. _. __
_ ._ .—
Install new exterior - security lighting .
7.15
MciAy.p and sizki
on buildings
Each
12
250.00
3000
Install new exterior security lighting — — (spea_bi ty_and size) on perimeter well Each 118 200.00 20200 — — 7.16 Indicate Unit al Other (Describe in the space below.
LOU Bid Item 10 if necessary) Me2 sL. re at:Arm 0 UNIT OF UNIT PRICE IS ITEM COST
3. MECHANICAL SYSTEMS ITEM DESCRIPTION SIZE
MEASURE QUANTITY
US)
IS US)
:Install new window air canigtjoning 8 1 untmecify_number of watts/amps) _ — _. — Install new split air ccnditioning unit .
8.2
-- —
(specify number of to-ts)
Each
8.3 LM 0
(Install new eclaust fan and ductwork'
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
8.4
install new air supply ductwork LM __
6.5
6.6
Install new air exhaust cluchvork IN o Other (Desaibe in the space below.
! Indicate Unit of
Use Sid Item 10 if necessary) ; Measure Below 9 • SANITARY & WATER SYSTEMS ITEM DESCRIPTION SIZE UNIT OF MEASURE QUANTITY UNIT PRICE US) 0 IS ITEM COST )SUS)
9.1 Install new Eastern style toilet Each 1400
9.2
Install new Western tittle Wet
-
9.3
r-- -
9.4
9.5
9.6
9.?
Test and clean sanitary drain pipes Lath 0 Instell new sanitary drain pipes (specify diameter and type) IN 1270 20.00 25400 Clean and reper existing septic tanks (to include new locking hatch covers) Each 0 Install new war tank (to metals l0ckin9 hatch covers)_ Lash 5 1000.00 5000 Remove misting aortic tanks and manholes Each 13 760.00 0760 Install new porcelain sink with shut.
off valves
Each 0
9.6
Install new water piping (specify size and bps i.e. PVC. steel. osipet.) IN 150 15.00 2700
9.9 Install newIllign shul-olf valve Each 0 4
9.10
ORM
beddlow prevention valve Lath 0 .
_
„
9.11
*Mall newplastIc water tanks Each
9.12 Other (Describe in the space below.
Use Bid Item 10 if necessary) Indicate Unit of Measure Below '
1.--
Install chow unit Lads
Water pump Lath
UNIT OF
MEASURE QUANTITY
UNIT PRICE
US)
0
(8 ITEM COST
(SUS)
10 - OTHER BID ITEMS ITEM DESCRIPTION SIZE
Provide armed sectirity personnel 24 hours per day during Use entire 1 10.1 a the contract ,duration DAYS
10.2
Replace kilaten table/shelf Each 0 loo 0 104 0
10.5 0
10.6 0
101 0
10.8 0
'- 10.9
0
_r
10.10
0
10.11 0
---,-
10.12 0
10.13
}.---_ 0
10.14 I
10.16 :
Estimated MD PRIOR 1036134
CPA CONTRUCTION PROJECT BID SHEET
S
•
•
•
• • • •
Basrah Central Prison
Interior Electrical Load Estimate INTERIOR PRISONER UGHTING INTERIOR WORKSPACE monied OTHER ELECTRICAL LOADS ITEM.1 Calling tight with PretactIve Grill ITEN4 ITEN4 ITEM-6 ITEMS I1E3I-7 I7EM.8 ITEM-S ITEM-40 Night Light with ProtectIva Grill Calling Light Calling LigM Ceiling Fan with 16 Anm Outlets Ceiling Fan 13 Amp Otter** 14fp Wafer Pump Retridgerator (ialhvaya) (Workepaca) Protoctive Grit for Window NC Units Maximum Wattato 40 16 40 40 75 76 3,120 3,600 750 76 Bldg Total PalleImurn Maximum Bldg Total Design Load AmP•ros 0.2 0.1 0.2 0.2 0.3 0.3 13.0 15.0 3.0 0.3 Wattage Maximum Amps Wattage gieta.1) Building 11 Building Sr &Ming (Prisoner Detenlien1 I Of 1.1014. 1 Of Uffhts l oll Light* 0 Of Lights 11 of F404 0 of fent I lot 0141140 1 • of 13411010 044P01111fs ? of Refrldpitox.
ItAl
3,360
34
34
0 0 17 0 0 0 1 0
.t. 2.,p911
11 1 923
____ ____
. _
2
1/A1 Guard A
240
2 -1--
- 0
0
-4 2 I - 2 0
0
- 13,572
57_
.. 6,292
_
3 1142
3,380
_ _ 34
---1--- 0
_i
._ _ _
_
o
17
0
.
iii2diiara -
_
_
240 .
2 r- 0 .1_ 0
1 - -1
0 Z598
if
- t.i_di
_ _
I 0
1
0
2
0
0 1357- 2 . .
- -
- -67 - -
-
6 r 8A3
- - - 7 - T-- 34 0
373E10
0
17
0
0
. .1
1
0
2,696
f 1
i,,823
_ _ _
240 2
o +- L
1
t
o --1 --Tr -_-_- - pi-- 4 - 3 Giair-d - _ _ _ o 1 2
- .ii- - -1 - 13 672
67
-1
-
---
8,292
r
17
3,380 34 34 . 0 0 1- - ----0 -----1- 0 0 - 1-
-I- 1
Veil
11 1.923
9_--I.
6 _41- 44
Ofaird 240 2 2 . 0 I 0
A Ilatnrootn 1 650 I--- --r 1 1
- 2
0
i
0_
___a13,572
_:1
57 13,292
0 T 0
3
_
0 0 --J o , 1 5
1''b
_
_
_
_
1 r,1013
433
10 -1 4
7
_
0 -1- 0 i
flatnroom 2 L_ 650 13 3 0
0 0 1 -1----- 0
r 1,388 1
-4-- --F -
• -943
4- 0
_____
.- -
260 -TU11370741.
16,700 144 167 0 0
4 41.166
L 67.164
11411403 (69lsons+ Ostendon) • 11 ,181
- - 15 081 GuircT ----
I 240 2 0 F 0 1 1
_
_ _
_j_ 3,380 34 0 0 17 0 0 0 5 _z_l_ iIf 11
1.523
+
67
2 0 13 572 „ 8,292
13
082 1 3./30 34 4 0 1
17 0 0 1
---1- 0
5 2,_9__ 11 1._
11 1923
_
__
14 11182
bawd
2
, p __,, j __'
2 I
I
0 I 2 0 0 13,0_ 72 57
6.292
15 - - - 41 - 671
,- -
3,300
,
L
34 34 0 0
_
__ -I- 17 0 I 0 ___i 0
1_ ._______
0 1,696 I
_ _1,123 __
10
083 Word j
1_
240 - _.3..._ 2 - I - 0 0 '
1
0 -r 2 4 --- 0 13 572 57 5292 I 2 0 - a :.
17
0531
3,360
34
34 ---- r---
0
0
i
17
0
I- 0
0 1
2.698
11
1
923
- - - 1i
iB4 Guard
240
2
0
1
.,
f- 0
I 0 --I
_
__I
2
2 0
0
13,572
57
8 292- -
_
_
19
B Bathroom 1 -
660
7
7
0
I
3
0
0
0
1
.
4-
1___ 0
_1,1_ 06
.. _
6 __1_
433
- 210- - 1 --- emmTmm -2-- 650 1_ 7 Z.
_
0 - --1
1 0
3
0
' 0
0
t 1
0 - 43-----4
.4---
__1,108
5-
I 167
0
- 0 -+
0- 1----
--
SUBTOTAL 16,700 117 0 .
.
------r 64,116- 1- - Z7.- ---1- 41,725 CABIN, tf1 f1some 041411140) 21 9C1 370 343 13 I 18 I I-- 41C2 T 13 1 " 36 - i____0_ _l_ o 1- afP4 13 _I___ 2,659 _ 22 3,5F3-- + ,_. 35 _,_ i -1- is o 0 3 234 13 - T 2,669 1__ 3,670 4 38 1 7
- - 31i - - - 7-
13
I
18
0
0 o
..._
.
.
---- i - o ...1
4- 1 -1--
0
_2,234
:-. 13 1 2.659
24 ip Barroom
1--
_
_
, 660 I 7
7 0
--I-
0
3
-
----
-1 0
i 0
0
I 1
0
1 108
6 433
_,_____
--I-
I SUBTOTAL
'- 11.340 . 114
t 114 30 0
0
-T -
0
T
4
0
-10 soi-
I
41 - I Vol
.1090101141,411g Ofetiener Dettfat1001 25 m 'enu iiivo , 2,090 ' 21 1 10 I 0 1 221 1
---1- 1. 046
_ -
iltiefarAt - 1 tow
. xi --4 0 10 7 I 1,046 7
0
1,721
BMA* W1011 Dasnlion)
0
1.163
6
488
,Guan/ Room 180 • -0-
--i. a 2 -
_
1 , 5 928
10,128
42
_
I TIUBTOTAL , 1.100 ! 13 I 3
0 I 2 I I
, 0 111.2111
47
6.416
140 ,00611911 somr1:4041000411 _ .
27 bon 9109_
I 2.300 ' 18
12 •
_
-I.- 1.940
8 1 266
____
_
_
,SUBTOTAL
r 2.300 111 0 0 2 12
1,940 8 I 1,265
SWF/ S•0•00 WO
28 iVa..tors Center , 4,060 r 0 0 0 41 0 20 6 1 0 22,801 94 12 574 29 !Re044 1 63,113819 ' 3360 0 0 10 38 0 16 18 0 1 1 80,014 260 31 259 Admnistrallon , 30 0udert0 1 800 0 0 0 18 0 7 7 I 1 1 1 27,610 116 14 035 31 ,Modral Center 4.030 0 0 0 40 0 20 12 ' 12 1 2 84,663 353 I 52 308 r Stet! and Regan,* I , 32 'HO 3 990 ' 0 0 9 40 0 II i ill 10 1 1 102006 425 59 331 ,K,tcPen end Rem I' 33 . Hat 0.190 0 0 0 52 I 0 31 4 10 1 4 64,327 226 36 012 34 '_ Guard House 300 0 0 0 3 0 2 1 1 3 0 6,990 29 4.350
• • • •
Basrah Central Prison
Interior Electrical Load Estimate INTERIOR PRISONER LIGHTING INTERIOR WORKSPACE LIGHTING OTHER ELECTRICAL LOADS 'TEMA Ceding Light with Protective Grill ITE14.3 ITEM-4 ITEM-6 17E614 ITESST ITEM-8 ITEM-9 I1510-10 Night Ugly with Protective Grill Ceiling Light Ceiling tight (Hallwayal (Woilcspace) Ceiling Fan with Protective Gnil Ceiling Fan 13 Amp Outlets 16 Amp Outlets
1-Hp Watar Pump Rafrldgerator for Window NC Units Maximum Wattage eo 16 40 40 76 16 3,120 3,600 760 76 Maximum Amperes 0.2 0.1 0.2 0.2 0.3 0.3 13.0 15.0 3.0 0.3 Bldg Total Maximum Wattage Bldg Total Maximum Amps Design Load Wattagt (Note.1) Budding a Building SF 'Generator and 33 :Water Tan6 Btda 860 0 0 0 I 9 9 0 0 1 0 1,214 18 1,379 !Entrance GLard 36 I House 1 200 , J 1 0 D 2 1 1 3 0 6 462 29
4.342
:Entrance Guard '
37 ,HOuSe 2 200 I 0 0 0 3 0 2 1 1 0 0 6.982 29 i I SUBTOTAL 26,546 o 0 19 266 0 1 110 71 36 7 a 378,297 1,668 4,342 221,932 ' Guard Tower 1 i 0 0 0 0 1-- 0 0
- — r - Gual0 Timer 2 T--- 0 0 0 4- 0 0 0 0 0 ..4 0 0 0 — 0 0 ...1 0
-t•
0 r — 0 I— 0 a
a ....„0_
-- — --eGusra neer r -i-
, 0 0 _, 0 0 0 0 0 0 0 0 i o 0 o ' Guard Meer 4 0 o L o o o o f f _t____ o o o o o o o Gumd Totter 3 o o i o o __I, o --t ..,o o o o o ard T Guout 6 I 0 L 0 - 0 0 0 0 0 0 0 j_EruiirrTcTter7 i i 0 o o 0 o i o o o o
1.
0 0
0
,
_
_
_
r
1 - 0:saiiCtaker a i
I o o .
C
o 7 0 i 0
-4—___ L 0
I--- 0
0 0
0
.._ i • 0 0
-- tl
— tflitftiTAI. i 0 t"--- 0 0 IT — 0 - -1 0 0 - e , TOTAL ?VW 41 41511 SS 251 241 110 OS to a * moor uso stiOr Note-1: Omar Lola Waste) a baud on the euunstion Jet Ihe fealty ial na be Lonsurninitm nmarmen total loao at eil trnes The esouinitais ate ea follows
- t...
ilTekt
orejel Load
• 100% dmittenuns bad 4-
11131.2
Dear Load
a 100% of memniurn lows
1fl'EW3 Daii jr Load • 100% a mecum load .
IITE164_
Mar Load
• 100% of magnum load r • 4- 11E614 - - --1- 01151An Load Maio Load
• 100% ot mucus load L /-
1— I .
ITEU6 • 30% of tamemum load 1 - I I TE14.7 Desi ar Load • 70% of tatudinum load -J L iTEM-8 Deeltn Load = 10% of madman load ITEM-9 0061711.0ed e 100% of mratnum load r - - i I
Basrah Central Prison
Electrical Load
MAX (kw)- DESIGN (kw).- •
Interior Load I 536,107
7
r
_
Exterior Load i 75,250
Subtotal Load 611,357
Safety/Expansion Factor (15%)-1 91,704 322 75,2 0 397, 27 59,659 Maximum Total Load 703,061 457,386 EQUIPMENT INVENTORY & COST ESTIMATE (Costs to Purchase &Install) QUANTITY UNIT COST ($) ITEM COST (5) Emergency Generators 600 KW 2 $119. 00 $238,1 ITEM-1 Ceiling light with protective gri#91 $2 $9,8 ITEM-2 Night Light with protective gri11458 $2 $9,1 ITEM-3 Ceiling Light (Hallway 58 $1 $5E efEW1- - 4 - diTiling Light (Workspace) 259 $1 $2,5 ITEM-5 Ceiling Fan w/Protective Grill & Room Wiring 259 $3 $9,0 ITEM-6 Ceiling Fan w/Room Wiring 110 $2 $2,7 ITEM-7 13-amp Electrical Outlets w/Rditliirn Wiring $1 $8G ITEM-8 15-amp A/C Electrical Outlets w/Room Wiring 53 $1 ITEM-9 1hp Water Pump (Centrifya1)26 ITEM-10 Refrldgerator 9 $5 $1 0 0 $2,6 $4 d 1TEM-11 Perimeter Flood Lights (250 Watt Metal Halide, Pole Mounted Mounted) 172 $4 0 ITEM-12 Yard Flood Light (150 Watt Low Pressure Sodium Light, Wall Mounted) 162 $2 0 1TEM-13 Overdoor Flood Ligh - C( 1150 Watt Low( Pressure Sodium Light, Wall M T 0 $13,2 nteci)53 $2 TOTAL $403,032 t NOTE-1: Estimate does not include overhead (8%) and profit (8%). Uni Overhead and profit to be included in summary estimate of all work elem NOTE-2: Estimate does not include purchase and installation of new me breaker panels, isolation switches, or cabling. These depend on the inst Assessment Team
•
•
I
41
!..1
i
l
;
2'
±
ac
iiiilifilii
Piiiiiiiii
g g fl f il zt 111 i 1
P : f q i 1 1 f hi
,
--- 7 -H - -- - - -
-
4 :
..
_
,..... 1
I
, .
1
I
1*****1**
I
_
.
•
11 g 1
-- -- —
.
— --
n 1§
1
i'g.
.....
...
. r: U a .
!
i I
t
vi
- --I-
- -
I.
I
It:-
ig'471,1 1:... - : - !--
A
ir il
' II
kt
±--4-
$
1:- •
T
'..
1
H
i
t g
t
i
fr.
—1
I
0
1
r.r,
i-
t
_
11
N.
+
ii
+.
I
1
-1-
I
n
i I
4);.s
I
2v rirt
i , I
; it.”.
vtioi§I gmlig
411.10.
i i il 4
litissmq
l it i
I fi if
_
lin
1
Th_..... 1_
miziliwil
i
§§11x1 wroli
_
i_
_.,___ H_
1
. _,_
q
.
..22.
I*
ig!...........L...1...
TT
t
osalsOs 0
•
•••
•
II
n
..Y
._ .,
1
.
1§§§ I §asgaimi§ I iiismia§§§i§ J_ 1
1. li
.10..,-••• t,-. • •
' I"'"
,
Security: Windows
Type: SW #1
SW 42
SW #3
SW 44
SW 45 Size: 500 mm x 610 mm (20" x 24") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Square stock 15 mm X 15 mm (9/16" x 9/16"); vertical bars continuous; horizontal bars intermittent Spacing: 64 mm x 64 mm (2.5" x 2.5") center to center vertically and horizontally Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Restricted Construction: Welded with continuous welds Size: 250 mm x 250 mm (10" x 10'') Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1"x 3/16") Bars: Square stock 15 mm x 15 mm (9/16" x 9/16"); vertical Spacing: 64 mm x 64 mm (2.5" x 2.5") center to center Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Restricted Construction: Welded with continuous welds Size: 915 mm x 915 mm (36" x 36") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Square stock 15 mm X 15 mm (9/16" x 9/16"); vertical bars continuous; horizontal bars intermittent Spacing: 64 mm x 64 mm (2.5" x 2.5") center to center vertically and horizontally Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Restricted Construction: Welded with continuous welds Size: 460 mm x 460 mm (18" x 18") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Square stock 15 mm x 15 mm (9/16" x 9/16"); vertical Spacing: 64 mm x 64 mm (2.5" x 2.5") center to center Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Restricted Construction: Welded with continuous welds Size: Frame: Bars: 250 mm x 760 mm (10" x 30") Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/1 6") Square stock 15 mm x 15 mm (9/16"x 9/16"); vertical
w#1 W #2 W #3 W#4 W #5 Spacing: Mounting Frame: 64 mm x 64 mm (2.5" x 2.5") center to center Steel Frame bolted in wall with tamper proof bolts Movement: Restricted Construction: Welded with continuous welds Size: 915 mm x 915 mm (36" x 36") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Typical building safety bars Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Unrestricted; glass open inward Construction: Welded with continuous welds Size: 460 mm x 460 mm (18" x 18") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Typical building safety bars Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Unrestricted; glass open inward Construction: Welded with continuous welds Size: 250 mm x 760 mm (10" x 30") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Typical building safety bars Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Unrestricted, glass open inward Construction: Welded with continuous welds Size: 460 mm x 1070 mm (18" x 42") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Typical building safety bars Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Unrestricted; glass open inward Construction: Welded with continuous welds Size: 460 mm x 915 mm (18" x 36") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Typical building safety bars Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Unrestricted; glass open inward Construction: Welded with continuous welds
Security: Doors
Type: SD #1 Size: 2030 mm x 915 mm (6'-8" x 3.-0") Type: Bars - open Frame: Steel Bars. Steel square stock 16 mm x 16 mm (5/8" x 5(8"); smooth surface; vertical bars continuous;
Horizontal bars intermittent; Reinforced horizontally at third points and at latch Spacing: Mounting Frame: Hinges: Movement: Latch: 64 mm x 64 mm (2.5" x 2.5") center to center vertically and horizontally Steel frame bolted in wall with tamper proof bolts Steel with tamper proof hardware Must open outward with possible rotation up to 180 degrees External sliding bolt with flip down clasp and loop for padlock;
Latch to be attached to door with tamper proof bolts Construction: Welded with continuous welds; hinge and latch attachments with tamper proof bolts SD #2 SD #3 Size: 2030 mm x 813 mm (6'-8" x 2'-8") Type: Bars - Open Frame: Steel Bars: Steel square stock 16 mm x 16 mm (5/8" x 5/8"); smooth surface; vertical bars continuous;
Horizontal bars intermittent; Reinforced horizontally at third points and at latch Spacing: Mounting Frame: Hinges: Movement: Latch. 64 mm x 64 mm (2.5" x 2.5") center to center vertically and horizontally Steel frame bolted in wall with tamper proof bolts Steel with tamper proof hardware Must open outward with possible rotation up to 180 degrees Key locking mechanism with additional dead bolt on inside Latch to be attached to door with tamper proof bolts Construction: Welded with continuous welds; hinge and latch attachments with tamper proof bolts Size: 2030 mm x 813 mm (6'-8" x 2.-8") Type: Bars - open Frame: Steel Bars: Steel square stock 16 mm x 16 mm (5/8" x 5/8"); smooth surface: vertical bars continuous;
Horizontal bars intermittent; Reinforced horizontally at third points and at latch Spacing: Mounting Frame: Hinges: Movement: Latch: 64 mm x 64 mm (2.5" x 2.5") center to center vertically and horizontally Steel frame bolted in wall with tamper proof bolts Steel with tamper proof hardware Must open outward with possible rotation up to 180 degrees External sliding bolt with flip down clasp and loop for padlock;
Latch to be attached to door with tamper proof bolts Construction Welded with continuous welds; hinge and latch attachments with tamper proof bolts
SD #4
Size: Type: Frame: n #1
D #2
D #3
D#4
Facing Viewing port. Mounting Frame: Hinges: Movement: Latch: Construction: 2030 mm x 810 mm (6'-8" x 2.-8"); final thickness 25 to 40 mm (1 to 1.5") Steel plate - solid face with hollow core Steel channel or rectangular tubing to provide door thickness of 25 mm (1") to 40 mm (15");
Horizontal bracing at quarter points or continuous bracing through core filler;
Steel plate minimum 3 mm (1/8") thick mounted to both sides of steel angle frame 75 mm diameter observation aperture Steel frame bolted in wall with tamper proof bolts Steel with tamper proof hardware Must open outward with possible rotation up to 180 degrees External sliding bolt with flip down clasp and loop for padlock;
Latch to be attached to door with tamper proof bolts Welded with continuous welds; hinge and latch attachments with tamper proof bolts Size: 2030 mm x 915 mm (6'-8" x 3.-0") Type' Exterior metal door Mounting Frame: Steel frame bolted in wall with tamper proof bolts Hinges: Steel with tamper proof hardware Latch: Typical door latch with key set Size: 2030 mm x 915 mm (6'-8" x 3'-0") Type: Interior solid wood door Mounting Frame. Steel frame bolted in wall with tamper proof bolts Hinges: Steel with tamper proof hardware Latch: Typical door latch with key set Size: 2030 mm x 810 mm (6'-8" x 2.-8") Type: Intenor solid wood door Mounting Frame: Steel frame bolted in wall with tamper proof bolts Hinges: Steel with tamper proof hardware Latch: Typical door latch with key set Size: 2030 mm x 1830 mm (6'-8" x 6'-0") Type. Exterior metal double door Mounting Frame: Steel frame bolted in wall with tamper proof bolts Hinges: Steel with tamper proof hardware Latch: Typical door latch with key set and hardware to separately latch one door to upper and lower jam Security Enclosures
Type: SFE #1
Security: Light Enclosures Type: SLE #1 Size: Frame: Bars: Covering: Low profile steel cage with dimensions to accommodate fan dimensions Steel angles 38 mm x 38 mm x 7 mm (1.5" x 1.5" x 1/4") Steel square stock 15 mm x 15 mm (9/16" x 9/16") Steel security mesh grill with maximum hole size 3 mm square attached to outside of frame to prevent any ligature being attached or used as an anchorage point;
Mounting Frame: Steel frame bolted in ceiling with tamper proof bolts Construction: Welded with continuous welds Movement: Restricted; removal only necessary for maintenance Size: Low profile Type: Bulkhead style Covering: Shatter resistant plastic Movement: Restricted; removal only necessary for bulb replacement and maintenance
Basrah Prison
Security and Hardware Requirements Building Approx. Sq.
Ft. Area
Security I
Non-
Security
Number of
Rooms
Window wl Windows wi Doors Doors with Doors Solid Security Regular Wood Bars Metal Face Bars Bars Interior Ceiling Fan Doors Metal In Exterior Enclosure Ceiling Fan Bulkhead Light Enclosures Lights A-Wing 28 - SW #1, 1 #A1 3360 S 2 9 - SW *2 12 -SD#4 8 - SFE *1 8 12 - SLE #1 12 2 #A1 Guard 240 S 1 2- SW #3 1 - SD 13 1 2 28 - SW*1.
3 #A2 3360 S 2 8 - SW #2 12 -SD#4 8 - SFE #1 8 12 - SLE #1 12
4 *A2 Guard 240 S 1 2 - SW #3 1 - SD #3 1 2
28- SW #1.
5 #A3 3360 S 2 8 - SW *2 12 -SD#4 8 - SFE #1 8 12 - SLE #1 12
6 #A3 Guard 240 S 1 2 - SW #3 1 - SD #3 1 2
28- SW #1.
7 #A4 3360 S 2 8 - SW*2 12 -SD#4 8 - SFE #1 8 12 - SLE #1 12
8 #A4 Guard 240 S 1 2 - SW *3 1 - SD 03 9 A Bathroom 1 650 S 2 14 - SW #4 10 A Bathroom 2 650 S 2 14- SW #4 1 2
6- SLE #1 6
6- SLE #1 6
B-Wing
28 - SW 11,
11 *81 3360 S 2
8 - SW #2 12 -SD#4 12 #B1 Guard 240 S 1 2 - SW *3 1 - SD #3 8 - SFE #1 8 12 - SLE #1 12 1 2 28 - SW #1, 13 #B2 3380 S 2 8 - SW*2 12 -SD#4 14 #62 Guard 240 s 1 2- SW #3 1 - SD #3 8 - SFE #1 8 12 - SLE #1 12 1 2 28 - SW #1, 15 #133 3360 s 2 8 - SW #2 12 -SD#4 16 *B3 Guard 240 S 1 2 - SW #3 1 - SD #3 8 - SFE #1 8 12 - SLE #1 12 1 2 17 #64 3360 S 2 28 - SW #1, 8 - SW #2 12 - SD #4 8 - SFE #1 8 12 - SLE #1 12
18 #B4 Guard 240 S 1 2- SW #3 1 - SD *3 19 B Bathroom 1 650 S 2 14 - SW #4 20 B Bathroom 2 650 S 2 14- SW #4 1 2
6- SLE *1 6
6- SLE #1 6
C-Wing
21 *C1 3570 S 6 15 - SW #1 8 - SD #1 22 #C2 3570 S 6 15 - SW*1 8 - SD #1 23 #C3 3570 S 6 15 - SW #1 8 - SD *1 12 - SFE *1 12 24 - SLE #1 24 12 - SFE #1 12 24 - SLE #1 24 12 - SFE #1 12 25 - SLE #1 25 C Guard's Room S 1 2 - SW #1 1 -SD #1 2 3 24 C Bathroom 650 S 2 14 - SW #4 6- SLE #1 6 25 Juvenile Blgd 2090 S 9
9- SW #1,
9 - SW #4 8-SD #3 9 - SFE #1 9 10 - SLE #1 10
26 Female Bldg 1340 S 4
20 - SW #1,
3- SW #2 1 - SD #1 4-SD #4 8 - SFE #1 8 10 - SLE #1 10
Segregation
27 Bldg 2300 S 18
17- SW #1,
14 - SW*5 17-SD *4 17 - SFE st 17 19 - SLE 01 19 8 - W *1, 28 Visitor's Center 4050 N 4 8 - W *2, 3 -D*2 2- D*1 9 21 14 -W#1, 29 Reception Bldg 3760 N 13 2 - W *2 14 - D #2 3- D *1 14 40 Administration 6- W *2, 5 - 0 *2, 30 Budding 1800 N 8 9- W#4 2 -D#3 2- 0*1 9 24
17-W#1, 31 Medical Center 4030 N 9 2- W *3 5 - D #2, 1 - D *1, 2 - D #3 1 - 0 *4 11 - SEE #1 17 40 Staff and 33- W #1, 20 - D *2, 32 Regional HO 3990 N 38 9- W *5 10- D#3 12 -D#1 20 72 Kitchen and 37 - SW # 3 33 Rec Hall 6190 S 5 2 - SW 115 8- D *1 21 38
• • • •
34
Guard House 300 N 2
3- W #1 1 - 0 #3 1
-0 *1 2 5
35
Generator and
Water Tank
Bldg 860 N 3
4 - W #.4 1-D#1 3
-D*4 6 9
36
Entrance Guard
House 1
280 N 2
2 - W *1 3
- 0 *1 1 2
37
Entrance Guard
House 2
280 N 2
2 - W *1 3
- D*1 1 3
38
Guard Towers
(8) 100 N 1
8
Basrah Prison
General Repair
Building
Approx.
Sq. Ft
Area
Security /
Non-
Security
A-Wing
1 SA1 3360 S
2 SA1 Guard 240 S
3 1A2 3360 S
4 SA2 Guard 240 S
5 SA3 3360 S
6 SA3 Guard 240 S
7 SA4 3360 S
8 SA4 Guard 240 S
9 A Bathroom 1 650 S
10 A Bathroom 2 650 S
Yard! Courtyard
B-Wing
11 SB1 3360 S
12 *B1 Guard 240 S
13 SB2 3360 S
14 SB2 Guard 240 S
15 SB3 3360 S
16 #133 Guard 240 S
17 #134 3360 S
18 1184 Guard 240 S
19 B Bathroom 1 650 S
20 B Bathroom 2 650 S
Yard / Courtyard
C-Wing
21 SC1 3570
22 SC2 3570
23 *C3 3570
24 C Bathroom 850
Yard! Courtyard
25 Juvenile Blgd 2090
Yard / Courtyard
26 Female Bldg 1100
Yard / Courtyard
27 Segregation Bldg 2300
Yard / Courtyard
28 Visitor's Center 4050
29 Reception Bldg 3760
Administration
30 Building 1800
Yard / Courtyard
31 Medical Center 4030
Yard / Courtyard
Staff and
32 Regional HO 3990
Yard f Courtyard
Kitchen and Rat
33 Hall 6190
Yard! Courtyard
34 Guard House 300
Generator and
35 Water Tank Bldg 860
Entrance Guard
36 House 1 280
Entrance Guard
37 House 2 280
Yard / Courtyards
CPA CONTRUCTION PROJECT BID SHEET
•
/- PA PROJP‘rT INPOIRIVIA-rarml (ro be•lcompletrwl b _the CR0 AN.r. ' bon OfiFir-er) CP_A_PROJECT NUMBER:. _ _ 1- - CPA PRC1-1FCT TITLE:. A-Wing and B-wing Building BID ITEMS J UNIT_QF UNIT 4RICENI C 1 - PPRuviFTFR 4RaimilTyrwsrtRiptioNsvp NIFANIIREambilri-,05 u ($ L., Repair perimeter wall (concrete or 1 _ _ _ _ _ _ _ I 1_1_brick constructipn) SM _ T Construct new _Perimeter wall 1 r _ _ _ _ _ ____ _ 4 1-2(concrete_or ___E_ bripk_constructi110)- - _ --- f
-
Construct Precast concreteA r a rimete '
- 0 -
_
_
I 1.3Repair fence (fstedilpil perimete1r _ t _0_ 1 _ _ _ _ _1_4Construct perimeter 1 new waitMsteel.) 0 a _ new_Oelebediuitiblffilld-fence ___lConstruct _ _ _ _ _ _ _ _ _ _ _ _ _ _ —
•
_ _
_ _ _
Jinstall_steel dig lillateter_lhigli_M_ 1
1.5Repair entry/exit gate- [ Each 0 _1-5Install new entry/ 1 exilt_gate Each 0 ' _ _Vehicle"Sally_Pr i _1_ _Each 0_ _ ri."_ _0 _ Man "Sally Portr 1 Each _ _ _ Install razor wire on existinci fence or _ 4 1.7_wall_ _i_ _ _ _1_ _ ._ _ _0_ - Prepare surface and it existing gates or rencesiwith coat primer _ _ _ _ _ _ _LA./Eland 2_coats oil_paint SM _ _ . --1-.. _ _ 0_ _ Prepare surface and paint existing erimter wall with 2 coats water __ _1.9 _ _ -qm 0_ sedr intAlatex)_ 1 .1 h r s e e B D e s c r i b i I t e m i o p i i t n t the :
n e
Mlia.-- icill - de:blibilck3 b ure Be iltoo wi f
----
--
.
-- -
Complete - structurai concre bi ll5zig -arTA
- -.—
tower with steell roofing!
liZERM A
IPtil
UNIT OF UNIT PF ( il9
n)
g - SITFWORK IT nrS RIPTIIONS17P MPASuif riljANTITyj f Remove and diUpose off site all trash
- - — - -
g.l_arui_debris SM_
_._ _
r_ _ _0_ _
Demolish unsafe structures and _ _ _ _ _ ___ _2.2ciispapse _LS_ _0_ of all_debris_ Grading and leveling. orlgi :ound (to include removing pFotru ing objects
•
_ _ _ _ .4___
2.3 from ground) 4._ _ _1_ _SM — Repair asphalt Pavements or
2.4walkways 1 SM _
4 -° -
0
Replace asphalt pavements or _ _ _ _ _ _.
_2.5walkways_ _ _ _ _SM_ - - 0 r Repair concrete pavements or _ Replace concrete pavements or 0 _ _ _ _ . 2.7walkways 1 _SM _0 _ _. --2.8-walkways- Repair other type of pavements or 2.9 Other escribe In the sadiaiModUr icait of _ _t _ __ __ pl _ NI _S _ }-- 0 _ Use Bid Item 10tit necessaieptsure Below
- - - - —
t - - _i_ _ _
t _
Construct concrete entry sMposh 10.001 8
- - - -
_ _1
_ -
-' 80_
-
--c - on- str - uct - conc cite en - iry rpti _
- I
.
UNIT 4)11F UNIT PM MA
3... Pi 001:Z SYSTFuniAut nr.Revanwr hisi7F 1111FASilmfs(JANTi-rvi9) 1 ( 119 1 Pressure wash nd clean existing Remove and diepose damaged floor i
3.2coverings 1 -SIVI 0
I rsce*aill rs"utr flewki r•e-wata,ri neva .R.R/1 Alinn , 14 rin I -4Ann
•
CPA CONTRUCTION PROJECT BID SHEET
•
•
Repair structurally damaged floor
3.4 slabs
Install new reinforced concrete floor i3.5 slab (specify thickness in bid) . 3.5 jOther (Desathe in the space below.
Use Bid ttem 10 if necessary) SM 0 SM Indcate Unit of Measure Below Repair stairs SM 0 — VidaII stairway railing LM 4 • WALL Di CEILING SYSTEMS IT DESCRIPTION SIZE LAO' OF MEASURE QUANTITY UNIT PfUCE US) (8 ITEm COST (S US1 Remove damaged plaster from Wile or ceilings and repair wart mortar
4.1
end/or gypsumaster as required SM 0 I Prepare wall or ceiling surface. apply 1 coat pnmedsealer and 2 coats I 1.2 latex (water based) paint SM 3000 2.00 6000 Prepare wall or ceiling surface. apply I 1 coat primer/sealer and 2 coats oil
4.3
based paint SM 0
Demolish unsound walls /ceilings
4.4
and dispose of all debris SM 0 Build new masonry well with
4.5
meter/plaster finish SM 64 20.00 1260 Remove damaged ceramic tile wall I .
4.6
4.7
covering and install new ties Other (Describe in the space below.
Use Sid Item 10 if necessary) SM Indcate Unit of Measure Below FM in well openings SM MA Install suspended ceiling 0 ROMOve Suspended ceitng SM 6 . ROOF SYSTEM ITEM DESCRIPTION UNIT OF MEASURE QUANTITY UNIT PRICE US) 0 o ft ITEM COST (S US)
5.1 Reseal joints around roof tiles SM Replace and seal damaged or
5.2
missing roof ales SM 0
— •
Repair parapet walla fascia, or
5.3
*ayes
5.4 Install new steel red panels SM o
-I-
5.5
Clear roof drain and dmirspout Each 32 30.00 650
5.6 Install new root drain Each
5.7 Install new downspout Each 0
5.8 Other (Deserbe in the space below.
Indicate Unit of
UBS Bid Item 10 if necessary) Meas/re Below UNIT OF MEASURE QUANTITY UNIT PRICE US) o (5 MI GOV a WS 6 . DOORS & WINDOWS ITEM DESCRIPTION SIZE Install new wooden hollow-cons door
6.1
(speCify siat _21__ Each 0 Install new wooden door frame 62_ (specify size) ,_
--- —
6.3
Install new steel door (specify an) Each 98 60.00 7640 Steel double &kw Each 0
6.4
High security steel bars Each 98 60.00 7840 install new steel door frame (specify el.T.e) Each 98 20.00 1560 Sleet double door frame Each
6.5
Install new deedbolt lock and furnish Silts of keys Each 0 Lock eat for high security steal bars door Each o
•
CPA CONTRUCT1ON PROJECT BID SHEET
•
BB
Paint existing door (1 coal primer iv 2 coats oil paint) ._ SM Install other type of door (speedy Each size and Ire in blca_ 0
--,
6.7
6.8
6.9
(Bathroom stall dm Lath 0
'Remove broken window Oess and 'replace with new glass in westing L imns SM 0 _ 'PreParli rot* 0 P4 Ifin9 in wall 81 18 install new window frame and glass (Specify size In bid) Each 240 85.00 15600 ROTS oj L i y l Each 0 Install steel sec:Laity bars (burglar bars) on window Lath High security sleet bars Each 240 65.00 2240 810 Clean westing windows SM
6.11 Paint eAg n window frames - I 6.12 Other (Describe in the space below.
Use Bid Pam 10 if necessary) EA Indicate Unit of Measure Below UNIT OF T • ELECTRICAL SYSTEMS ITEM DESCRIPTION LMEASURE Install new surface-mounted electrical wiring (acetify wire type IL
7.1
diametel) LM
QUANTITY
UNIT PRICE (8
UM
0
ITEM COST
a MB
72
Install new electrical outlet Each 24 12.00 288
7.3
Install new well switch Each
7.4 Install new flourescent light fixture Each 112 20.00 224 i nig_ tall htlitits Eta% 0 _ _
7.5
7.8
_I 7,7
_
7.8
7.9
7.10
7.11
------- —L
7.12
I 7.13
Install new ceiling fan
Lath 72 200.00 14400
Install new telephone cable (single pair) Each 8 10.00 80 Install new te/sphone jeth an/or minim jack Each 0 _ _. _ _ Install new circuit breaker (specify __Itype and capacityi Lath 4 300.00 1200 Install new arcuit breaker panel (specify number of breakers and capacity) EarN 4 700.00 2800 Install new isolation switch (specify type and cApec)y) Lath 0 — Install Install new mains transformer ImeciA l)r .
and capacity)
' Each 0
Install new mains cabling (specify .... pelindArzeL_
1.91 0
Install new electrical generator with changeover switch (specify make, mode( ono cffacity) Lath 0 Install new fuel tank for generator (with capacity to operate generator I_ 7.15 I I
7.16
Install new curlew security lighting (specify s ty ri) d size on buildings Each 0 Install new exterior security lighting 499181T ITINI and 1140 on perimeter wall Each 0 Other (Describe in the apace below.
Use Bid Item 10 if necessary) Indicate Unit of Measure Below UNIT OF UNIT PRICE (S 8 • MECHANICAL SYSTEMS REM DESCRIPTION SE MEASURE QUANTITY US) Install new window air conditioning
8.1
unitispecAr nurther of watts/anipeL Each .
.
_ _ _ _
_
_ _ _
- t .
InstaN new split air conditioning unit 82 (pecity number of tons) EarN 0 ITEM COST (S US)
9. _
0
8.3 Install now ilodlaust fan and ductwork LAI • 0
•
CPA CONTRUCTION PROJECT BID SHEET
•
8.4 Instal new eir supply ductwork
8.5 'Install new,, exhaust ducemork i LM 0
8.6 Other (Deilaibe in the space below.
Indicate Unit ci
Use Bid earn 101 necessary) Measure Bakier 9 • SANITARY & WATER SYSTEMS flEM DESCRIPTION UNIT Of MEASURE QUANTITY UNIT PRICE (9 US) 0 ITEIN COST (S US)
9.1 Instal new Eastern style toilet Each 64 70.00 4460
9.2 !Instal new Western style told ' - - _
9.3 Test and clean sanitary drain pipes 0 Instal new san.tary drain pipes
9.4 (snooty diameter end type) LM Clean and repair °eating septic tanks (to include new todeing hatch
9.5
covers)
Install new septic tank (to ludo* 98 locking hatch covers) Each 0 I Remove Rusting septic tonics and linanhoies Each 0 Instal nevi porcelain sink with shut-
9.7
oft valves Eadi
9.8
•Instal new water piping (meaty size and i.e. PVC. stie _t_ne_ LM 0
9.9 Instal new main shut-01valve Each 0
9.10 Instal baddlcm prevention valve EaCh Each 911 instal new pliNgle water tanks - 150.00 1200
9.12 Other (Describe in the Space below.
Indicate Unit d
Use Bid Item 10 if necessary) Measure Below 1 , Instal shower 'ink Each Water pump Each 4 60 00 UNIT OF MEASURE FUNIT PRICE (t QUANTITY US) 240 'TEM COST (S US) 10 • OTHER BID ITEMS IT DESCRIPTION SIZE Provide armed secunty personnel 24 hours per day during the entire
10.1
duration of the contract DAYS 0 102 Replace icitawn table/shelf Each
10.3
0
10.4 0
10A 0
10.8 0
10.7 0
10.8 0
10.9 0
10.10 0
10.11 0
10.12 0
10.13 0
10.14 0
10.15
Estimated BID PRICE: 104712
•
CPA CONTRUCTION PROJECT BID SHEET
S
7 Mar 04
•
Senior Prisons Adviser
CPA(S)
Regional Co-ordinator cc
A/Head of Pillar
low
-- 1ead of Pillar
(on return)
BASRAH CENTRAL PRISON - FUNDING
I regret to report we were advised on 6 Mar 04 by Captri Department of Prisons Baghdad that the funding for the rebuild of Basrah Central Prison has lapsed.
Capital was allocated from 2003 budget and placed in Treasury, invitations to tender through CPA(S) December 03, February 04 contractors identified, however Capital had been returned to Ministry of Finance, original bids in USD need to be in ID, contractors requested to re-submit costings in ID — no response.
Local information is that the Minister of Justice has personally stopped the contract as prior approval had not been sought.
Current Position. CPA(S) has no capital for this project, we have to re-start the process through the Iraqi system and calculate this will add two months to the process.
•
•
•
Page 1 of 2
10161
CPT, Dept of Prisons
12me) CPT, Dept. of Prisons Wednesday, December 17, 2003 5:23 PM From:
Sent:
To:
Subject: FW: Prison Money in Basrah Tracking: Recipient Read b(e) BartJett, Joseph T. (SES) Armstrong, John J. (SES-05) Read: 12/17/2003 5:50 PM Below this message is text that may be useful regarding my earlier requests for information regarding Basrah.
Regards,
CPT r")
-----Original Message
From:
To: I, 401 Sent: Saturday, December 06, 2003 8:49 PM CPT, Dept. of Prisons Subject: RE: Prison Money in Basrah Apparently the FEST assessment has been completed on this project. The problem is, for MOJ funds to be activated, I think it has to go through the Iraqi system (i.e. Iraqi engineers, etc.) and not be tendered by CPA. Do you have a different view on this?
I think we could get around it with a special authorization. Either way will have to work fast and I would like to see the team review the project specifications, etc., since they know what a prison should look like.
Original Message
From: CPT, Dept. of Prisons Sent: Saturday, December 06, 2003 4:04 PM To: r- Cc: Bartlett, Joseph T. (SES)• Ryan, Charles L. (SES-05); Armstrong, John J. (SES-05);
") rb
Subject: RE: Prison Money in Basrah 101 Hello, The 2.2B ID equates to S1,515,677, based on the 1:1,500 rate. The $4.4M will have to come from capital as the PRB request was not accepted a few months ago. The advisory team did prioritize the project as one of the top three (the first two are really part of the same area and use up very little of the capital).
Given that over 34% of the project is in the capital budget there, I would suggest that the officer in charge proceed with the contract and even make a down-payment (20%, etc. as agreed).
Once I have the details requested in my previous email (contractor name, dates of project, etc.), I will request a transfer of the capital balance of ID 4,326,484,000, equivalent tc $2,884,323, into your treasury account. Given the balances and lack of fund draws, I do not believe MOF will allocate any more funds. My hope is that the contract will properly obligate and protect those funds so we do not need to dip into the already stretched budgets of 2004.
The prison advisors here in Baghdad are planning a trip to Basrah on 9 December, Tuesday. The intent is to visit Al Ma'aqil and the proposed Basrah Central site. I am
• 12/18/2003
. Page 2 of 2
hear that the facility is in decline as it was one of the premier operations when I visited
• sure that the team will make notes and directives pertaining to the conditions. I hate to with Mr.p earlier this year.
Thank you so much for the updated information.
Cheers,
NM
•
•
• 12/18/2003
CLASSIFICATION
TO: FROM: SUBJECT: OFFICE OF THE UNDER SECRETARY OF DEFENSE (COMPTROLLER)
OFFICE OF RECONSTRUCTION AND HUMANITARIAN ASSISTANCE
Funding Request ($ in Thousands) Project number: OR1-IA-PR-014 Short title: Repair of Prison: Basrah Central Date needed: ASAP ORHA org symbol: MIASA (Military Barracks) ' Quantity: Job Unit price:$4.400,000 Amount: $4,400,000 In budget (N) Request number: PR-014-2003 Requested by (natnei: tom Detailed description (including staffing requirements and basis for cost estimate): This request is to renovate the Military Barracks (to be named Basrah Central) and includes thirty-eight areas. l'he prison will house up to 1,200 inmates. $3.1 million will be required for construction. $0.9 million for start up costs, and $0.4 million for project management. The areas consist of three cell block wings, a female holding facility, a juvenile holding facility, segregation, kitchen, medical facility, administration facility, visitation area, exercise yard. guard facilities, and reception area. Attached are the detailed cost assessments of all work needed.
Indicate how much, if any, of these requested resources are required for civilian police functions:
or guard/security requirements .
Justification: (e.g., personnel safety. security, environmental protection)The Prison system is an integral part of the criminal justice system. At this juncture of the process, there are no functioning Prisons in operation in the southernmost region of Iraq. Focus has been on the central/Baghdad region resulting in a lack of attention to the need of outlying regions in Iraq. A detention center and a few temporary detention facilities have been provided by the military to hold looters and other detainees for short periods of time. This prison is urgently needed to provide and protect the integrity of persons detained while awaiting due process, and to provide a long-term prison facility to hold adjudicated inmates serving court imposed sentences of confinement as the judicial system is beginning to become fully functional. Safe and secure prison facilities are vital in order to protect Iraq's future interest in the effective and humane administration and accountability of the criminal justice system.
Impact if not funded:
Police will be unable to detain suspected individuals in an adequate, safe and humane correctional facility while processing investigations and evidence in accordance with the rule of law. There will be no pre-trial detention or holding area for those awaiting trials in the judicial courts. Once there are enough Detention Centers in place to hold all pre-trial detainees, this prison will become a post-trial prison in which convicted inmates will serve out the sentence of the courts.
. - ,
.
4-
Item Source:
ocal
Org Organic
Local
• xternal
ontract
S
Currency:
Reimbursable?
Name of Source:
Yes
o
Vest Vested assets
Seized assets
Sources Uses —
—,
Iraqi civil service
_
Iraqi special workers
Iraqi infrastructure
Item could be obtained
Coalition/Partn
State
CENTCOM
Justice
from or provided by:
Appropriated
funds
tion: ,--, Iraq Relief and Reconstruction Fund USA1D ARCENT Iraqi Freedom Fund — ____i Other:
Natural Resource Risk Remediation Fund Duplicate assets provided elsewhere in ORHA?
Overseas Humanitarian Disaster & Civic Aid Yes No Defense Cooperation Account (l yes, attach reason) _ — — — _ — ORHA Comptroller assessment: Other (specify):
This request has been approved by the ORHA Requirements Review Board. (Y/N)
• 08/31/03
1:52 PM
CLASSIFICATION ORHA FORM 7700 Page I of 4
CLASSIFICATION
Project number: ORHA-PR-014 Short title: Repair of Prison: Basrah Central Date needed: ASAP ORHA org symbol: MLASA (Military Barracks) Quantity: Job Unit price:$4,400,000 Amount: $4,400,000 In budget (N) ORHA Comptroller signature Date , ORHA MISSION (Billable category, select one) A. Overhead: ORHA Headquarters administration & management B. Repair of damage to oil facilities & related infrastructure (Natural Resources Risk Remediation Fund) Reconstruction and Humanitarian Aid Missions (Iraq Relief and Reconstruction Fund, PL 108-I I categories):
1. Water/sanitation infrastructure YES
2. Feeding and food distribution
3. Supporting relief efforts related to refugees, internally displaced persons, and vulnerable individuals, including assistance for families of innocent Iraqi civilians who suffer losses as a result of military operations
4. Electricity YES
5. Health care
6. Telecommunications
7. Economic and financial policy
8. Education
9. Transportation
10.Rule of law and governance (including police) YES
11.Humanitarian demining
12.Agriculture
13.Other Public Services
Additional information:
Memo Police
Function.
Security (Y/N)
. -a..! -- --,, ,r-r-..0. _4 )•-•,:. ...( , , ,-.• :-.• — ,...;,.
Item Apr May Jun Jul Aug Sep BY BY+I Total Salaries Travel/Transport Rent/Util/Maint Contracts Supplies/Equipm't Other Office symbol .
.
4.
_
Comments
tor attachment number)
CLASSIFICATION ORHA FORM 7700 Page 2 of 4
• 08/31/03
1:52 PM
•
CLASSIFICATION
Project number: ORHA-PR-014 Short title: Repair of Prison: Basrah Central (Military Barracks) Quantity: Job Date needed: ASAP ORHA org symbol: MLASA I Unit price:$4,400.000 Amount: $4,400,000 In budget (N) Decision/disposition Approved:
Disapproved: _ ____ _ _ _ _ _ Other:
Date:
•
•
•
• 08/31/03 CLASSIFICATION ORHA FORM 7700 Page 3 of 4 I:52 PM
• CLASSIFICATION
ORHA BUDGET REQUEST FORM
USER'S GUIDE
Request funding for ORHA mission and projects as follows:
1. All blocks must be completed. Add lines or attach pages as needed. Identify related projects, if any, in the detailed
2. 3. 4. description.
Each project must be identified to a specific ORHA Ministry or office. While several of the ORHA ministries relate directly to ORHA Missions identified in Public Law 108-11, the relationship is not as identifiable for other Ministries. In either case, each funding request should be carefully examined to determine assignment of the correct ORHA Mission code. To the extent possible, minimize use of Mission 13. Other Public Services.
For items included in the budget of record, the ORHA team will determine the approval process for requests equal to or less than $150,000 (exact).
Forward requests that meet the following descriptions to OUSD(C) for funding determination:
A. Increases that exceed $150,000 for projects included in the budget of record.
B. Unbudgeted miscellaneous expenses, in batches that exceed $150,000 total.
C. Requests that equal or exceed $500,000: Establish a project number and identify a definable objective.
Includes requests for seized assets or OMB funding.
Request value
Less than or equal to $150,000 $150,000 to $500,000 Over $500,000 IMNIARY Budgeted ORHA Comptroller approval Submit to OUSD(C) Unbudgeted Bundle to $500,000 total and submit to OUSD(C) Assign project code and submit to OUSD(C)
5. 6. For items that will not be funded by the Department of Defense or the Natural Resource Risk Remediation Fund, the OUSD(C) will forward the request to the OMB that will, in consultation with the ESG and the National Security Council, make the funding determination. This includes requests for use of seized Iraqi assets.
The ORHA Comptroller shall assign Project numbers sequentially within ORHA Missions (e.g., the first request for Water/sanitation infrastructure shall be 1-1; the second will be 1-2). Use standard object class codes to identify cost elements of the project.
A. Overhead, ORHA Headquarters Administration & Management requests will start with the letter A.
B. Requests for Repair of damage to oil facilities & related infrastructure will start with the letter B.
C. All other requests will start with their numeric designator, listed below:
Iraq
,
ORHA MISSION (Billable category, select one) A. Overhead: ORHA Headquarters administration & management B. Repair of damage to oil facilities & related infrastructure (Natural Resources Risk Remediation Fund) Relief and Reconstruction Fund (PL 108-11 categories):
I. Water/sanitation infrastructure YES
2. Feeding and food distribution
3. Supporting relief efforts related to refugees, internally displaced persons, and vulnerable individuals, including assistance for families of innocent Iraqi civilians who suffer losses as a result of military operations
4. Electricity YES
5. Health care
6. Telecommunications
7. Economic and financial policy
8. Education
9. Transportation
10.Rule of law and governance (including police) YES
11.Humanitarian demining
12.Agriculture
13.Other Public Services
Memo Pobce
Funniml.
Sec. ny (Y/N)
•
Page 4 of 4
•
•
•
COALITION PROVISIONAL AUTHORITY - SOUTH
PROJECT SUMMARY NUMBER:
A: KEY PROJECT DETAILS: BASRA CENTRAL PRISON
Al: PROJECT
SECTOR: CPA Southern Region PROJECT TITLE: Basra Central Prison PROJECT ACTION OFFICER: Maj !I*. 2IC 3 RMP (attached Law & Order Directorate CPA South) PLANNED START DATE: 15 Sep 03 URGENCY TO SECTOR:
(High, Routine, Low)
TINIF,FRAMF, REQVIRED: High EXPECTED DURATION: The site will be developed in phases over a 12 month period commencing Sep 03 12 months, with an Initial Operating Capacity achieved within 3 months (Dec 03) ESTIMATED TOTAL COST: $4.4m FUNDING SOURCE (PROPOSED): Ministry of Justice Prison Department A2: PROJECT LOCATION:
1. GOVERNORATE Mark 'x' as
2. AREA Mark 'a' 113
appropriate
appropriate
- BASRAH X -URBAN
- MISSAN -RURAL —
- MUTHANNA -MIXED 1 X
- THI QAR - NOT DEFINED
A3: THEMATIC MARKERS:
r
- Labour intensive (cash for work) X
- Labour intensive (food for work)
- Repair Parts intensive
- Government Capacity Building X
- Gender Issues X
Mark 'x' against all relevant categories B: IMPLEMENTING AGENCY DETAILS:
81: Name To be advised.
02: Contact Details Project Management Team to be appointed by CPA South, with support from the Law & Order Directorate CPA South and MP Branch HQ MND (SE).
Mark 'x' as appropriate:
And note any other relevant details X — UK Forces, on behalf of CPA B3: Type of Organisation: - Military - Govt. Dept. / State Enterprise
- United Nations Agency
- NGO
•
•
•
•
- National Commercial Company
- Foreign Commercial Company C: PROJECT RATIONALE AND PARTNERSHIPS; OUTCOMES; OUTPUTS; ACTIVITIES;
INPUTS AND BUDGET:
Cl: PROJECT RATIONALE:
Please provide clear statement of problem that the project is intended to address.
C2: PARTNERSHIPS:
Please indicate principal partners, if any, involved in project.
C3: TARGET GROUP:
Please indicate the most likely recipient of the goods &for services provides, C4: GENDER, CAPACITY BUILDING:
Indicate how these issues are addressed, if at all.
C5: SUSTAINABILITY:
Please indicate to what degree sustainabilitY issues have been considered.
Basra prison was completely looted and destroyed following the war and is considered no longer fit for purpose. An alternative site has been identified at a former Army barracks on the outskirts of Basra (Grid:
QU72207380). The site has been visited by the Ministry of Justice Prisons Department (Mr to I who confirmed that it is suitable for future development as a prison.
Initial work has been completed to secure the site, funded as a UK QIP and a detailed technical assessment has been conducted by CPA South FF,ST, with technical guidance provided by UK Military Provost Staff prisons advisors.
CPA Main has now endorsed the requirement to develop this site as a regional post-trial facility for approximately 1,000 medium to high security prisoners. The site will also accommodate the Regional Headquarters of the Iraqi Prison Service. It is possible that this site will also be used to accommodate Coalition Internees, transferred from temporary holding facilities at Camp Bucca and elsewhere in Iraq.
• Ministry of Justice Prisons Department
• Iraqi Prison Service (Lt Col Kareem Mahamed)
• Local Contractors (TBC)
• CPA South
• UK Military Police (Majr
• UK Military Provost Staff (Capt r ) All categories of inmates, which includes adult male, female and juvenile offenders. The site may also include Coalition Internees, transferred from current temporary holding facilities.
Planned capacity for approximately 1200 medium to high security prisoners:
• A & B Wing: 768 males
• C Wing: 360 males (possibly Internees)
• Juveniles: 84
• Adult Females: 42
• Segregation: 16 individual cells (male or female)
• 4 x medical wards, one of which will be for females/juveniles.
The operating costs for this facility will be included in the Ministry of Justice Prisons Department budget.
C6: PERFORMANCE MONITORING
PLANNED & ACCOUNTABILITY
CHECK:
Indicate steps being taken to monitor performance and assure process seen as fair and equitable.
C7: RISK ASSESSMENT:
Please provide a statement concluding the key risk factors to all participants.
Given the scale of this project, the Director of Reconstruction for CPA South has recommended that responsibility for the management of this project is assumed by a dedicated Project Management Team. Costs for this are calculated at 10% of the overall total (S0.4m).
The availability of secure custody facilities is central to the restoration of law and order structures within Iraq.
•
•
•
•
CS: OUTCOMES, OUTPUTS, INPUTS
& ACTIVITIES:
- Intended Outcomes:
- Intended Outputs: - Activities Planned:
- Inputs required - to achieve Activities / Outputs:
Please also indicatc numbers of local workforce to be involved in project; and whether skilled or not.
- Use of existing structures & facilities:
Please indicate where, what and whether agreement received.
C9: PROJECT BUDGET:
Usc available space (or attach) to detail the disbursement of funds. Consider labour.
material, equipment, transportation, communication, administrative & other costs. If a multi-agency project, state the OCPA-S % share of the contribution.
CIO: RATIONALE FOR SINGLE OR
MULIPLE SOURCE (CONTRACTING
BIDS)
Cl 1: BUDGET REVIEWED BY:
The construction of a medium to high security prison, housing approximately 1200 prisoners.
Prison buildings which provide adequate security and supporting infrastructure.
• Safe custody of all offenders.
• Provision of inmate recreation facilities.
• Facilities for inmate visitors.
• Local contractors for initial construction (skilled and unskilled).
• Local contract for catering (unskilled).
• Local contractor for maintenance (skilled and unskilled).
The site was previously used as a military barracks.
Approximate construction costs include:
Item Cost (USS)
Capital Works $3 lm
Start-up costs SO.9m
Project Management Team $0.4m TOTAL 54.4m
• Capital Works expenditure is based upon the CPA South FEST estimate ($3.1m). A copy of the FEST Assessment Report is enclosed.
• Start-up costs have been provided by CPA Main Prisons Department and are based upon the costs incurred to establish similar facilities in Baghdad (S0.9m).
• A total of $37.5k has already been expended to secure this site, funded as a UK Quick Impact Project.
• Monthly running costs have been calculated at $160k, based upon the running costs for similar sized facilities in Baghdad. CPA Main will include this figure in their budget submission.
• Monthly salaries should be calculated for 200 staff of the Iraqi Prison Service. CPA Main will also include this figure in their budget submission.
Contracting procedure advised by Director Reconstruction, CPA South will include competitive bidding from contractors together with and international or Iraqi project management team.
1
Major
2IC 3 RMP
•
COALITION PROVISIONAL AUTHORITY - SOUTH
BASRAH, IRAQ
U.S. Army Corps of Engineers Forward Engineering Support Team Title: WR#49 Basrah Central Prison Preliminary Assessment and Cost Estimate
• Requested by: Major
UK Project Manager
Date: 24 July 2003
Signature:
Submitted by:
Date: 19 August 2003
CPA-S FEST Assessor
Signature:
Approved by: Major"'
CPA-S FEST Team Leader
Date: 19 August 2003
Project Location: Basrah
On-Site Personnel: Not Applicable Grid Coordinates:QU 72396 73718 On-Site Security: Not Applicable
•
1
•
•
Prison Cost Estimate Summary Location Name Number of Buildings Total Square Meters Estimated Cost Cost per square meter Administration 1 167 $15,644 $93.68 Medical 1 374 . $27,235 $72.82 Reception 1 309 $20,588 $66.63 Staff and HQ 1 750 $43,496 $57.99 Visitors 1 376 $36,889 $98.11 Kitchen and Rec 1 575 $32,002 $55.66 Entrance Guard 2 50 $4,242 $84.84 Guam, House 1 28 $4,896 $175.48 Guard Towers 8 72 $40,360 $56.06 A-Wing & B-Wing 8 2496 $152,856 $61.24 C-Wing 3 996 $66,036 $66.30 A, B, & C Bathrooms 5 315 $43,345 $137.60 Female Holding 1 124 $17,663 $142.44 Juvenile Holding 1 194 $18,643 $96.10 Segregation 1 214 $30,055 $141.85 Generator 1 79 $7,139 $90.37 Yard & Security 1 32380 $1,979,423 $61.13 Electrical Requirements $500,000 TOTAL $3,040,812
•
C1øV665 4u9 Oa47t -5
Asceessa) em/ Aceezisr .70 Akr /vac/pe t 17
1- 393 Aicumeiseadber
•
•
CPA-SOUTHEAST FEST
TECHNICAL ASSESSMENT REPORT
Title: VVRSt 49 Basarh Central Pison Date: 30 July 2003 Time: 0830 Location: Basrah, Iraq Grid Coordinates: QU 72396 73718 Inspectors:
•
•
•
On-Site Personnel/Security: British hired security force Mission/Objective: The objective of this project is to complete a detailed engineering assessment, a cost estimate, and sufficient documentation to assist in the tendering process for the renovation of this former military barracks to a medium to high security prison. The Basrah Central Prison is intended to hold 1000 to 1500 prisoners.
Background/Description of Problem: The existing military compound consists of twenty nine (29) buildings and a perimeter security wall. The compound was used to train Fedayeen soldiers before the war. The compound contains approximately 32.400 square meters of area inside the perimeter walls.
During the war the buildings were extensively looted. All windows, doors, water tanks, plumbing fixtures, furniture, appliances, electrical wiring and equipment, almost anything else that could be removed was removed.
It appears that even the buried electric wires were removed. The entire metal roofing on one of the buildings was looted and part of the stone tile on another building was removed. Structurally the buildings are in very good condition with no war damage or fire damage.
Of the twenty nine (29) buildings fourteen (14) will be used to house the pnsoners, nine (9) additional wilt be specifically used for the prisoners, three (3) will be used by the guards, three (3) will be used by the staff, and one (1) to house the generator and electric transformer. Some of the courtyards will be used as recreational areas for the prisoners.
Typical renovation items for the buildings will include new doors, new windows, general wall repairs, painting, new electric service line and breaker panel, electrical outlets, phone service, individual room air conditioning units, ceiling fans, and window security bars. Typical renovation items for the high security buildings will include barred windows, barred doors, bulkhead lights, fans in steel cage enclosures, reduced window and door sizes, tile removal from the floors, and basic toilets in the prisoner rooms. Most of the buildings will require new roof water tanks and new plumbing. The compound will have a backup generator and will be connected to the water main need the street.
The perimeter wall is concrete and was raised to provide security until this project can be completed. The north perimeter presently is a common wall with some residential buildings. A second temporary perimeter wall was constructed until the issue with residential properties can be resolved. There is a security force at the compound that is also providing temporary security measures. This project will include constructing a new perimeter wall inside the existing wall to reinforce the existing. In addition to the perimeter wall there will be constructed 3 meter high security chain link fencing with security wile continuous along the top. This security fencing will subdivide the interior of the compound into different holding segments.
It is important that this prison compound be completed and ready to occupy as soon as possible.
2
1
•
•
•
•
Facts & Technical Details: The twenty nine building will be used as follows:
Location / Building
Designation
Number of
Buildings
Total Square
Meters
Administration 1 167
Medical 1 374
Reception 1 309
Staff and HQ 1 750
Visitor's 1 376
Kitchen and Recreation 1 575 Entrance Guard 2 50 Guard House 1 28 A-Wing & B-Wing 8 2496 C-Wing 3 996 A, B, & C Wing Bathrooms 5 315 Female Holding 1 124 Juvenile Holding 1 194 Segregation 1 214 Generator 1 79
-- f-OTAL 7047
In addition to these twenty nine (29) buildings eight (8) guard towers will be built for addition security. These guard towers will be located between the perimeter wall and Sterile Area fencing. The floor of these guard towers will be at a level of four (4) meters.
There are several septic/holding tanks and manholes through the compound. These tanks will be removed and replaced with new tanks, drain lines, and cleanouts. The location of the tanks and the cleanouts will be outside of the fenced in areas for the prisoners. These septic/holding tanks will require periodic cleaning from an outside firm.
Two (2) water tanks will be installed at the Generator/Transformer/Water Tank building that will be supplied with water from the water main near the street. These two tanks will then provide water to the rest of the smaller water tanks through the compound. Circulation of water will be through water pumps at the Generator/Transformer/Water Tank building and at each of the individual buildings. The water supply to each of the buildings bathrooms will be from individual water tanks on the buildings roof.
The electrical supply to the compound entered from the street on the east side. It entered near the Main Gate near the street entrance. The transformer was located in one of the two Entrance Guard Houses (WAS IT?? I AM NOT SURE.) and then went underground from that point to each of the buildings. The new underground electric cable will go directly to the Generator/Transformer/Water Tank Building and will go underground to each building from that point.
There is a limited amount of asphalt pavement within the compound perimeter walls. Portions of the asphalt pavement will require repairs and replacement. The only proposed new pavement is a section to the emergency (double doors) proposed in the Medical Building.
The buildings that will house the prisoners will require high security windows and doors. These windows and doors will be metal bars that will not allow the prisoners to stick an average hand through the grid openings. All windows, doors, and door frames will be metal with continuous weld fabrication. All attachment hardware will be tamper proof. All lights will be of the shatterproof bulkhead design. All rooms, that the prisoners will be in, will also have nightlights that cannot be adjusted or turned off by the prisoners. All fans will be enclosed in steel 3
cages that have a grill covering to prevent handholds, points of anchorage, or places for attaching ligatures. All floor tiles will be removed and the floor covered with a screed layer of concrete so that the tile cannot later be removed by the prisoners and used as a weapon See attached site plan drawings for compound layout
•
•
•
4
OBSERVATIONS
Reception Building
A. Description:
The building
It has a recta
fourteen (14)
the building is
a one story structure that is rectangular in shape; 26.5 m ± by 11 . 3 m ±.
gular protrusion on the west wall that is 4.7 m ± by 2.1 m ±. There are oms that vary from 5.9 m by 4 m to 2 m by 4 m. The total footprint of approximately 309 sq m
•
The building i
and wires, el
water tank w
where the stol
structurally in good condition. All the doors, windows, electrical fixtures ctrical panel. bathroom fixtures, roof downspouts and roof mounted re stolen. Minor damage was done to the walls, ceiling, and floors n items were removed. There are no rooms with fire damage.
The proposed usage of this building is a Reception Building. The rooms will be primarily used for offices. The building will require normal security measures.
B. Security Required
The Reception Building will require Normal Security Measures. The office doors will be solid wood with typical locking devices. All necessary electrical outlets will be located in thel individual office rooms and bathrooms. The ceiling fans and light fixtures will not be enclosed in cages. The windows will require typical security bars.
The electric panel(s) can be located in their former locations in the hallways. The exterior doors will be metal doors, single width. Double doors will not be required.
C Repairs and Modifications
• All doors and
doors will be
filled in. All
damaged tiles
all the rooms
include a mini
Phone servic
accommodate
be changed.
exterior entran
windows will be replaced, resized, or filled in The double width exterior placed with single width metal doors. The excess door widths will be ndows will have glass. All bathroom fixtures will be replaced and the replaced. Damage to the walls. floors, and ceiling will be repaired and nd hallways repainted. All electrical fixtures will be replaced and will um of one outlet in each room for each 3.7 meters of wall length.
will be provided in each room. The rooms will be modified to air conditioning units. Generally the existing layout of the rooms will not he roof downspouts will be replaced. Steps will be constructed at each e way.
D. Electrical Needs
•
Each office will have at least one electrical outlet for each 3.7 meters of wall length.
Each office roclm will have a minimum of two light fixtures, one ceiling fan, and an air conditioning unit. The larger rooms will have a minimum of three light fixtures and two electrical outlets. The bathrooms will have at least two light fixtures. The lighting in the hallway will be replaced and the electric panel(s) will be replaced in their former 5
•
•
•
•
location(s). All the rooms except the bathrooms will have air conditioning and phone service install d.
E. Plumbing Ne
There are two bathrooms; one shall be designated for men and one for women. Each bathroom she I have two toilets and two sinks. No showers will be installed in this building. A 00 liter water tank will be installed on the roof with the necessary plumbing to ach bathroom. The existing drain lines will be cleaned out from the building to the r destination and repaired or replaced as necessary.
F. Preliminary M terials and Repair List
1. 16 indows with typical security bars
2. 14 i tenor doors wood with locking sets
3. 3 e erior doors — metal with locking sets
4.
4 toilets
5.
4 si ks
6.
4 b hroom stall doors
7.
1 - 800 liter roof mounted water tank with plumbing
8.
40 li6ht fixtures9. 58 lectrical outlets
10. 14 ciling fans
11. 12 ar conditioners
12. 3 exterior steps/stairs
13. 14 g neral room repairs and painting
14. 1 el ctrical panel and all necessary breakers and wiring
15. 12 phone services(one in each office)
16. 10 downspouts
•
Staff and R ional
ead • uarters
A Description
The building
overlapped in
the total widt
building is ap
sq m. There
Sixteen (16) o
Is a two story structure whose shape represents two rectangles ne quadrant. The total length of the building is approximately 32 m and of the building is approximately 16.6 m. The total footprint of the oximately 375 sq. m. and the total square footage is approximately 750 re twenty two (22) rooms that vary from 5.9 m by 4 m to 1.8 m by 4 m.
the rooms have separate bathrooms.
• The building i
and wires. ele
and roof mou
ceiling, and fl
windows and
damage was
the electrical
is a stairway
were also loot d.
•
•
structurally in good condition. All the doors, windows, electrical fixtures rical panel, air conditioning units, bathroom fixtures, roof downspouts ted water tank were stolen. Minor damage was inflicted to the walls, ors, especially where the stolen items were removed. Where the doors were removed the frames were generally taken also and wall uch more intense. On the ground floor, the floor was damaged where ble was removed. There are no rooms with fire damage. On the roof closure. It originally had one window and one exterior door, but those The proposed usage of this building is the Staff and Regional Headquarters Building and the rooms on the ground floor will primarily be used for offices. The rooms on the second floor will be staff living quarters. The building will require normal security measures.
B. Security Required
The Staff and Regional Headquarters Building will require Normal Security Measures.
The office doors will be solid wood with typical locking devices. All necessary electrical outlets will be located in the individual office rooms and bathrooms The ceiling fans and light fixtures will not be enclosed in cages. The windows will require typical security bars. The electric panel(s) will be located in their former locations in the hallways. The exterior doors will be metal doors. single width. Double doors will not be required.
C Repairs and M dific-ations All the doors exterior doors entrance door the south side north side or windows are a the windows a reduced in siz floor will be approximately nd windows will be replaced, resized, or filled in . Two double width will be replaced with single width metal doors. There will be one n the west side toward the Medical Building and one entrance door on oward the Reception Building. There will be no entrance doors on the st sides of the building. The excess door widths will be filled in. The proximately 2.4 m wide by 1.2 m high except in the bathrooms where e approximately 1 m wide by 0.5 m high. The larger windows will be . All windows will have glass. The bathroom windows on the ground Iled in. The bathroom windows on the second floor will remain he same size. On the ground floor all rooms will be used for offices, 7
•
•
•
and all in-room bathrooms, including separating walls, will be removed and the space converted to office space. The one smaller room on the ground floor will be converted to a bathroom that will accommodate restroom facilities for both men and women. On the second floor all bathroom fixtures will be replaced and the damaged tiles replaced.
Damage to the walls, floors, and ceiling will be repaired and all the rooms and hallways repainted. Also on the second floor the smaller room will be converted to a bathroom with shower to accommodate both men and women. All electrical fixtures will be replac d and will include a minimum of one outlet for each 3.7 meters of wall length. Pho e service will be provided in each office room. The rooms will be modified to a commodate air conditioning units. Except for removing the bathrooms on the ground floor, the existing layout of the rooms will not significantly change. Both flights of inte ior steps will be repaired. Exterior steps will be constructed at each exterior entra ce way with the height determined by the differential grade. The windows in t e stairway enclosure on the roof will be filled in and the door will be replaced with metal exterior door. Any wall damage to this stairway enclosure will be repaired. All ownspouts will be replaced. The stairway enclosure on the roof will be repaired as n cessary. All nine (9) balcony doors will be exterior metal doors. The ground floor II have two (2) exterior entrances with exterior metal doors.
D. Electrical Nee
Each office wi
I have at least one electrical outlet for each 3.7 meters of wall length.
Each office r
111111
m will have as a minimum two light fixtures with one additional light fixture for eac 19 sq. m above 19 sq. m, one ceiling fan, and an air conditioning unit.
The bathroom
• will have all previous electrical outlets and lights replaced, except if they did not e ist before then all bathrooms will have least one electrical outlet and two light fixtures, he lighting in the hallway will be replaced and the electric panels will be replaced at th ir former locations. Where necessary wiring will be attached to and exposed on t e face of the walls. All rooms except the bathrooms will have an air conditioning unit and phone service installed.
E Plumbing Needs
There will be one bathroom on the ground floor. It will be located in the 1.8 m by 4 m room along th north wall. It will be used by both men and women. This bathroom will have two toilet and two sinks. No showers will be installed in this bathroom. On the second floor t e bathrooms in each on the 8 rooms will be restored. A separate bathroom will e established on the second floor in the small (1.8 m by 4 m) room on the north wall 41 irectly above the bathroom being established on the ground floor. This bathroom will have one toilet, one shower and one sink. This bathroom will be primarily avail ble for the two second floor rooms without bathrooms. Two 1000 liter water tanks 11 be installed on the roof with the necessary plumbing to each bathroom. T e existing drain lines will be cleaned out from the building to their destination an repaired or replaced as necessary.
F. Preliminary Ma erials and Repair List 1 42 windows with typical security bars
2. 30 interior doors — wood with locking sets 8
•
•
•
•
3. 1 exterior doors — metal with locking sets
4. 1 toilets
5. 1 sinks
6. 9 -howers
7. 4 athroom stall doors
8. 2 1000 liter roof mounted water tank with plumbing
9. 7 light fixtures
10. 5 electrical outlets
11. 2 ceiling fans
12. 21 air conditioners
13. 2 xterior steps/stairs
14. 3 general room repairs and painting
15. 1 electrical panel and all necessary breakers and wiring
16. 10 phone services in each office
17. 2 repair stairways
18. 2 install stairway handrails
19. 1 repair floor
20. 8 replace downspouts
21. 8 remove bathrooms on ground floor
22. 1 -emove door on east wall on second floor
23. 9 "ill in bathroom and stairway enclosure windows
•
Administration Building
•
A Description
The building
approximately
total square f
from 1.4 m by
a one story rectangular structure. The total length of the building is
18.3 m and the total width of the building is approximately 9 1 m The otage is approximately 167 sq. m. There are eight (8) rooms that vary
4.1 m to 8.7 m by 4 2 m. Three (3) of the existing rooms are bathrooms The building i4 structurally in good condition. All the doors. windows, electrical fixtures and wires. el ctrical panel, bathroom fixtures, roof downspouts and roof mounted water tank we .
e stolen. Minor to moderate damage was inflicted to the walls, ceiling, and floors, especially where the stolen items were removed. Where the windows and doors were removed the frames were generally taken also and wall damage was much more intense. In several of the rooms the floor was damaged where the tiles were removed. There are no rooms with fire damage. One of the bathrooms has only an exterior entrance: it cannot be accessed from inside the building.
The proposed1 usage of this building is the Administration Building and all the rooms will primarily b used for offices. The building will require normal security measures.
B Security Requ red
The Administr
tion Building will require Normal Security Measures. The interior office and bathroom doors will be solid wood with typical locking devices. All necessary electrical outl ts will be located in the individual office rooms and bathrooms. The ceiling fans a d light fixtures will be enclosed in cages. The windows will require typical securit bars. The electric panel(s) will be located in their former locations in the hallways.
The exterior doors will be metal doors, single width. Double doors will not be required at any location.
C Repairs and Modifications All the doors in the north w width doors.
in size from a
m high. The I
rooms will be
south wall will
adjacent room
the adjacent s
there will be t
the exterior en
d windows will be replaced, resized, or filled in. The two exterior doors II will be eliminated. The double width doors will be replaced with single
•he excess door widths will be filled in. The windows vary considerably proximately 2 m wide by 1.2 m high to approximately 0.5 m wide by 0.5 rger windows will be reduced in size. All windows will have glass. All sed for offices, except for the bathrooms. The small bathroom on the be eliminated, the wall removed, and the floor space merged with the The bathroom, that only has an exterior entrance, will be merged with all bathroom by removing the common wall and reconfigured so that o separate bathrooms, Access will be from the interior of the building:
rance will be eliminated.
hallways repainted. The damaged floor tiles will be replaced_ All electrical fixtures will
• Damage to the walls, floors, and ceiling will be repaired and all the rooms and be replaced and will include a minimum of one outlet for each 3.7 meters of wall length. Phone service will be provided in each office room. The rooms will be 10
•
•
•
•
I
modified to accommodate air conditioning units. Except for removing the one small bathroom and reconfiguring another bathroom, the existing layout of the rooms will not 1 significantly change. The roof downspouts will be replaced. Exterior steps will be constructed a each of the two exterior entrance way with the height being as needed to get from the after graded ground leveled to the sidewalk level. On the roof many of the roof tiles fave been removed. These roof tiles will be .replaced and the joints over the entire rooll sealed/resealed.
D. Electrical Nee i s i
Each office w II have at least one electrical outlet for each 3.7 meters of wall length.
Each office room will have at least two light fixtures and one additional light fixture for each 19 sq. rr above 19 sq. m, one ceiling fan, and an air conditioning unit. The bathrooms will have all previous electrical outlets and lights replaced, except if they did not exist before then all bathrooms will have least two electrical outlets and two light fixtures. The lectric panel will be replaced at its former location. Where necessary, wiring will be ttached to and exposed on the face of the walls. Each office will have phone service E. Plumbing Needs There will be w o bathrooms; one of the existing bathrooms will be removed. There will be separate bathrooms for men and women. These bathrooms shall have as a minimum two toilets and two sinks. No showers will be installed in either bathroom.
One 500 liter water tanks will be installed on the roof with the necessary plumbing to each bathroom. The existing drain lines will be cleaned out from the building to their destination and repaired or replaced as necessary.
F. Preliminary M4terials and Repair List
1. 1q windows with typical security bars
2. 7 nterior doors — wood with locking sets
3. 2 xterior doors — metal with locking sets
4. 4 toilets
5. 4 sinks
6. 4 athroom stall doors
7. 1 500 liter roof mounted water tank with plumbing
8. 21 light fixtures
9. 28 electrical outlets
10. 9 ceiling fans
11. 5 air conditioners
12. 2 exterior steps/stairs
13. 7 general room repairs and painting
14. 1 lectrical panel and all necessary breakers and wiring
15. 5 hone services in each room
16. 4 downspouts
17. re lace floor tiles
18. 2 move bathroom walls
19. 4 i stall bathroom partitions 11
•
20. 21. 4 remove bathroom drain openings 2 fiH in exterior door openings
22. r place roof tiles
•
•
•
S
•
•
•
Medical Building
A Description
The building i
the building is
24.4m. The
that vary from
a one story building with two rectangular sections. The total length of approximately 25.9 m and the total width of the building is approximately tal square footage is approximately 374 sq. m. There are six (6) rooms
1.6 m by 3.4 m to 11.9 m by 15.2 m. There is one (1 ) small bathroom.
The building is structurally in good condition. All the doors, windows, electrical fixtures and wires, electrical panel, bathroom fixtures, roof downspouts and roof mounted water tank were stolen. Minor to moderate damage was inflicted to the walls, ceiling.
and floors, especially where the stolen items were removed. Where the windows and doors were removed the frames were generally taken also and wall damage was much more intense. In several of the rooms the floor was damaged where the tiles were removed. There are no rooms that have fire damage.
The proposed usage of this building is the Medical Building and will be used for the treatment of emergency and minor medical problems. All significant medical problems will be transft.rred to area hospitals. The rooms will be used for wards, offices, treatment or st•rage. The building will require normal security measures.
B Security Requ red
The Medical
bathroom doo
outlets can be
will not be en
require typical
locations in th
double entry d
accommodate
uilding will require Normal Security Measures. The interior office and will be solid wood with typical locking devices. All necessary electrical located in the individual office rooms and bathrooms. The ceiling fans losed in cages. Regular light fixtures will be used. The windows will security bars. The electric panel(s) can be located in their former hallways. One exterior door will be a metal door, single width. A ors will be required on the east wall at the narrow connection section to mergency patients, gurneys, special equipment, etc.
C Repairs and M difications All the doors nd windows will be replaced, resized, or filled in. All doors will be replaced with ingle width doors except for one set of double doors. Where necessary the excess d
• II
r widths will be filled in. The windows vary considerably in size from approximately m wide by 1.1 m high to approximately 0.250 m high by 0.76 m wide.
The larger windows will be reduced in size. All windows will have glass. The majority of the rooms will be used for wards. The remainder will be used for treatment and I offices, except or the bathrooms.
Damage to the walls, floors, and ceiling will be repaired and all the rooms and hallways repairted The damaged floor tiles will be replaced. All electrical fixtures will be replaced and will include a minimum of one outlet for each 3.7 meters of wall length. Phone service will be provided in the offices, the treatment room, and at the nurses station only; there will be no phones in the wards. All rooms, except the bathrooms, will be modified to accommodate air conditioning units.
13
•
The large open area will be divided in half longitudinally to provide two (2) wards. In the east ward, of these two, an office approximately 3 m by 4.6 m will be constructed.
Immediately adjacent to the existing bathroom a second bathroom will be constructed.
Both bathrooms will be equipped with 2 sinks, a toilet; and one shower. Single interior wood doors 4iUl be installed at the entrance to the two smaller wards. A nurse's station/recepti n desk will be constructed in the open area that separates the wards.
•
Significant ch nges to the existing layout will include dividing the larger room into two wards, constructing a separate office room in the east part of the large ward, adding a small bathroom, and adding a nurse's station/reception desk near the main entrance.
The roof downspouts will be replaced. Exterior steps will be constructed at the east exterior entrance way with the height determined by the grade differential. At the west emergency entrance a ramp will be required with a 12 horizontal to 1 vertical slope.
D Electrical Needs
Each room wi I have at least one electrical outlet for each 3.7 meters of wall length.
The new offle room will have a minimum of three light fixtures and the medical treatment/stor ge room will have a minimum of four (4) light fixtures. The bathrooms will have all p evious electrical outlets and lights replaced, except if they did not exist before then all bathrooms will have least two electrical outlets and two light fixtures.
The electric p nel will be replaced at its former location. Where necessary, wiring will be attached to and exposed on the face of the walls. All wiring will be in metal conduit.
Each office anti the nurse's station will have phone service: there will be no phones in the wards. Ea h of the four ward areas will have eight lights. They will also have night lights and thre fans per room for the smaller rooms and four fans per room for the larger rooms.
• E Plumbing Ne
There will be
bathrooms sh
also be 2 sink
new office are
tanks will be i
office area.
destination an
o bathrooms; one separate bathroom for men and women. These II have as a minimum one toilet, two sinks, and a shower. There will installed in the medical treatment room and one sink installed in the . There will be no toilets in either of these rooms. One 500 liter water stalled on the roof with the necessary plumbing to each bathroom and he existing drain lines will be cleaned out from the building to their repaired or replaced as necessary.
F Preliminary Materials and Repair List
•
1 19 windows with typical security bars
2. 7 i terior doors — wood with locking sets
3. 2 xterior doors — metal with locking sets
4. 2 t ilets
5. 7 inks
6. 2 showers
7. 4 bathroom stall doors
8. 1 - 500 liter roof mounted water tank with plumbing 14
•
•
9. 49 light fixtures
10. 4 electrical outlets
11. 1 ceiling fans
12. 9 air conditioners
13. 1 exterior steps/stairs
14. 1 entrance ramp
15. 6 general room repairs and painting
16. 1 lectrical panel and all necessary breakers and wiring
17. 3 hone services in office, treatment room, and nurses station
18. r place floor tiles
19. 8 ownspouts
20. 1 ull height wall
21. 1 urses station/reception desk
22. 1 athroom
23. 1 ffice
•
•
15
•
•
Visitor's Center Building
A. Description:
The building i
rectangular a
trusses for th
m), on the s
large bathroo
and the total
approximately
m by 25.4 m t
a one story building with basically two rectangular sections. The large ea (12.6 m by 25.4 m) is one open area with high ceilings and steel roof support. The smaller attached rectangular section (4.4 m by 10.3 uth wall of the building, contains two rooms; one office area and one with showers. The total length of the building is approximately 25.6 m idth of the building is approximately 17 m. The total square footage is 376 sq. m. There are three (3) rooms that vary from approximately 12.6
4.4 m by 5.5 m.
The building i structurally in good condition. All the doors, windows, electrical fixtures and wires, el ctrical panel, bathroom fixtures, roof downspouts, roof mounted water tank, and met I roofing were stolen. Minor to moderate damage was inflicted to the walls, ceiling, nd floors, especially where the stolen items were removed. Where the windows and doors were removed the frames were generally taken also and wall damage was much more intense. In several of the rooms the floor was damaged where the tiled were removed. There are no rooms that have fire damage. The entire metal roofing was looted over the large open area. The steel roof trusses and purlins remain in place.
The proposed usage of this building is the Visitors Center Building and will be used for the controlled meeting of families with the inmates. It will house separate men and women bathrooms and an office area. The building will require normal security measures.
•
•
Security Required
The Visitor's
enter will require Normal Security Measures. The interior office and bathroom door will be solid wood with typical locking devices. All necessary electrical outlets can be ocated in the visitation area and in the individual office room. There will be no electrica outlets in either bathroom. The ceiling fans and light fixtures will not be enclosed ir cages. The windows will require typical security bars. The electric panel will be r moved from its location on the south wall and relocated to the interior of the office. Bo h exterior doors will be metal doors, single width. Double entry doors will not be required at any entrance.
C Repairs and M difications All the doors a d windows will be replaced. All doors will be replaced with single width doors with met I doors for the exterior doors and wood doors for the interior. Where necessary the xcess door widths will be filled in. The double door on the south wall will be eIiminatd completely and two exterior doors will be installed; one in the east wall (where the visitors will enter) and one in the west wall (where the inmates will enter). The windows vary considerably in size from approximately 2 m wide by 1 9 m high to approximately 0.5 m high by 0.5 m wide. The larger windows in the visitor's 16
•
area and the office will be reduced in size to a maximum size of 1 m by 1 m. All windows will t.ave glass and typical security bars Damage to t e walls, floors, and ceiling will be repaired and all the rooms and hallways repa nted. The damaged floor tiles will be replaced. All electrical fixtures will be replaced nd will include a minimum of one outlet for each 3.7 meters of wall length. Phon service will be provided in the office only; there will be no phones in the visitation area All rooms, except the bathrooms, will be modified to accommodate air conditioning nits. The wall height in the visitation area is approximately 6.7 m. A suspended c iling with insulation will be installed at approximately 3 m. The upper area will be a empty void and unused except for wiring.
The entire mdtal roofing was removed and only the steel trusses and purlins remain.
• The large bat
The roofing will be replaced along with the overhangs, fasciae, soffits, and rain gutters for men and a will have four an additional room will be divided into two separate bathrooms to provide a bathroom bathroom for women. The showers will be eliminated. Each bathroom oilets and four sinks. The existing bathroom door will be relocated and oor installed. Two small windows will be installed in the new bathroom.
The sidewalk along the east side of the building has settled and is sloping away from the building This entire length of sidewalk must be replaced so that it will not be a tripping hazard to visitors. Exterior steps will be constructed at both exterior entrance ways with the height determined by the grade differential.
D. Electrical Nee
meters of wall
• The visitation
bathrooms will
all bathrooms
the bathrooms
necessary, wi
exposed wirin
and air conditi
area and the office will have at least one electrical outlet for each 3.7 length. The office room will have a minimum of two light fixtures. The have all previous lights replaced. except if they did not exist before then ill have at least two light fixtures. There will be no electrical outlets in The electric panel will be relocated to the interior of the office. Where ng will be attached to and exposed on the face of the walls. All will be in metal conduit. All rooms except the bathrooms will have fans fling units.
E. Plumbing Nees
There will be
bathrooms sh
installed in eit
the necessary
o bathrooms; one separate bathroom for men and women. These II have as a minimum four toilets and four sinks No showers will be r bathroom. One 500 liter water tanks will be installed on the roof with lumbing to each bathroom. The existing drain lines will be cleaned out from the building to their destination and repaired or replaced as necessary.
F Preliminary Materials and Repair List
•
1 16 windows with typical security bars
2. 3 i terior doors — wood with locking sets
3. 2 )(tenor doors — metal with locking sets 17
•
•
•
•
4. 8 toilets
5. 8 sinks
6. 16 bathroom stall doors
7. 1 - 500 liter roof mounted water tank with plumbing
8. 21 light fixtures
9. 25 electrical outlets
10. 9 ceiling fans
11. 7 air conditioners
12. 2 exterior steps/stairs
13. 3 general room repairs and painting
14. 1 electrical panel and all necessary breakers and wiring
15. 1 phone service in office
16. replace floor tile
17. replace suspended ceiling
18. replace metal roofing, fascia, and soffits
19. 1 fill in exterior doors
20. 2 install new exterior doors
21. 1 replace sidewalk
22. 1 construct new bathroom walls
23. 4 replace downspouts
•
.
,
. .. • •• - - -• ....- • -sta< 1 .tn.t. — 18
•
•
•
•
Guard House
A Description
The building is a small one story rectangular building. The building is 6 m by 4.6 m and contains two rooms. The total square footage is approximately 27.9 sq. m. There are two (2) rooms that are about equal in size. The west room has three (3) open walls; the east room has one large door, one exterior window and two interior windows. The building is structurally in good condition. All the doors and windows were stolen. Minor damage was inflicted to the walls where the stolen items were removed. Neither room has fire damage.
This building is in a central location between the various holding centers and its proposed usage is a Guard House. It will be used by the guards as a meeting/assembly area for controlling inmate movement and for controlling the interior gates. This building will require normal security measures. One room has three open walls. These walls will be filled in to a height of 1 meter with openings left in two of the three walls. From this room the guards will be able to observe the activities in and around A-Wing, B-Wing, the Juvenile Holding Building, the Female Holding Building, the Segregation Holding Building, the Generator Building, the Kitchen and Recreation Hall. and the "Sally Port" gate. The second room will provide the guards with an area to store their equipment and personal belonging and with a toilet and sink.
B Security Required
The Guard House will require Normal Security Measures. There will be only one door installed in the Guard House. In the west room the upper portion will remain open for unobstructed observation of the activities in the prison, there will be no windows.
There will be two exterior exits from this room but there will be no doors on these exit openings. There will be one interior door leading into the east room. This will be a metal exterior door. Each of the three exterior walls of the east room will have a 1 m by 1 m window with glass and typical security bars. All necessary electrical outlets will be located in this room. There will be no electrical outlets in the west room. The ceiling fans and light fixtures will not be enclosed in cages. The electric panel will be located in the east room.
C Repairs and Modifications The large exterior door in the east room will be filled in completely. A door to this room will be installed in the wall between the two rooms. This will be a metal exterior door.
The existing window in the east room will be replaced with a 1 m by 1 m window and similar windows will be installed in each of the other two exterior walls. The existing floor has three troughs in it. These troughs will be filled in and overlaid with a screed layer of concrete to create a smooth floor surface all around. The three open walls in the west room will be filled in to a height of 1 meter. From that height up the walls will remain open and minor repairs will be made where necessary. Openings will be left in the north and south walls but no doors will be required. The troughs in the floor of this room will also be filled in to create a smooth floor surface. The two interior windows 19
•
•
•
•
will be filled in. A small bathroom with one toilet and one sink will be built in the east MOM D. Electrical Needs The east room will have three electrical outlets This room will have a minimum of two light fixtures. The new bathroom will have all one outlet and one light. The west room will have two lights connected to a common dimmer switch. There will a fan installed in the west room. The electric panel will be relocated to the east room. Where necessary, wiring will be attached to and exposed on the face of the walls. All exposed wiring will be in metal conduit. The east room will be equipped with a fan, an air conditioner, and phone service.
E. Plumbing Needs
There will be one small bathroom with a sink and a toilet. One 250 liter water tank will be installed on the roof with the necessary plumbing to the bathroom. All new drain lines will be required.
F. Preliminary Materials and Repair List 1 3 windows with typical security bars
2. 1 exterior doors — metal with locking sets
3. 1 interior bathroom door
4. 1 toilet
5. 1 sink
6. 1 - 250 liter roof mounted water tank with plumbing
7. 5 light fixtures
8. 3 electrical outlets
9. 2 ceiling fans
10. 1 air conditioning unit
11. 1 general room repairs and painting
12. 1 electrical panel and all necessary breakers and wiring
13. 1 phone service
14. 1 fill in exterior door
15. 3 partially fill in exterior walls
16. 1 install new door opening
17. 2 repair floors
18. 1 construct interior bathroom 20
I
•
•
Generator - Fuel Tank — Water Tank Building A. Description:
The building is a one story rectangular building. The building is 11.7 m by 6.7 m and contains three rooms. The total square footage is approximately 79 sq. m. The three
(3) rooms are about equal in size (approximately 3.9 m by 6.7 m). Each room has a
0.4 m by 2.4 m window opening near the top of the wall and an 2.6 m by 1.5 m door opening on the wall opposite the window.
This building will be used to house the Electric Generator, the water tanks, the electrical panels and transformers and the water pumps.
The building is structurally in good condition. All the door openings are toward the perimeter wall and all the doors are missing. Minor damage was inflicted to the walls.
None of the rooms have fire damage.
B Security Required
The Generator Building will require Normal Security Measures. The existing door openings are facing in the wrong direction and will be filled in. New openings will be constructed in the opposite wall. In the door openings will be installed metal exterior doors. The doors will be double doors to allow the installation and maintenance of the equipment. In one room will be installed the generator, in another the electrical panels and transformer, and in the third will be the water pump and necessary piping for the prison compound. The long windows just below the roof line will be filled in When the new door openings are cut they will be on the wrong wall. Similar sized opening will be installed on the opposite wall from the door in the generator bay to allow the heat to escape and to allow air circulation. This window will be open. There will be one interior door opening leading from the Generator room to the transformer room. This door will be a metal exterior door. There will be no interior doors to the room with the water pumps and piping. All three rooms will have new windows with glass and typical security bars in the exterior walls.
C. Repairs and Modifications All three (3) large exterior doors in the south wall will be filled in completely and three
(3) large doors will be installed in the north wall. These will be double exterior metal doors with lock sets. A single metal door will be installed in the wall between the generator room and the transformer room. The three 8 ft by 1.4 ft windows just below the roof line in the north wall will be filled it and one will be installed in the south wall in the room with the generator for air circulation and heat loss. One 1 m by 1 m window will be installed in the south wall of the transformer room and the water pump room and one 1 m by 1 m window will be installed in the east wall of the water pump room and one in the west wall of the generator room. These windows will have glass and typical security bars.
•
21
•
•
•
•
This building will have no bathrooms but there will be one utility sink in the east room with the water pumps and piping. The fuel tank for the generator will be located outside and next to the west wall.
It will be necessary to install an opening in the south wall of the west room for the generator exhaust. Entrance ramps will be installed at each door. Ramps will have six (6) horizontal to one (1) vertical slope D. Electrical Needs All three rooms will have a minimum of three outlets, three light fixtures, and three night lights. Each room will have two ceiling fans. The electric panel will be relocated to the transformer room. Where necessary. wiring will be attached to and exposed on the face of the walls. All exposed wiring will be in metal conduit. The transformer room will be equipped with phone service.
E Plumbing Needs
There will be no bathrooms in this building. There will be one utility sink in the water pump room. Two 1500 liter water tanks will be installed on the roof with all the necessary plumbing to connect to the water pump in the east room.
F Preliminary Materials and Repair List 1 4 windows with typical security bars
2. 3 exterior doors — metal with locking sets
3. 1 exterior metal door and door opening
4. 1 - sink
5. 2 - 1500 liter roof mounted water tanks with plumbing
6. 9 light fixtures
7. 9 electrical outlets
8. 6 ceiling fans
9. 3 general room repairs and painting
10. 1 electrical panel and all necessary breakers and wiring
11. 1 phone service
12. 3 relocate exterior doors
13. 3 fill in 3 vent openings
14. 1 install vent opening and exhaust opening 22
•
•
•
•
Kitchen and Recreation Hall Building A. Description:
The building is a one story rectangular building with two small rectangular protrusions on the east and west walls. The large rectangular area (14.6 m by 29.9 m) is an open area with high ceilings (wall height 6.7 m) and a concrete roof. This will be used as the recreational area. The smaller section attached to the south end of the recreation area has a lower ceiling and it contains the kitchen and bathrooms. The bathroom, which is 5.5 m by 3 m, only has one door which opens directly into the recreational area: there is no direct connection into the kitchen area. The kitchen area consists of three (3) rooms. One room is 14.6 m by 4.6 m, the second room is 8.5 m by 3 m, and the third room is 5.5 m by 3 m. The 5.5 m by 3 m room will be used for storage. The
14.6 m by 4.6 m and 8.5 m by 3 m rooms will be used for food preparation and for meal distribution. The total square footage is approximately 575 sq. m.
There are two (2) doors that go from the kitchen area into the recreational area. There are no exterior doors that lead directly from the recreational area. There are two (2) exterior doors from the kitchen area. The recreation area has various sized windows from 4.6 m by 3.2 m to 0.8 m by 0.7 m. The kitchen area also has various sized windows from 4.2 m by 1 m to 0.5 m by 0.5 m. This building has 32 window openings.
All electrical units and wiring were looted. All kitchen appliances were looted. A concrete shelf/table area in the kitchen has settled and will be removed and replaced The bathroom consists of 2 toilets and five (5) sinks. All bathroom fixtures were looted.
The building is structurally in good condition. The only structural deficiency is the concrete table area in the kitchen that has settled. All the doors, windows, electrical fixtures and wires, electrical panel, bathroom fixtures, roof downspouts and roof mounted water tank were stolen. Minor to moderate damage was inflicted to the walls and floors, especially where the stolen items were removed. There was a suspended ceiling in the recreational area, but it was completely destroyed. There are no rooms that have fire damage.
The proposed usage of part of this building is the Kitchen for the preparation of basic meals and the Recreational Hall to provide the inmates with an opportunity for exercise The building will require high security measures.
B Security Required
The Kitchen and Recreational Hall will require High Security Measures. All interior doors will be metal with typical locking devices. All electrical outlets will be removed from the Recreational Hall and all electrical outlets in the Kitchen Area will have locking devices that cover them. The kitchen area will be off limits to the general population of inmates. There will be no electrical outlets in the bathroom. Even though the ceilings in the Recreational Hall are high. the ceiling fans will be enclosed in cages and the light fixtures will be of a bulkhead type. All of the large windows will be reduced in size and several of the windows will be eliminated. The windows will 23
•
•
•
•
require high security bars and will be placed at a level with the bottom edge at 1.5 meter All electric panels and/or boxes will be located in the Kitchen area; there will be no electric panels in the Recreational area All doors will be metal doors, single width. All doors will have locking devices except the bathroom doors. Double entry doors will not be required at any entrance. There will no direct access into the kitchen area from the Recreational area. The existing doors will be removed. All attachment hardware, such as bolts and screws, will be tamper proof.
C. Repairs and Modifications All the doors and windows will be either be replaced, resized, or filled in. All doors that are replaced will be replaced with single width metal doors. Where necessary the excess door widths will be filled in. The two (2) doors into the kitchen area from the recreational area will be eliminated: there will be no direct access between the kitchen and the recreational area. Two (2) new doors will be installed in the east wall of the recreational building; one near the north end and one near the south end. The door to the bathroom will be relocated near the east wall so that the bathroom can be subdivided.
The windows in the recreational area vary considerably in size from approximately 4.6 m wide by 3.2 m high to approximately 0.8 m by 0.8 m wide. All the windows will be removed from the recreational area and replaced with 1 m by 1 m barred windows There will be two (2) windows evenly spaced between the building columns (12 windows per side) and there will be four (4) 1 m by 1 m windows on the north wall.
There will be no openings retained for air conditioning units.
The windows in the kitchen area vary considerably in size from approximately 4.2 m wide by 1 m high to approximately 0.5 m by 0.5 m wide. All the windows will be removed from the kitchen area and replaced with 1 m by 1 m barred windows. There will be two (2) windows evenly spaced in the east and west walls and there will be four
(4) 1 m by 1 m windows on the south wall. There will be no openings retained for air conditioning units.
The remnants of the suspended ceiling will be removed and not replaced in the recreational area. This area will be used for exercise activities which may include such sports as basketball or volleyball.
Damage to the walls, floors, and ceiling will be repaired and all the rooms repainted.
The damaged floor tiles in the kitchen will be replaced. All the floor tiles in the recreational area will be removed and the floor covered with a screed layer of concrete. In the kitchen area all electrical light fixtures will be replaced and will include a minimum of one outlet for each 3.7 meters of wall length. Phone service will be provided in the kitchen only; there will be no phones in the recreation area.
The bathroom will be divided into two separate bathrooms to provide a bathroom for the kitchen area and one for the recreation area. The bathroom for the recreational area will have three toilets and three sinks. The bathroom for the kitchen area will 24
•
•
•
•
have two toilets and two sinks. Splitting the existing bathroom will require building a solid wall full height and rebuilding partitions within the bathroom areas. A door will be installed from the kitchen area and the door from the recreational area may have to be relocated. There will be no windows in the new kitchen bathroom because of its interior location. The tile flooring in the recreational bathroom will be removed an a screed layer of concrete placed on the floor Exterior steps will be constructed at both exterior entrance ways with the height being as needed by the grade differential. All downspouts will be replaced D Electrical Needs The recreation area will have no electrical outlets or electrical panels. Lights. night lights, and ceiling fans will be installed near the roof to protect them from recreational activities. The lights will be the bulkhead type and the fans will be in metal cage enclosures. The kitchen area will have a minimum of twelve light fixtures and seven ceiling fans. The recreation area will have 20 bulkhead type lights and 14 fans. Wiring in the kitchen area will include a minimum of one outlet for each 3.7 meters of wall length. Phone service will be provided in the kitchen only; there will be no phones in the recreation area. The bathrooms will have all previous lights replaced. except if they did not exist before, then the bathroom will have at least three light fixtures. In both bathrooms the light fixtures will be a bulkhead type. There will be no electrical outlets in either bathroom. The electric panel will be relocated to a secure location in the kitchen area within a locking enclosure. Where necessary, wiring will be chased in the walls with ducts.
E Plumbing Needs
There will be two bathrooms; one separate bathrooms for the recreational area and one for the kitchen area. The recreational bathrooms will have a minimum of three toilets and three sinks: the kitchen bathroom will have a minimum of two toilets and two sinks. No showers will be installed in either bathroom. The kitchen area will have a minimum of two restaurant size sinks. One 500 liter water tanks will be installed on the roof with the necessary plumbing to each bathroom and the kitchen sinks. The existing drain lines will be cleaned out from the building to their destination and repaired or replaced as necessary.
F Preliminary Material List 1 39 windows with high security bars
2. 5 interior doors — metal with locking sets
3. 3 exterior doors — metal with locking sets
4. 5 toilets
5. 5 sinks
6. 5 bathroom stall doors
7. 1 - 500 liter roof mounted water tank with plumbing
8. 38 light fixtures and nightlights
9. 20 electrical outlets
10. 21 ceiling fans
25
•
11. 3 exterior steps/stairs
12. 5 general room repairs and painting
13. 1 electrical panel and all necessary breakers and wiring
14. 1 phone service in kitchen office
15. 1 replace kitchen concrete table/shelf
16. 3 fill in door openings
17. 4 install new doors and openings
18. 1 remove suspended ceiling in recreation area
19. 2 remove floor tile and replace with concrete
20. 1 subdivide bathroom
21. 6 replace downspouts
•
•
•
26
•
•
•
A - Wing and B — Wing Buildings A. Description:
A - Wing and B — Wing each consist of a cluster of four (4) identical one story buildings. Each of the eight (8) buildings is rectangular 19.5 m long by 12.2 m wide and have a smaller rectangular entrance way that is 9.1 m wide by 2.1 m deep. There are two (2) large open areas in the 19.5 m by 12.2 m section that will be used as men's wards. The entrance way consists of two foyer areas approximately 2.7 m by
2.1 RI Between the two foyers is a 3.8 m by 2.1 m room. This room will be used as the guard station. There were no bathrooms in any of the eight buildings. The total square footage of each building is approximately 312 sq. m.
Each of the eight buildings is structurally in good condition. There were no structural deficiencies noted anywhere. All the doors, windows, electrical fixtures and wires, electrical panel, roof downspouts and roof mounted water tank (if there were any) were stolen. Minor damage was inflicted to the walls and floors, especially where the stolen items were removed. There are no rooms that have fire damage.
Each of the large open areas has one door that exits into one of the two foyer areas.
This door is 1.8 m high by 1.3 m wide. From the foyer to the exterior is a second door opening that is identical in size. This door arrangement is typical for both ward areas of all eight buildings. In the long exterior walls there are twelve (12) 0.5 m by 1.2 m window openings and four (4) 0.24 m by 0.24 m vent openings near the ceiling level.
In the short rear wall there is one 1.8 m wide by 1.3 m high window opening in the center of the wall. This arrangement of windows is typical for both wards in each building and typical for all eight buildings. The floors have tiles on them. The two foyers in each building and in all eight buildings are identical in size and consist of an open area with a 1.8 m by 1.3 m door opening in and a 1.8 m by 1.3 m door opening out. One foyer area in each building also has a door opening into the guard room.
This door opening is 2.1 m by 0.8 m. There are no windows in the foyer areas. The guard room has the one entrance door, one large window, and one vent opening. The window size is 1.8 m by 1.3 m and is located in the front wall. The vent opening is just above the window and is 0.24 m by 0.24 m. There are no windows openings into the ward areas. The electric panel for each building was located in the foyer, without the door to the guard room.
The proposed usage of part of this building is house male inmates. Each ward area will have 24 bunk beds for housing 48 inmates. Each building will require high security measures B Security Required Each of the eight buildings in A — Wing and B — Wing will require High Security Measures. All interior doors will be metal bars with sliding dead bolt and clasp locking devices with padlocks. All doors will open outward and will have the potential for swinging 180 degrees. All windows will be reduced in size and will be covered with bars in a grid patterns. The grid openings will not be large enough to allow an average hand to pass through. The windows will be placed at a level with the bottom edge at 27
•
•
•
•
1.5 meters. No electrical outlets will be installed in the ward areas. All ceiling fans will be enclosed in cages. All lights will be the bulkhead type. All electrical outlets and electric panels and/or boxes will be located inside the guard room. The fan and lights in the guard room will not require enclosures. All attachment hardware, such as bolts and screws, will be tamper proof.
The door to the guard room will be metal exterior doors, single width. All doors will have locking devices. Double entry doors will not be required at any entrance C Repairs and Modifications All the doors and windows will be replaced. resized or partially filled in. All doors will be replaced with either high security doors with bars or single width metal exterior doors. Where necessary the excess door widths will be filled in. Both door openings in each of the foyers will receive high security doors with the bars and sliding bolt locking devices. The one door into the guard room will be removed and replaced with a high security barred window. A new door will be installed in the front wall in place of the existing window: it will be a metal exterior door with dead bolt lock set. There will be a total of five (5) doors installed in each building.
The windows in the ward areas will be replaced with smaller sized high security bar windows. The maximum size will be 0.5 m by 0.6 m. The vent openings will be covered with high security bar windows. The size will match the existing. The large opening in the rear wall will be replaced with two (2) 0.5 m by 0.6 m high security bar windows. These windows will be evenly spaced. The large window in the guard room will be replaced with one exterior metal door. The existing door will be replaced with a high security barred window. A second high security barred window will be installed in the common wall with the other foyer. These will be high security 1 m by 1 m windows.
All fans will be placed in steel cage enclosures, except in the guard room. All lights will be of the bulkhead type In each ward two toilets and two sinks will be installed. Privacy will be provided through the construction of 1 meter high partitions. These toilets will be located side by side and on exterior walls.
All tiles on the floors will be removed and replaced with a screed layer of concrete.
Exterior steps will be constructed at the exterior entrance ways with the height being determined by the grade differential.
D. Electrical Needs
The ward areas will have no electrical outlets or electrical panels. Lights, night lights, and ceiling fans will be installed on and close to the ceiling. The fans will be in metal cage enclosures that will protect them from vandalism. The lights will be of the bulkhead type. All rooms will have night lights. The cages will be constructed so that they cannot be used as handhold or anchorage points. There will be no air conditioners in any of the buildings. Wiring in the guard area will include a minimum of 28
•
•
•
•
one outlet for each 3.7 meters of wall length or 3 per room. Phone service will be provided in the guard room only; the purpose of these phones is to remain in contact with the rest of the prison security. Where necessary, wiring will be chased in the wall with ducts.
E. Plumbing Needs
There will be two toilets and two sinks in each ward. There will be 1 meter high partitions around the toilets for privacy. There will be no toilet facilities in the guard rooms. One 250 liter water tank will be installed on the roof with the necessary plumbing to the toilets and sinks.
F. Preliminary Materials and Repair List
1. 240 windows with high security bars
2. 8 exterior doors — metal with locking sets
3. 32 exterior security doors — metal with locking sets
4. 32 toilets
5. 32 sinks
6. 32 toilet privacy walls
7. 8 - 500 liter roof mounted water tank with plumbing
8. 112 light fixtures and nightlights
9. 24 electrical outlets
10. 72 ceiling fans
11. 8 exterior steps/stairs
12. 24 general room repairs and painting
13. 8 electrical panel and all necessary breakers and wiring
14. 8 phone service in guard room
15. 16 remove floor tiles from rooms and replace with concrete
16. 32 replace downspouts
29
•
•
•
•
C - Wing Buildings
A Description.
The C - Wing Buildings consist of a cluster of three (3) identical one story buildings.
Each of the three (3) buildings is basically "C" shaped with straight sides 32.3 m long by 12.8 m wide and have a rectangular area 15.7 m by 5 m removed from the courtyard side. Each building consists of six (6) rooms and a long hallway. There are three exterior doors in each building: one at each end of the hallway and one into the central courtyard. There were no bathrooms in any of the three buildings. The total square footage of each building is approximately 332 sq. m.
Each of the three buildings is structurally in good condition. There were no structural deficiencies noted anywhere. All the doors, windows, electrical fixtures and wires, electrical panel, roof downspouts and roof mounted water tank (if there were any) were stolen. Minor damage was inflicted to the walls and floors, especially where the stolen items were removed. There are no rooms that have fire damage.
Each of the rooms has one door that exits into one of the hallway. These doors are 2 m high by 1 m wide. From the hallway to the exterior are three door openings that is identical in size; they are 2.1 m high by 2 m wide. This door arrangement is typical for all three buildings. There are fifteen window openings in each building. All the windows are 2 m by 1.2 m. Each room has two windows and there are three windows from the hallway to the exterior. This arrangement of windows is typical for all three buildings buildings. The floors have tiles on them. The electric panel for each building was located in the hallway adjacent to the door leading to the courtyard The proposed usage of part of this building is house male inmates. Each ward area will have 10 bunk beds for housing 20 inmates. Each building will require high security measures B Security Required Each of the three buildings in C — Wing requires High Security Measures. All interior doors will be metal bars with sliding dead bolt and clasp locking devices with padlocks.
All doors will open outward and will swing 180 degrees. All windows will be reduced in size and will be covered with bars in a grid patterns. The grid openings will not be large enough to allow an average hand to pass through. The windows will be placed at a level with the bottom edge at 1.5 meters. No electrical outlets will be installed in any of the rooms. All ceiling fans will be enclosed in cages. All lights will of the bulkhead type. All electrical outlets and electric panels and/or boxes will be located in an area controlled by the guards. Two of the exterior doors will be removed and the only exterior door will be into the courtyard. All attachment hardware, such as bolts and screws, will be tamper proof.
C. Repairs and Modifications All the doors and windows will be replaced. resized, partially filled in, or totally removed. All doors will be replaced with high security doors with bars, dead bolts.
30
S
•
•
•
locking clasps, and padlocks. Where necessary the excess door widths will be filled in. Both doors at the ends of the hallway will be filled; only the exterior door to the courtyard will remain in use. Each room will also have the high security doors with bars, dead bolts, locking clasps, and dead bolts. All doors will swing outward and have the potential to travel 180 degrees. There will be seven (7) doors installed at each building.
All windows will be replaced with smaller sized high security bar windows. The maximum size will be 0.5 m by 0.6 m and will be installed with to bottom edge at a level of 1.5 meters above the floor.
All fans will be placed in steel cage enclosures. All lights will of the bulkhead type. All rooms will have night lights.
In each room one toilet and one sink will be installed. Privacy will be provided through the construction of 1 meter high partitions. These toilets will be located on the exterior wall.
D. Electrical Needs
The rooms will have no electrical outlets or electrical panels Lights, night lights, and ceiling fans will be installed on and close to the ceiling. There will be 2 fans and 3 lights per room. The fans will be in metal cage enclosures that will protect them from vandalism. The cages will be constructed so that they cannot be used as handhold or anchorage points. The lights enclosures will be bulkhead type. There will be no air conditioners in any of the buildings.
***QUESTION Where are the guards going to be?**** Wiring in the guard area will include a minimum of one outlet for each 3.7 meters of wall length. Phone service will be provided in the guard room only; the purpose of these phones is to remain in contact with the rest of the prison security. Where necessary, wiring will be chased in the wall in ducts.
E Plumbing Needs
There will be one toilet and one sink in each room. There will be 1 meter high partitions around the toilet for privacy. One 250 liter water tank will be installed on the roof with the necessary plumbing to the toilet and sink.
F. Preliminary Materials and Repair List 1 45 windows with high security bars
2. 18 interior security doors — metal bars with locking sets
3. 3 exterior security doors — metal bars with locking sets
4. 18 toilets
5. 18 sinks
6. 18 toilet privacy walls
7. 3 - 250 liter roof mounted water tank with plumbing 31
•
8. 54 light fixtures and nightlights
9. 9 electrical outlets
10. 36 ceiling fans
11. 18 general room repairs and painting
12. 3 electrical panel and all necessary breakers and wiring
13. 3 phone service in guard room
14. 18 remove floor tiles from rooms and replace with concrete
15. 6 fill in exterior door openings
16. 9 replace downspouts
•
•
•
32
•
•
•
Bathroom Buildings for A — Wing, B — Wing, and C — Wing A Description The Bathroom Buildings for the three wings are identical. There are a total of five buildings; two in A - Wing, two in B — Wing and one in C - Wing. Each building is 8.1 m long by 7.8 m wide. The total square footage of each building is approximately 63 sq. m. The buildings contain 10 toilets and 2 sinks. There is a full height wall down the middle of the building and there are five partial height partitions on each side of the wall. There is one exterior door which is 2 m by 1.3 m. There are four windows and 10 vent openings. Two windows are 1 m by 1.3 m and two windows are 0 5 m by 0.9 m. The vents are 0.5 m by 0 5 m. There is tile on the floors Each of the five buildings is structurally in good condition. There were no structural deficiencies noted anywhere. All the doors, windows, electrical fixtures and wires.
electrical panel, bathroom fixtures, roof downspouts and roof mounted water tanks were stolen. Minor damage was inflicted to the walls and floors, especially where the stolen items were removed. None of the five buildings have fire damage.
The proposed use of these buildings is restroom and shower facilities. Each building will require high security measures.
B Security Required
Each of the five bathroom and shower facilities will require High Security Measures.
All windows will be reduced in size and will be covered with bars in a grid patterns.
The grid openings will not be large enough to allow an average hand to pass through.
The windows will be placed at a level with the bottom edge at 1.5 meters. No electrical outlets will be installed in any of the bathrooms. All light fixtures will be a bulkhead type design. There will be no ceiling fans. All light switches will be in locking enclosures controlled by the guards. The exterior door will remain open. All attachment hardware such as bolts and screws, will be tamper proof.
C. Repairs and Modifications All the windows will be replaced. Where necessary the excess window openings will be filled. The one exterior door will remain open. All windows will be replaced with smaller sized high security bar windows. The maximum size will be 0.5 m by 0.5 m and will be installed with to bottom edge at a level of 1.5 m above the floor.
All lights will be replaced with bulkhead type light fixtures.
The facilities in each bathroom will be changed from ten (10) toilets and two (2) sinks to four (4) toilets, six (6) showers and two (2) sinks. Partial height partitions will be relocated as necessary.
The tiles on the floor will be removed and replaced with a screed layer of concrete.
Exterior steps will be constructed at the entrance ways with the height determined by the grade differential.
33
•
D. Electrical Needs
The bathrooms will have no electrical outlets or electrical panels. Lights and night lights will be installed on and close to the ceiling in bulkhead type fixtures. There will be no fans or air conditioners in any of the bathrooms. All wiring will be chased in the wall in ducts.
E. Plumbing Needs
There will be four toilets, six showers, and two sinks in each building. One 1000 liter water tank will be installed on the roof with the necessary plumbing to the toilets.
showers. and sinks. The existing drain lines will be cleaned out from the building to
• F. Preliminary Materials and Repairs List their destination and repaired or replaced as necessary.
1. 42 windows with high security bars
2. 20 toilets
3. 10 sinks
4. 30 showers
5. 50 relocate bathroom partial height partitions
6. 50 bathroom stall doors
7. 5 - 1000 liter roof mounted water tank with plumbing
8. 30 light fixtures
9. 5 exterior steps/stairs
10. 10 general room repairs and painting
11. 5 electrical panel and all necessary breakers and wiring
12. 5 remove all floor tile from each bathroom and replace with concreter
13. 10 replace downspouts
•
•
34
•
•
•
•
Juvenile Holding Building
A. Description:
The Juvenile Holding Building is a "C" shaped one story building Basically the building consists of three rectangular sections connected near the ends. One rectangle is 15.7 m by 4.6 m, which forms the back side and the other two rectangles are 12.6 m by 4.6 m and are perpendicular to the backside. The total square footage of this building is approximately 194 sq. m. The building consists of nine (9) rooms.
Each room has one (1) exterior door and has two to four windows. Of the nine rooms one is a bathroom with two toilets and two sinks; there are no showers.
This building is structurally in good condition. There were no structural deficiencies noted anywhere. All the doors, windows, electrical fixtures and wires, electrical panel, bathroom fixtures, roof downspouts and roof mounted water tank were stolen. Minor to moderate damage was inflicted to the walls and floors, especially where the stolen items were removed. There are no rooms that have fire damage.
Each of the rooms has one door that exits into one of the courtyard. The doors are 2.1 m high by 1 m wide, except for the door to the bathroom which is 2.1 m high by 0.9 m wide. There are twenty seven windows which vary in size from 0.8 m by 0.54 m to 1 m by 1 m. The floors have/had tiles on them. The electric panel for the building was located in a wall on the courtyard side.
The proposed usage of part of this building is to house juvenile inmates. This building will require high security measures.
B Security Required
Each room in the Juvenile Holding Building will require High Security Measures All doors will be bars with sliding dead bolt and clasp locking devices with padlocks. All doors will open outward and will swing 180 degrees. All windows will be reduced in size and will be covered with bars in a grid patterns. The grid openings will not be large enough to allow an average hand to pass through. The windows will be placed at a level with the bottom edge at 1.5 meters. No electrical outlets will be installed in any of the rooms. All ceiling fans will be enclosed in cages. All lights will be bulkhead type fixtures. All rooms will have night lights. All electrical outlets and electric panels and/or boxes will be located in an area controlled by the guards. All attachment hardware, such as bolts and screws, will be tamper proof.
C Repairs and Modifications All the doors will be replaced. All doors will be replaced with high security doors with bars, dead bolts, locking clasps, and padlocks. Where necessary the excess door widths will be filled in. All doors will swing outward and have the potential to travel 180 degrees. There will be eight (8) doors installed at this building.
All windows will be replaced with smaller sized high security bar windows. The maximum size will be 0.5 m by 0 6 m and will be installed with the bottom edge at a 35
•
•
•
•
level of 1.5 meters above the floor. The second windows will be 0.5 m by 0.5 m in size. Five rooms will have two windows (one large and one small). The larger room will have four windows (two large and two small). The rooms on the side toward the Female Holding Building will only have one window (large). there will be no windows in the wall facing the Female Holding Building The bathroom will have two vent openings (small) on the side not facing the Female Holding Building. There will be aq total of 18 openings.
All fans will be placed in steel cage enclosures attached with tamper proof hardware.
All lights will be in bulkhead type fixtures.
All floor tiles will be removed and the floor will be covered with a layer of screed concrete.
In each room one toilet and one sink will be installed. Privacy will be provided through the construction of 1 meter high partitions. These toilets will be located on the exterior wall. The existing bathroom will be changed from two toilets and two sinks to one toilet, one sink, and two showers. The partial height partitions will have to be removed and rebuilt.
Exterior steps will be constructed at both entrance ways with the height being determined by the grade differential. There is a solid wall that partially encloses the courtyard for this building. Two openings will be cut in the wall near the rooms to allow the inmates to pass through. The existing single opening will be filled in.
D. Electrical Needs
The rooms will have no electrical outlets or electrical panels. Lights, night lights, and ceiling fans will be installed on and close to the ceiling. The fans will be in metal cage enclosures that will protect them from vandalism. The cages will be constructed so that they cannot be used as handhold or anchorage points. There will be no air conditioners in any of the buildings. Each room will have one fan except for the large room which will have two and the bathroom which will have none. All lights will use bulkhead type fixtures. There will be one light in each room except the larger room which will have two. There will be night lights in each room. Where necessary, wiring will be chased in the walls in ducts.
***QUESTION Where are the guards going to be?**** Wiring in the guard area will include a minimum of one outlet for each 3.7 meters of wall length. Phone service will be provided in the guard room only: the purpose of these phones is to remain in contact with the rest of the prison security.
E. Plumbing Needs
There will be one toilet and one sink in each room. There will be 1 meter high partitions around the toilet for privacy. In the separate bathroom there will be one sink, one toilet, and two showers installed. The partitions will be reinstalled for the new 36
•
•
•
•
configuration. One 500 liter water tank will be installed on the roof with the necessary plumbing to the toilets, sinks, and showers.
F. Preliminary Material List 1 18 windows with high security bars
2. 8 exterior security doors — metal bars with locking sets
3. 9 toilets
4. 9 sinks
5. 2 showers
6. 8 toilet privacy walls
7. 3 bathroom stall doors
8. 1 - 500 liter roof mounted water tank with plumbing
9. 10 light fixtures and nightlights
10. 3 electrical outlets
11. 9 ceiling fans
12. 2 exterior steps/stairs
13. 9 general room repairs and painting
14. 1 electrical panel and all necessary breakers and wiring
15. 1 phone service in guard room
16. 9 remove floor tile from rooms and replace with concrete
17. 2 cut openings in courtyard wall
18. 1 fill in opening in courtyard wall
19. 4 replace downspouts
• .
----4*'`.‘410*1100410111=1**''Plex,.
'7,1: 14410.
•
37
•
•
•
•
Female Holding Building
A Description
The Female Holding Building is a rectangular shaped one story building. It is basically
17.2 m long by 8.2 m wide. The total square footage of this building is approximately 124 sq. m. The building consists of four (4) rooms and a small entrance area. None of the four rooms have an exterior entrance; the entrance to all four rooms is through the small entrance area. The two rooms at the opposite ends of the building have two windows and an air conditioning opening, one of the interior rooms has one window and an air conditioning opening, and the bathroom has no windows. Of the four rooms one is a bathroom with toilets, sinks, and showers.
This building is structurally in good condition. There were no structural deficiencies noted anywhere. All the doors, windows, electrical fixtures and wires, electrical panel.
bathroom fixtures, roof downspouts and roof mounted water tank were stolen. Minor to moderate damage was inflicted to the walls and floors, especially where the stolen items were removed. The floors have/had tiles on them. The floor tile has been partially removed. There are no rooms that have fire damage.
The doors are 2.1 m high by 1 m wide, except the bathroom door which is 2.1 m high by 0.9 m wide. There are five windows, which are 2 m wide by 1.2 m high, and there are four openings for air conditioners, which are 0.8 m wide by 0.6 m high The electric panel for the building was located in the small entrance way.
The proposed usage of part of this building is to house female inmates. This building will require high security measures.
B. Security Required
Each room in the Female Holding Building will require High Security Measures. All doors will be solid metal with sliding dead bolt and clasp locking devices with padlocks Solid metal will be used in this building for privacy for the females. All doors will open outward and will swing 180 degrees. All windows will be reduced in size and will be covered with bars in a grid patterns. The grid openings will not be large enough to allow an average hand to pass through. The windows will be placed at a level with the bottom edge at 1.5 meter for privacy measures. In the north and south rooms there will be no windows in the walls toward the B-Wing Buildings. No electrical outlets will be installed in any of the rooms. All ceiling fans will be enclosed in cages. All lights will use bulkhead type fixtures. All rooms will have night lights. All electrical outlets and electric panels and/or boxes will be located in an area controlled by the guards All attachment hardware, such as bolts and screws, will be tamper proof.
C. Repairs and Modifications All interior doors will be replaced with high security solid metal doors with dead bolts, locking clasps, and padlocks. The exterior door will be the security door with bars and dead bolt, locking clasp, and padlock. Where necessary the excess door widths will 38
•
•
•
•
be filled in. All doors will swing outward and have the potential to travel 180 degrees There will be five (5) doors installed in this building.
All windows will be replaced with smaller sized high security bar windows. The maximum size will be 0.5 m by 0.6 m and will be installed with the bottom edge at a level of 1.5 meters above the floor. There will be two windows in the west wall in each room, except the bathroom. There will be five windows in the north and south walls, and there will be two windows in the east wall of the two end rooms on opposite ends of the building. Three 0.24 m by 0.24 m vent windows will be installed in the room with the bathroom and showers. These vent windows will be close to the ceiling and also covered with the security bars.
All fans will be placed in steel cage enclosures.
All floor tiles will be removed and the floor will be covered with a layer of screed concrete.
In each of the female wards two toilets and two sinks will be installed. Privacy will be provided through the construction of 1 meter high partitions. These toilets will be located on the exterior wall. The existing bathroom will be changed to include three toilet. four sinks, and four showers. The partial height partitions will have to be removed and rebuilt.
Exterior steps will be constructed at the entrance way with the height being determined by the grade differential D Electrical Needs The rooms will have no electrical outlets or electrical panels. Lights, night lights. and ceiling fans will be installed on and close to the ceiling. The fans will be in metal cage enclosures that will protect them from vandalism. The cages will be constructed so that they cannot be used as handhold or anchorage points. There will be no air conditioners in any of the buildings. Each room will have two fans except for the bathroom which will have none. Each room will have two lights including nightlights except the bathroom which will have three. Where necessary, wiring will be chased in the walls in ducts.
***QUESTION Where are the guards going to be?**** Wiring in the guard area will include a minimum of one outlet for each 3 7 meters of wall length. Phone service will be provided in the guard room only; the purpose of these phones is to remain in contact with the rest of the prison security.
E. Plumbing Needs
There will be two toilets and two sinks in each room. There will be 1 meter high partitions around the toilet for privacy. The separate bathroom will have three toilets.
four sinks, and four showers. One 500 liter water tank will be installed on the roof with the necessary plumbing to the toilets, sinks, and showers.
39
•
•
•
•
F. Preliminary Materials and Repair List
1. 23 windows with high security bars
2. 5 exterior security doors — metal bars with locking sets
3. 9 toilets
4. 10 sinks
5. 4 showers
6. 6 toilet privacy walls
7. 7 bathroom stall doors
8. 1 - 500 liter roof mounted water tank with plumbing
9. 10 light fixtures and nightlights
10. 3 electrical outlets
11. 8 ceiling fans
12. 1 exterior steps/stairs
13. 4 general room repairs and painting
14. 1 electrical panel and all necessary breakers and wiring
15. 1 phone service in guard room
16. 4 remove floor tile from rooms and replace with concrete
17. 1 rebuild bathroom partitions
18. 4 replace downspouts
.
..eit- ,04 r33
--
• z, 4
-1 • t , •
•
. • • • . •
'
40
S
•
•
•
Segregation Building
A Description
The Segregation Holding Building is a "C" shaped one story building. Basically the building consists of four rectangular sections connected at the ends. One rectangle is
31.9 m by 3 m. which forms the back side, the two sides are rectangles are 14.3 m by 3 m, and the fourth section is 10 m by 3 m. The total square footage of this building is approximately 214 sq. m. The building consists of eighteen (18) rooms. Each room has at least one exterior door and two windows. Four of the rooms have two doors.
Three rooms have three windows and four rooms have four windows. Of the eighteen rooms one is a bathroom with two toilets and two sinks: there are no showers.
This building is structurally in good condition. There were no structural deficiencies noted anywhere. All the doors, windows, electrical fixtures and wires, electrical panel, bathroom fixtures, roof downspouts and roof mounted water tank were stolen. Minor to moderate damage was inflicted to the walls and floors, especially where the stolen items were removed. This building has more extensive damage than the other buildings in this compound. There are no rooms that have fire damage Each of the rooms has one door that exits into the courtyard. The doors are 2 m high by 0.9 m wide. There are forty five windows which are either 0.9 m by 0.3 m or 1 m by
1.2 m. The floors have/had tiles on them. The electric panel for the building was located in a wall on the courtyard side.
The proposed usage of this building is to segregate the worst inmates from the rest of the inmate population. This building will require high security measures.
B. Security Required
Each room in the Segregation Building will require High Security Measures. All doors will be solid metal with sliding dead bolt and clasp locking devices with padlocks. All doors will open outward and will swing 180 degrees. All windows will be reduced in size and will be covered with bars in a grid patterns. The grid openings will not be large enough to allow an average hand to pass through. The windows will be placed at a level with the bottom edge at 1.5 meters. No electrical outlets will be installed in any of the rooms. All ceiling fans will be enclosed in cages All lights will use bulkhead type fixtures. All electrical outlets and electric panels and/or boxes will be located in an area controlled by the guards. All attachment hardware, such as bolts and screws, will be tamper proof.
C. Repairs and Modifications Each room will have installed one high security solid metal doors with bars, dead bolts, locking clasps, and padlocks. All additional doors will be filled in. Where necessary the excess door widths will be filled in. All doors will swing outward and have the potential to travel 180 degrees. There will be seventeen (17) doors installed in this building.
41
•
•
•
•
Thirty one windows will be replaced with smaller sized high security bar windows. The maximum size will be 0.5 m by 0.6 m and will be installed with the bottom edge at a level of 1.5 meters above the floor_ The second windows will be 0.24 m by 0.8 m in size. The rooms on the side toward the Female Holding Building will only have one window with no window on the Female Holding Building side. The bathroom will have two vent openings on the side not facing the Female Holding Building.
All fans will be placed in steel cage enclosures.
All floor tiles will be removed and the floor will be covered with a layer of screed concrete.
In each room one toilet and one sink will be installed. Privacy will be provided through the construction of 1 meter high partitions. These toilets will be located on the exterior wall. The existing bathroom will be changed from two toilets and two sinks to one toilet, one sink, and two showers. The partial height partitions will have to be removed and rebuilt.
Exterior steps will be constructed at both entrance ways with the height being determined by the grade differential. There is a solid wall that partially encloses the courtyard for this building; there are two openings through this wall. A new opening will be cut in the wall near the southeast rooms to allow the inmates to pass through.
The opening near this new cut will be filled in. The second opening is correctly located and will be used after being repaired.
D. Electncal Needs
The rooms will have no electrical outlets or electrical panels. Lights, night lights, and ceiling fans will be installed on and close to the ceiling. All fans will be in metal cage enclosures that will protect them from vandalism. The cages will be constructed so that they cannot be used as handholds or anchorage points. All lights will be bulkhead type fixtures. Night lights will be installed in each room. There will be no air conditioners in any of the buildings. Each room will have one fan except for the bathroom which will have none. Each room will have one light including nightlight except the bathroom which will have two. Where necessary. wiring will be chased in the walls in ducts.
***QUESTION Where are the guards going to be'?**** Wiring in the guard area will include a minimum of one outlet for each 3.7 meters of wall length. Phone service will be provided in the guard room only; the purpose of these phones is to remain in contact with the rest of the prison security.
E. Plumbing Needs
There will be one toilet and one sink in each room. There will be a 1 meter high partitions around the toilet for privacy. The separate bathroom will have one toilet, one sink, and two showers. One 500 liter water tank will be installed on the roof with the necessary plumbing to the toilets, sinks, and showers.
42
•
•
F. Preliminary Material List
1. 31 windows with high security bars
2. 17 exterior security doors — solid metal with locking sets
3. 18 toilets
4. 18 sinks
5. 2 showers
6. 17 toilet privacy walls
7. 3 bathroom stall doors
8. 1 - 500 liter roof mounted water tank with plumbing
9. 19 light fixtures and nightlights
10. 3 electrical outlets
11. 17 ceiling fans
12. 2 exterior steps/stairs
13. 18 general room repairs and painting
14. 1 electrical panel and all necessary breakers and wiring
15. 1 phone service in guard room
16. 18 remove floor tiles from rooms and replace with concrete
17. 1 rebuild bathroom partitions
18. 1 cut opening in courtyard wall
19. 1 fill in opening in courtyard wall
20. 12 replace downspouts
•
•
43
S
•
•
•
Entrance Guard Houses
A. Description:
There are two (2) one story buildings just inside the Main Gate for the guards. These buildings are identical and are rectangular in shape. Each building is approximately 4 m by 6.4 m. Both buildings contain two rooms. The total square footage of each building is approximately 25 sq. m. Each building has two doors and one window.
Each building is structurally in good condition. All the doors and windows were looted.
Minor damage was inflicted to the walls where the stolen items were removed. Neither building has fire damage.
These buildings are located on either side and immediately inside the Main Gate.
When the Main Gate. which opens inward, is open these two buildings are partially blocked. These two buildings will be used by the guards as a meeting/assembly area for controlling all movement in and out of the prison and for an observation point for activity in the eastern part of the compound. Guards from these buildings will be responsible for the main "Sally Port" entrance. These buildings will require normal security measures.
B. Security Required
The Entrance Guard Houses will require Normal Security Measures. There will be three exterior doors installed in each Entrance Guard House. The windows will be replaced with the same size windows. Each will have glass and typical security bars.
Electrical outlets will be restored in each building. The ceiling fans and light fixtures do not need to be enclosed in cages. The electric panel will be relocated in its previous location.
C Repairs and Modifications In each building the window and two doors will be replaced. In addition a third door will be installed that will open into the Sterile Area between the perimeter wall and the first fence line. This door will be a solid metal exterior door.
A small bathroom with just one toilet and one sink will be installed in each building.
A ceiling fan and two lights will be installed in each building D. Electrical Needs Each building will have a minimum of three electrical outlets. Each building will have a minimum of two light fixtures. In addition the building with the bathroom will have an additional outlet and light. The electric panel will be relocated in its previous location.
Where necessary, wiring will be attached to and exposed on the face of the walls. All exposed wiring will be in metal conduit. Both buildings will be equipped with a fan and one of the buildings will be equipped with a phone service.
44
•
•
E Plumbing Needs
In one of the two buildings there will be one bathroom with a sink and a toilet. One 100 liter water tank will be installed on the roof with the necessary plumbing to the bathroom. All new drain lines will be required.
F Preliminary Materials and Repair List
1. 2 windows with typical security bars
2. 6 exterior doors — metal with locking sets
3. 1 interior wood door
4. 1 toilets
5. 1 sinks
6. 1 - 250 liter roof mounted water tank with plumbing
7. 5 light fixtures
8. 5 electrical outlets
9. 2 ceiling fans
10. 4 general room repairs and painting
11. 1 electrical panel and all necessary breakers and wiring
12. 1 phone service
13. 2 replace downspouts
•
•
45
•
•
•
Guard Towers
A General
At the present time there are no guard towers. Eight guard towers are required: one at each corner and one on each side midway between the corners. The Guard Towers will be located in the Sterile Area between the perimeter wall and the first interior fence line.
Size and Construction
The Guard Towers will be constructed using concrete columns, floor and roof. The tower will be 3 m by 3 m and a total height of 7 m. The floor will be at a height of 4.0 m. There will be a 1 m high protective wall around the entire perimeter at the floor level. The roof will slope away from the interior of the prison. Access will be by means of steel stairs.
The towers will be provided with a single toilet and a sink. Around the toilet will be a 1 m high privacy partition. The toilet will be on the side away from the interior of the prison.
The Guard Towers will be founded on reinforced concrete footings.
Each Guard Tower will be provided with an electrical supply a flood light, and a phone service for emergency contact.
C. Preliminary Materials and Repair List 1 8 concrete towers with foundations and safety walls 2 8 steel stairs 3 8 toilets 4 8 sinks 5 8 - 100 liter roof mounted water tank with plumbing 6 8 light fixture 7 8 electrical outlet 8 8 electrical box 9 8 phone services
•
46
S
•
•
•
Yard and Compound Security A General The prison yard is approximately 32380 sq. m (8 acres) inside the perimeter wall.
There are 37 existing structures, 14 will have beds for inmates. The prison will be a medium to high security prison and will house 1000 — 1500 inmates. There is a solid perimeter wall is in place as well as the shell to all of the buildings except the guard towers.
Security Wall and Fence
Security measures will include a 4 meter high solid perimeter wall and 3 meter high interior chain link fence with a coiled razor wire on top for all interior fencing The first internal wire barrier will be continuous except for the break at the Main Gate.
There is a solid continuous perimeter wall around the entire compound. There is only one opening in this wall and that is located at the Main Gate. The original wall was raised by one meter and repaired as necessary to provide temporary security until the prison compound construction is undertaken. This wall will remain in place and reinforced by a second just inside the perimeter. This second wall will consist of driven steel columns with precast concrete panels between the columns. The precast concrete panels will be positively attached to the steel columns and the panels will be set on a precast concrete footing to prevent differential settlement. This new wall will raise the perimeter wall to a height of 4 meters. The gap between the two walls will be filled with concrete. The step in the wall on the exterior will be eliminated by constructing a tapered section out of cast-in-place concrete on top of the existing perimeter wall. The slope of this tamper will be a minimum of 3 vertical to one horizontal.
Encasing the top of the precast wall will be attached a smooth surface, round plastic cylindrical pipe with a minimum diameter that is two feet greater than the wall thickness. This pipe will be split longitudinally on one side and slid down over the top of the wall. It will then be attached to the wall using steel angle sections and bolts.
The purpose of the smooth pipe is to eliminate any handholds for scaling over the wall.
Just within the solid perimeter wall will be a continuous three (3) meter high chain link fence with a double arm ("Y") top section and coiled razor wire and a buried metal sheet below to prevent inmates from digging under. This fence will only have one opening and that will be at the Main Gate. At this opening will be a "Sally Port".
Entrance to the "Sterile Area" between the solid perimeter and this fence will be through doors in the Entrance Guard Houses at the Main Gate.
Completely surrounding clusters of buildings will be a three (3) meter high security chain link fence that is totally independent from the Sterile Area fence. This fence will also have the double arm ("Y") top section and coiled razor wire and metal dig plates below. There will be eight areas fenced off; except for the fence for the C-Wing some areas will share a common fence line.
47
•
•
•
Entrance into the individual fenced areas will be through double gated "Sally Port" security gate entrances. Three of these Sally Ports will accommodate vehicles. They will be located at the Main Gate, at the entrance area to the Kitchen and Recreational Building. and at the entrance to the Medical Center. The remaining entrance areas will have Sally Ports for only individuals to pass through. There will be four of these "man only' Sally Ports. These Sally Port gates will require fence, razor wire and dig plates.
C. Security Lighting
On top of the solid perimeter wall will be mounted security lights to illuminate the prison compound. These lights will be located at a maximum spacing of 50 meters.
There will be twelve security lights mounted to the perimeter wall.
On the roof of each building, except the bathrooms, will be security flood lights that will illuminate the entire yard area around the buildings. There will be 100 yard security lights.
**** QUESTION. DO WE NEED LIGHTS ON EVERY BUILDING? '*
D. Guard Towers and Guard Houses Within the Sterile Area will be constructed eight (8) guard towers. There will be one at each corner and one on each side midway between the corners. These towers will be constructed of concrete and will be seven (7) meters high.
Near the center point of the yard and at ground level will be a Guard House from which the guards can watch most of the activity in the complex and can control all movement at most of the internal gates. Guards at the Main Gate will watch the activities in the remainder of the yard and also control gate activities Utilities All sewer drain lines, water lines, and electric lines within the prison compound will be buried. There will be no exposed or overhead utilities.
All the buildings will be connected by a phone service system for emergency situations.
Water service will be provided to the Prison Compound from the main water line near the street. This water service will require the installation of a 100 mm diameter lateral pipe with valves and backflow prevention from the main to the Generator, Water Tank.
and Fuel Tank Building where a water pump will be located.
Five concrete septic/ holding tanks will be installed in the Yard outside the individual fenced in security areas. These tanks will require periodic pumping. Drain lines and clean outs will be installed from each of the buildings to the nearest septic/holding tank. Almost all clean outs will be located outside the individual fenced in security areas.
48
•
F. •
Preliminary Materials and Repair List
1. 1840 meters of 3-meter chain link fence with "Y" top section and Coiled razor wire
2. 3. 1840 meters of "dig plates" 725 meters of precast concrete 4 m perimeter wall with steel columns, footings, and cap section
4. 3 "Sally Port" vehicle gates; 21.3 m fence, two 3.7 m gates, two 1.2 m gates, 2.3 m razor wire, and 32 m dig plates
5. 4 "Sally Port" man gates; 8.5 m fence, two 1.2 m gates, 8.5 m razor wire, 11 m dig plates
6. 12 Perimeter security lights
7. 100 Building security lights
8. 1270 meters of 150 mm diameter sewer drain line
9. 180 meters of 100 mm diameter water main with 2 valves
10. 5 Septic/holding tanks
11. Site grading
12. Repair to asphalt pavement
13. 13 remove existing septic tanks and manholes
•
•
49
•
Electrical — Generator
•
•
•
50
•
•
Basrah Central Prison
Electrical Load
LOADS MAX (kw) DESIGN (kw) Interior Load 536,107 322,477 Exterior Load 75 250 75, 50 Subtotal Load 611,357 397,727 Safety/Expansion Factor (15%) 91 704 59,659 Maximum Total Load 703061 457,386 EQUIPMENT INVENTORY & COST ESTIMATE (Costs to Purchase & Install) QUANTITY UNIT COST (1) ITEM COST (1) Emergency Generators 600 KW 2 $119,000 $238,000 ITEM-1 Ceiling light with protective grill 491 $20 $9,816 ITEM-2 Night Light with protective grill 458 $9,152 ITEM-3 Ceiling Light (Hallway) 58 $10 $580 ITEM- .
4 Ceillpg light (Workspace) $10 $2,590 ITEM-5 Ceiling Fan wfProtective Grill & Room Wiring .
259 $35 PAW
rrai-6 Ceiling - if
_
.
- i% -iiR• - iiiiii— wIring 110 $25 $2,759 fitfi.:7 13-amp Electrical Outlets w/Room Wiring 89 $10 $890 ITEM-8 15-amp NC Electrical- Outlets w/Room Wiring 53 $10 $530 ITEM-9 lhp Water Pump (Centrifugal) 26 $100 $2,600 LTEM-10 Refridgerator 9 1500 14,500 ITEM-11 Perimeter Flood lights (250 Watt Metal Halide, Pole Mourged Mount) 172 $400 $69.900 ITEM-12 Yard Flood light (150 Waft Lew Pressure Sodium Light Wall Mounted) 162 $250 $40,500 ITEM-13 Overdoor Flood tight (150 Watt Low Pressure Sodium Light Wall Mounted) 53 $250 $13,250 TOTAL $403,032 NOTE-1: Estimate does not indude overhead (8%) and profit (8%). Unit costs are for materials and labor only.
Overhead and proN to be Included in summary estimate of all work elements.
NOTE-2: Estimate does not include purchase and installation of new main transformers, changeover switch, circuit breaker panels, isolation switches, or cabling. These depend on the installation design to be done by Infrastructure Assessment Team
•
roe Pp. & lyui.11Y27 (LT- ESTitY)A•rE.. U.5r7- 2Z e)Co iCra.r)
•
•
Design Analysis:
1.Design is based on the Exel electrical load data sheet. Transformer and generator size are based on the given demand loads in the data sheet.
2.Panel board size and over current protection devices are sized per Square-D Product (Panel board 600volt, I-Line, 3-pole, type HCN and ECM; circuit breaker type IC rated 415/240Vac Maximum, 50/600z Class 600)
3.All feeder and branch circuits are size in according with the American Wire Gage (AW(;).
4.Refer to the Exel spread sheet for maximum number of devices can be loaded on a typical branch circuit.
•
•
•
• •
Branch Circuit Calculation Load Type Circuit Breaker Voltage Max number device per cirult Conductor Size Conduit
1.40Watt Ceiling Light W 20Amp 1-pole 240V 90 fixtures 2412 AWG + #12 AWG ground 1/2" Protective Grill
2.Night Light fixture with 20 Amp, 1-pole 240 V 200 fixtures Grill
3.40 Watt Ceiling Light in the hail way 20Amp, 1-pole 240 V 90 fixtures 4.40 Watt Ceiling Light in the work space 20Amp, 1-pole 240 V 90 fixtures 5.Ceiling Fan 16 Amp, 1-pole 240 V 40 fan units 6.13-Amp receptacle 16 Amp, 1-pole 240 V 8 recetacles 7.Receptacle for AC unit 16 Amp, 1-pole 240 V 1 receptacle per A/C unit 8.Water Pump 20 Amp, 1-pole 240V 1 unit per circuit 9.Refrigerator 16 Amp, 1-pole 240V 1 unit per circuit 2412 AWG + #12 AWG ground 1/2" 2412 AWG + #12 AWG ground !/2" 2412 AWG + #12 AWG ground 1/2" 2412 AWG + #12 AWG ground 1/2" 2412 AWG + #12 AWG ground 1/2" 2412 AWG + #12 AWG ground 112" 2412 AWG + #12 AWG ground 1/2" 2412 AWG + #12 AWG ground 112"
•
General Tasks for Completion:
The tasks generally undertaken to bring this project to completion includes:
1. FEST Team prepare preliminary assessment design report and preliminary cost estimate (this
2. 3. 4. 5. 6. 7. report), UK Project Manger/Administrator seek and secure the necessary funding, FEST Team prepare scope of work and contract documents, UK Project Manager solicit bids with guidance and assistance from Contractors, FEST and RIG has a list that can be consulted, UK Project Manager and FEST Team evaluate bids UK Project Manager awards contract UK Project Manager hires and assigns local Construction Manager Attachments:
Miscellaneous Details
1. 3 Meter High Fence with coiled razor wire
2. Vehicle "Sally Port" Entrance Gate
3. Man 'Sally Port" Entrance Gate
4. Guard Tower
5. Barred Window Example
6. Preliminary list of windows and doors sizes Preliminary Cost Estimates Submitted By: bxe) Approved BY: 050) CPA S FEST Team Leader
•
•
51
mai
WO)
Basrah Prison
Security and Hardware Requirements Building Approx. Sq.
Ft. Area
Security /
Non-
Security
Number of
Rooms
Window w/ Windows
Security w/ Regular
Bars Bars
Doors
Doors with Doors Solid Doors Metal Wood Bars Metal Face Exterior Interior Ceiling Fan in Enclosure Ceiling Fan esumneao Light Enclosures Lights A-Wing
28- SW #1,
1 #A1 3360 s 2
9 - SW #2 4 - SD #1 2 #A1 Guard 240 s 1 2 - SW #3 1 - SD #3 28 - SW #1, 3 #A2 3360 s 2 8 - SW #2 4 - SD #1 4 #A2 Guard 240 S 1 2 - SW #3 1 - SD #3 28- SW #1 5 #A3 3360 s 2 8 - SW #2 4 - SD #1 6 #A3 Guard 240 S 1 2 - SW #3 1 SD *3 28 - SW #1, 7 #A4 3360 s 2 8 - SW #2 4 - SD #1 8 #A4 Guard 240 s 1 2 - SW #3 1 - SD #3 9 A Bathroom 1 650 s 2 14- SW #4 10 A Bathroom 2 650 s 2 14 • SW #4 B-Wing 28 - SW #1, 11 #131 3360 s 2 8 - SW #2 4 - SD #1 12 #131 Guard 240 S 1 2 - SW #3 1 - SD #3 28 - SW #1, 13 #132 3360 s 2 8 - SW #2 4 - SD #1 14 #B2 Guard 240 s 1 2 - SW #3 1 - SD #3 28 - SW #1, 15 #B3 3350 s 2 8 - SW #2 4 - SD #1 16 #B3 Guard 240 s 1 2 - SW #3 1 - SD #3 28- SW #1, 17 #34 3360 s 2 8 - SW #2 4 - SD #1 18 #34 Guard 240 S 1 2- SW #3 1 - SD #3 19 B Bathroom 1 650 s 2 14 - SW #4 20 B Bathroom 2 650 s 2 14 - SW #4 8 - SFE #1 8 12 - SLE #1 12 1 2 8 - SFE #1 8 12 - SLE #1 12 1 2 8 - SFE #1 8 12 - SLE #1 12 1 2 8 - SFE #1 8 12 - SLE #1 12 1 2
4- SLE #1 6
4 - SLE #1 6
8- SFE #1 8 12- SLE #1 12
1 2
8 - SFE #1 a 12 - SLE #1 12 1 2 8 - SFE #1 a 12 - SLE #1 12 1 2 8 - SFE #1 8 12 - SLE #1 12 1 2 4 - SLE #1 4 4 - SLE #1 4 C-Wing 21 #C1 3570 S 6 15 - SW #1 7 - SD #1 22 #C2 3570 s 6 15 - SW #1 7 - SD #1 23 #C3 3570 S 6 15 - SW #1 7 - SD #1 24 C Bathroom 650 s 2 14 - SW #4 12 - SFE #1 12 12 - SLE #1 18 12 - SFE #1 '2 12 - SLE #1 18 12 - SFE #1 12 12 - SLE #1 18
4- SLE #1 6
9- SW in ,
25 Juvenile Blgd 2090 s 9 9 - SW #4 8-SD #3 26 Female Bldg 1340 S 4 Segregation 27 Bldg 2300 s 18 20 - SW #1, 3 - SW #2 1 - SD #1 4-SD #4 17 - SW #1, 14 - SW #5 17-SD #4 9- SFE #1 9 10- SLE #1 10 8 - SFE #1 8 11 • SLE #1 11 17 - SFE #1 17 19 - SLE #1 19 8 - W #1, 28 Visitor's Center 4050 N 4 8- W #2, 3 -042 2-041 9 21
14- W#1,
29 Reception Bldg 3760 N 13 2 - W #2 14-042 3-D#1 14 40 Administration 6- vy W2, 5 - U #2, 30 Building 1800 N 8 9 - W #4 2 -D#3 2-041 9 24
17-vv#1, 5-042, 1 - 0 #1,
31 Medical Center 4030 N s 2 - W #3 2-043 1-044 11 -SFE#1 17 40 Stan and 33- W #1, 20 -ID #2, 32 Regional HO 3990 N 38 9 - W #5 10 -D#3 12 -D#1 28 72 Kitchen and 37 -SW# 3 33 Rec Hall 6190 S 5 2 - SW #5 8- D #1 21 38 34 Guard House 300 N 2 3 - W #1 1-043 1-041 2 5 35 uenerator ano Water Tank 36 Entrance Guard 37 Entrance Guard 38 (Ware Towers
(8) 100 N1
Bldg 860 N 3 4 - W #4 1-D#1 3-044 6 9 House 1 280 N 1 1 - W #1 3 - 041 1 2 House 2 280 N 1 1 - W #1 3 - D #1 1 3
• • •
Security: Windows
Type: SW # 1 Size: 500 mm x 610 mm (20" x 24') Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Square stock 15 mm X 15 mm (9/16" x 9/16"); vertical bars continuous horizontal bars intermittent Spacing: 64 mm x 64 mm (2.5" x 2.5") center to center vertically and horizontally Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement. Restricted Construction: Welded with continuous welds SW #2 SW # 3 SW #4 SW #5 Size: 250 mm x 250 mm (10" x 10") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Square stock 15 mm x 15 mm (9116" x 9116"); vertical Spacing: 64 mm x 64 mm (2.5" x 2.5") center to center Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Restricted Construction: Welded with continuous welds Size: 915 mm x 915 mm (36" x36") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Square stock 15 mm X 15 mm (9/16" x 9/16"); vertical bars continuous horizontal bars intermittent Spacing: 64 mm x 64 mm (2.5" x 2.5") center to center vertically and horizontally Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Restricted Construction: Welded with continuous welds Size: 460 mm x 460 mm (18" x 18") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Square stock 15 mm x 15 mm (9/16" x 9/16"); vertical Spacing: 64 mm x 64 mm (2.5' x 2.5") center to center Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Restricted Construction: Welded with continuous welds Size: Frame: Bars: 250 mm x 760 mm (10" x 30") Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Square stock 15 mm x 15 mm (9/16" x 9/16"): vertical
W #1 W #2 W #3 W#4 W #5 Spacing: Mounting Frame: 64 mm x 64 mm (2.5'' x 2.5") center to center Steel Frame bolted in wall with tamper proof bolts Movement: Restricted Construction: Welded with continuous welds Size: 915 mm x 915 mm (36" x 36") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Typical building safety bars Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Unrestricted; glass open inward Construction: Welded with continuous welds Size: 460 mm x 460 mm (18" x 18") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Typical building safety bars Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Unrestricted; glass open inward Construction: Welded with continuous welds Size: 250 mm x 760 mm (10" x 30") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Typical building safety bars Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Unrestricted; glass open inward Construction: Welded with continuous welds Size: 460 mm x 1070 mm (18" x 42") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Typical building safety bars Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Unrestricted; glass open inward Construction: Welded with continuous welds Size: 460 mm x 915 mm (18" x 36") Frame: Steel angles 25 mm x 25 mm x 5 mm (1" x 1" x 3/16") Bars: Typical building safety bars Mounting Frame: Steel Frame bolted in wall with tamper proof bolts Movement: Unrestricted; glass open inward Construction: Welded with continuous welds
Security: Doors
Type: SD #1
SD #2
SD #3
Size: 2030 mm x 915 mm (6.-8" x 3'-0") Type: Bars - open Frame: Steel Bars: Steel square stock 16 mm x 16 mm (5/8" x 5/8"); smooth surface; vertical bars continuous;
Horizontal bars intermittent; Reinforced horizontally at third points and at latch Spacing: Mounting Frame: Hinges: Movement. Latch: 64 mm x 64 mm (2.5" x 2.5") center to center vertically and horizontally Steel frame bolted in wall with tamper proof bolts Steel with tamper proof hardware Must open outward with possible rotation up to 180 degrees External sliding bolt with flip down clasp and loop for padlock;
Latch to be attached to door with tamper proof bolts Construction: Welded with continuous welds; hinge and latch attachments with tamper proof bolts Size: 2030 mm x 813 mm (6'-8" x 2'-8") Type: Bars - Open Frame: Steel Bars: Steel square stock 16 mm x 16 mm (5/8" x 5/8"); smooth surface; vertical bars continuous;
Horizontal bars intermittent; Reinforced horizontally at third points and at latch Spacing: Mounting Frame: Hinges: Movement: Latch: 64 mm x 64 mm (2.5" x 2.5") center to center vertically and horizontally Steel frame bolted in wall with tamper proof bolts Steel with tamper proof hardware Must open outward with possible rotation up to 180 degrees Key locking mechanism with additional dead bolt on inside Latch to be attached to door with tamper proof bolts Construction. Welded with continuous welds; hinge and latch attachments with tamper proof bolts Size: 2030 mm x 813 mm (6'-8" x 2-8") Type: Bars - open Frame: Steel Bars: Steel square stock 16 mm x 16 mm (5/8" x 5/8"); smooth surface. vertical bars continuous;
Horizontal bars intermittent; Reinforced horizontally at third points and at latch Spacing; Mounting Frame: Hinges: Movement: Latch: 64 mm x 64 mm (2.5" x 2.5") center to center vertically and horizontally Steel frame bolted in wall with tamper proof bolts Steel with tamper proof hardware Must open outward with possible rotation up to 180 degrees External sliding bolt with flip down clasp and loop for padlock;
Latch to be attached to door with tamper proof bolts Construction: Welded with continuous welds; hinge and latch attachments with tamper proof bolts
SD #4 D #1 D #2 D #3 D#4 Size: Type: Frame: Facing Viewing port: Mounting Frame: Hinges: Movement: Latch: Construction 2030 mm x 810 mm (6'-8" x 2'-8"): final thickness 25 to 40 mm (Ito 1.5") Steel plate - solid face with hollow core Steel channel or rectangular tubing to provide door thickness of 25 mm (1") to 40 mm (1.5");
Horizontal bracing at quarter points or continuous bracing through core filler;
Steel plate minimum 3 mm (1/8") thick mounted to both sides of steel angle frame 75 mm diameter observation aperture Steel frame bolted in wall with tamper proof bolts Steel with tamper proof hardware Must open outward with possible rotation up to 180 degrees External sliding bolt with flip down clasp and loop for padlock;
Latch to be attached to door with tamper proof bolts Welded with continuous welds; hinge and latch attachments with tamper proof bolts Size: 2030 mm x 915 mm (6.-8" x 3'-0") Type: Exterior metal door Mounting Frame Steel frame bolted in wall with tamper proof bolts Hinges: Steel with tamper proof hardware Latch: Typical door latch with key set Size: 2030 mm x 915 mm (6'-8'' x 3.-0") Type: Interior solid wood door Mounting Frame: Steel frame bolted in wall with tamper proof bolts Hinges: Steel with tamper proof hardware Latch: Typical door latch with key set Size: 2030 mm x 810 mm (6'-8" x 2'-8") Type: Interior solid wood door Mounting Frame: Steel frame bolted in wall with tamper proof bolts Hinges Steel with tamper proof hardware Latch: Typical door latch with key set Size: 2030 mm x 1830 mm (6'-8" x 6-0") Type: Exterior metal double door Mounting Frame: Steel frame bolted in wall with tamper proof bolts Hinges: Steel with tamper proof hardware Latch: Typical door latch with key set and hardware to separately latch one door to upper and lower jam Security: Enclosures
• • •
Type: SFE #1
Size: Frame: Bars: Covering: Low profile steel cage with dimensions to accommodate fan dimensions Steel angles 38 mm x 38 mm x 7 mm (1.5" x 1.5" x 1/4") Steel square stock 15 mm x 15 mm (9/16" x 9/16") Steel security mesh grill with maximum hole size 3 mm square attached to outside of frame to prevent any ligature being attached or used as an anchorage point;
Mounting Frame: Steel frame bolted in ceiling with tamper proof bolts Construction: Welded with continuous welds Movement: Restricted; removal only necessary for maintenance Security: Light Enclosures Type: SLE #1 Size: Low profile Type: Bulkhead style Covering: Shatter resistant plastic Movement: Restricted; removal only necessary for bulb replacement and maintenance
•
•
Prison Cost Estimate Summary Location Name Number of Buildings Total Square Meters Estimated Cost Cost per square meter Administration 1 167 $15,644 $93.68 Medical 1 374 , $27,235 $72.82 Reception 1 309 $20,588 $66.63 Staff and HQ 1 750 $43,496 $57.99 Visitor's 1 376 $36,889 $98.11 Kitchen and Rec 1 575 $32,002 $55.66 Entrance Guard 2 50 $4,242 $84.84 Guard House 1 28 $4,896 $175.48 Guard Towers 8 72 $40,360 $56.06 A-Wing & B-Wing 8 2496 $152,856 $61.24 C-Wing 3 996 $66,036 $66.30 A, B, & C Bathrooms 5 315 $43,345 $137.60 Female Holding 1 124 $17,663 $142.44 Juvenile Holding 1 194 $18,643 $96.10 Segregation 1 214 $30,055 $141.85 Generator 1 79 $7,139 $90.37 Yard & Security 1 32380 $1,979,423 $61.13 Electrical $500,000 Requirements TOTAL $3,040,812
•
•
• CPA CONTRUCTION PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by the CPA Action Officer) CPA PROJECT NUMBER;
CPA PROJECT TITLE Administration Building BID ITEMS UNIT Of UNIT PRICE ITEM COST 1 - PERIMETER SECURITY ITEM DESCRIPTION SIZE MEASURE QUANTITY (1 US) (S US) Repair perimeter watt (concrete or
1.1
brick construcnon) SM 0
Construct new perimeter eel 12 (5_ :_ oncrete or brick opratruclich).
SM
0
Consbuct Precast concrete perimeter wet SA 0
1.3 Repair perimeter fence (steel) SM 0
1.4 Construct new perimeter wet (steel) SM 0 new steel than Ink fence 3 meters Mid
•
Instil sleet trig plata 1 meter high LM 0
1.5 Repair entakaillate
1.8 Instal new entry/exit gate Vehicle Tel* Port' Men "Ssla Por Meld no:or Wake on existing fence or
1.7
wet LM
0
Prepare surbce and pant existing gates or fences with 1 coat primer
1.8
94
and 2 coats oil paid 0
Prepare surface and paint existing perirnter wall with 2 coats water
1.9
based paint (latex) SA
1.10 Other (Descrbe in the space below.
Use Bid item 10 if necessary) Indicate Unit of Measure Below 0
- Complete structural concrete guard tower with steel roofing Each 3510.00 UNIT Of MEASURE QUANTITY UNIT PRICE (3 US) ITEM COST (1 US)
•
2- SITEWORK ITEM DESCRIPT)ON SIZE
Remove and dispose off site all trash
2-1
and debris SM 0
Demolish math etruckwes and
2.2
dation al al debris
IS
0
Grading and leveing of ground (to inctrde removing protruding enacts
2.3
from
SM 0
Repair asphalt pavements or
2.4
walkways SM
0
Replace asphalt pavements or walkways SM ____ Repair concrete pavements or
2.6
walkways SM
Replace concrete pavements or
2.7
wimp . . . ._....
......
Repair other type of pavements or 0 0 0
2.8
2.9 walkways
Other (Descant in the space below.
Use Bid Item 10 If necessary) SPA Indicab Una of MUM Bdow 0 Canard! concrete eray steps Each 2 150.00 Construct concrete way ramp Each 40000 UNSTOP MEASURE QUANTITY UNIT PRICE (.1 US) 300 0 ITEM COST (1 US) 3 - FLOOR SYSTEMS ITEM DESCRIPTION SIZE Presstre wash and dean existing
3.1
floras SM 167 1.00 187
Remove and dispose demigod door
•
1.00
85
-
.
3.3 1275
Instal new Aeor covednge
15.00
Repek samba* damaged floor
3.4
Mobs Mt 15.00 0
• CPA CONTRUCT1ON PROJECT BID SHEET
3.5
3.6 •Meta new reinforced concrete floor ebb (specify thickness in bid) Other (Desaibe in the space below USe Bid Item 101 necessary) SM Indite l)ort of Mcawre Below D n .. ____..
Stvi
Reptdrelairs 15.00
o
LM
Instal stabsay rg 18.00
0
UNIT OF
UNIT- PRICE (f
ITEM COST
4 - WALL & CEILING SYSTEMS ITEM DESCRIPTION SIZE
MEASURE QUANTITY
US)
(S US)
Remove damaged piaster from wails IX ceilings and repair with mortar
4.1
anclor gypsum piaster as required' Prepare wall or celiac surface, apply 1 coat primer/sealer and 2 coats latex
4.2
(water based) pant
SM 500 4.00
2320
Prepare wall or ceiling surface, apply .- 1 toot primer/sealer Drld 2 coats oil
4.3
based paint
SM 0
Demolsh unscund watts / collage and
4.4
depose a al debris SM 29 2.00 56 Bald new masonry well with 45 mortar/plaster Wish SM 25 40.00 1000 Remove damaged ceramic Me wet
4.6
covering and Meal new des
4.7
Other (Dasabe In the space below.
Indicate Unit of
Use Bid Item 10 /I necessary) Measure Below Fill in wall ;palings - SM 4 40.00 Install Suspended Ceiling 10.00 160 0 Remove suspended ceiling u SM 2.00 5 - ROOF SYSTEMS ITEM DESCRIPTION S UNIT OF MEASURE QUANTITY UNIT PRICE ($ US) ITEM COST (8 US)
5.1 RetmagoInts around roof tiles SPA Reels= Ind seal damaged or
5.2
raining toot Ms SM 30 30.00 Oo
5.3 Repair parapet wale. faro* or eaves SM 0
5.4 bard sea Maar root panals SM 16.00
5.5 Clear root drain and ditirmeut _..
66 Instal new mot drain
Side
0
0
5.7 Install new, downspout Each 4 00.00 320
5.8 Othiii-(Describo it the space below.
. Indicate Unk of
Use Bid Item 10 if necessary) Measure Below 0 UNIT OF UNIT PRICE (6 ITEM COST
6- DOORS & WINDOWS ITEM DESCRIPTION SiZE MEASURE QUANTITY US) (S US) 'nets/ new wooden baba-CM door
8.1
(specify size) Seth 7 30.00 210 .. .. ._ Instal new wooden door Same
8.2
(specify size) Lath 0
--
(k3 Install new steel doordylize) Steel double door Lath
50.00
. .
150.00
100
0
...... . _
High wady sleet bars Eath 150.00 Instal new steel door frees (ePocilY size) 35.00 315
6.6
__6.6
Seel double door frame E.th 100.00 Instal new deadbolt lock end furnish 3 sett of keys Lath 9 10.00 00 Lock idiot high wady steel burs door Lath 25.00 Paint roleling door (1 coat primer + 2 code al pint) SM 0 Instal other type of doze (spa* size an _l_b . -- - _ Batroorn dell door Eath 4 20.00 80
• CPA CONTRUCTION PROJECT BID SHEET
I Remove broken window glass and replace with new glass In existing
8.7 frame MA 0
Prepare rough opering iri Wall and instal new window frame and glass 66 (specify size it bid) End' 15 40.00 000 Frame only .
Each 25.00
___
--
Instal steel security bars (burglar 69 Each 15 25.00 375 bars) on window , itigh society steel bars Each 50.00 0
6.10 Clean wising Velf1(10WS SM
•
- - --
o
0
5.11
. 6.12- -
Paint existing WfUJOW frames 'other (Desaibe in the space below.
Use Bid Item 101 necessary) EA Inckate Unit of Measure Below
•
...
7 - ELECTRICAL SYSTEMS ITEM DESCRIPTION SIZE
UNIT OF
MEASURE QUANTITY
UNIT PRICE
US)
7.1
IMO new surface-mounted elecetal Wring (specify Wm type & damelerL_ •
7.2
LM
Each
Instal new electrical (Mid 28
17.00
0
(1 ITEM COSY
(1 US)
0
476
7.3
Instal new Wel wash Each
16
18.00
288
74 Instal new Itourement 191111bdure Lath 24 40.00 960 Met 17.00
- - - • _
.
75 instil new ceiling Ian Lath 9 40.00 Instil new telephone cable (Angie
7.0
....petr)
Each
.. .
. _.. .
360
.
- -
•
7.7
Instal new telephone Wok
Each
5
40.00
200
Instal new ciretit Meeker (specify
7.8
type and capacity) Each 8 10.00 go Instal new that breaker panel breakers (snooty number of end
7.9
capacity)
Eadi 1 750.00 750
Install new leoiedon svAch (specify
7.10
type and capacity)
.
-- • Es
1 _mom, .
Instal new mans transformer Opacity
7.11
type and capacity)
Lath
0
new mains (specify
MAW cabana type
7.12
and size)
Instal new electrical generator with changeover snitch (specify make.
7.19
model, and capacity)
Instal new fuel tank for pervirelor (vAli capacity to opera* generator kw
7.14
72 hours COnalb9)
Metal new exterior legally UMW
7.18
(wady type end size) on buildings Lath o new exterior security Install Ighting (1P,9ifY tYPe and sizot)
7.16 Other (Desaibe in the space below.
Use Bid Item IC it necessary) an perimeter well Each Indcir te Una ot Measure Below
-
' UNIT OF
8. MECHANICAL SYSTEMS ITEM DESCRIPTION SIZE
MEASURE QUANTITY
UNIT PRICE
US)
0
($ ITEM COST
(8 US)
metal new %Widow air conditioning
8.1
unit ( n
et* ti
ci lLnber of vats/amps) Each 5 450.00 2250 Instal new split air conditioning unit 82 (epeaTy number of tons) Each 0
8.3 WAN new exhaust kin and skinhead' UA o
8.4 instal new air supply duchvork LM o
8.5 Instal new air exhaust dudwodt LM o
8.6 'Other (Describe in the space - below.
Matte Unit of
Use Bid Item 10 if necessary) Meesure Below , o UNIT C/E UNIT PRICE 9 - SANITARY a WATER SYSTEMS I ITEM DESCRIPTION SIZE MEASURE QUANTITY US) (1 ITEMCOST (8 US) ._
•
CPA CONTRUCTION PROJECT BID SHEET
9.1 Install new Eastern style toilet Each
80.00
9.2 Instau now Western style toast I- nen
9.3 :Test and clean sanitary drain ptpes I Install new sanitary drain pipes
9.4 i(specify cgarneter and_, hce) Each 4
10.00
40
_
I k4
12.00
9.5
9.6
9.7
Clean and repair existing septic tanks (lo include new loddng hatch covers) Instal new aspen tank (b Include bang hatch covers) Remove ebbing septic tanks and manholes Instal new porcelain sink with shul-olf staves Each 0 Each 0 Each
150.00
GOO
.Install new water piping (specify size 931 _land ems i.e. P. dal, copper...) LM
9.9 Instal new main stai3off valve 1 50.00 50
9.10 Install bad** prevention valve 1 GO
90.00
9.11 Instal new plastic water tanks
9.12 Other (Describe In the apace below.
Use Bid Item 10 if necessary) Each 1 Indicate Unit of Measure Below
373.00
375
0
Instal shower unk
Each
150.00
0
:Remove aerially at °prangs Each
50.00
Water pump
Each 145.00
0
UNIT OF I UNIT PRICE ($ ITEM COST
10 - OTHER BID ITEMS ITEM DESCRIPTION
MEASURE I QUANTITY US) I (3 US)
Provide armed security personnel 24 hours per day (kat% the entire
10.1 duration of the contract DAYS
10.2 Replace kitchen tablelshell Each 150.00
10.3
10.4 I
10.5
0
10.6
0
10.7 0
10.8
0
10.9 0
10.10 :
10.11 0
10.12 0
10.13 i 0
1014 0
10.15
Estimated BID PRICE.
15644
•
• CPA CONTRUCTION PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by Me CPA Action Officer) CPA PROJECT NUMBER:
CPA PROJECT n71E: Medical Building BID ITEMS UNIT OF
- PERIMETER SECURITY ITEM DESCRIPTION SIZE
MEASURE QUANTITY
Repsir perimeter wall (concrete or
1.1
trice construction)
Ccristruet new perimeter vial
1.2
(concrete or brick construction) Consbuct Precast concrete perimeter UNIT PRICE ($ US) ITEM COST (5 US)
1.3
Repair perimeter fence (steel)
1.4 Construct new perimeter war (steisl)_ _ . ..
Construct new steal ctaiks Ink Panne 3 meters high SM 0 instal steel dig plates 1 meter high LM 0
•
1.5 Repair entry/exit gate
1.8 Instal new entr)/exit gate Vehicle "Slily Port' Each 0 Man 'Say Par Each 0 Instal razor wire on existing fence or 17 WOO LM 0 Prepare surface and paint existing gates or fences with 1 coat primer
1.8
end 2 coats oil paint SM 0 Prepay surface and pain existing perimter veal WM 2 coals water
1.9
based paint (latex) SM 0
1.10 Other (Desist* in be space below indicate Unit of Use BA Item 101 necessary) Measure Below 0 COmplete strucluni canaille guard tower with steel roofing Cad, 3510.00 UNIT Of MEASURE QUANTITY UNIT PRICE ($ US) fTEM COST (I US)
•
2 SITEMIORK ITEM DESCRIPTION SIZE
Remove and dispose off Me at trash
2.1
and debris SM 0
Demolish unsafe Outlives and
2.2
dircoee of at debris IS
Grading and leveling of ground (to include removing protruding objects
2.3
horn ground)
SM
0
Repair asphalt pavomonts or
2.4
viallovays
Replace asphalt pavements or 25 wallormys Repair concrete pavements of
2.8
walkways
Replica concrete pavements at
2.7
walkways
SM 0
Repair other type of pavemartlb Or
2.8
2.9 always
Other (Desabe In the space below.
Use BM Item 101 necessary) EN Indicate UnR of Measure Below 0 Construct concrete entry steps Each 1 150.00 150 Construct comae entry ramp 1 400 00 400 UNIT OF UNIT PRICE (S ITEM COST 3 - FLOOR SYSTEMS ITEM DESCRIPTION S MEASURE QUANTITY US) (5 US) Present nosh and dean existing
3.1
Boors SM 374 1.00 374
Remove and dispose damaged floor
3.2
coverings 1.00
•
_ .
3.3 Instal new floor coverings SPA 15.00 3375 Repar sir-oohs- say damaged floor 34 SM 16.00 0 slabs
•
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
Instal new refnforeed concrete Soar
3.5
elab (specify thickness in bid) SSA
3.6 Irdtcate Unit of
Other (Describe in the space below.
Use Bid Item 100 necessary) Measure Below Repair stairs Shl
15.00
0
Instal stairway rainy
LM
18.00
0
UNIT OF
UNIT PRICE (f
ITEM COST
4- WALL 6 CEILING SYSTEMS ITEM DESCFUPDON SIZE
MEASURE QUANTITY
US)
(6 US)
Remove damaged piaster from waits Of °Wogs and repair with mortar
4.1
elatlor gypsum plaster as required 3M 0 Prepare wall or ceiling surface, apply 1 coot primer/sealer and 2 coats Latex 42 (wider based) pain 1165 400 4660 Prepare well or ceding surface, apply 1 coat primer/sealer and 2 coats ad
4.3
bared paint
Demaish remould wars I ceirnos and .
4.4
dispose of al deals
SM 2.00
Bold new masonry wet with
4.5
malartplaster Wash SM 124 40.00 Remove damaged ceramic Me wail
4.6
covertly and instal new am SM 0
4.7 Other (Describe in the apace below.
Indicate UM of
Use Bid Item 10 d necessary) Measure Below FM In mall openings SIA 40.00 Mall suspended salmi SPA 10.00
5- ROOF SYSTEMS ITEM DESCRIPTION SIZE
Remove
impended ceiling SM 2.00 0 UNIT OF UNIT PRICE (6 MEASURE QUANTITY US) 0 0 0 ITEM COST IS US)
- t--
•
5.1 Reseal joints around roof Lies at Replace aid sear damaged or
5.2
missing roof tiles 30.00
5.3
Repair parapet waft, fasaa, or OWNS SM 0 54 Instal new sleet roof pae SM 16.00
5.5 Clear root drain end dOwnemt 0 56 Metal new ma drain
5.7 Install new downspout Each 8 80.00 640
• 5.11 Other (Describe in the spa* below.
Indica, Unit of
Use Bid Item 10 if necessary) Measure Below 0 UNIT OF UNIT PRICE ($ ITEM COST 8 - DOORS & WINDOWS ITEM DESCRIPTION SIZE MEASURE QUANTITY US) (6 US) Instal new WOOdllfl hcibr003111 000r
8.1
(speCily siLI) Bath 7 30.00 210 Metal new wooden door bane
6.2
(specify size) Eads 0
6.3 Install new steel door (specify size) Eath 2 Isom 100 Steel double door EaCh 180.00 0
6.4
High security steel bars
Install new steel door frame (spedfy 54f2)_ Bath 150.00 0
36.00
315
8.5
6.6
Sleet double door frame Bath 100.00 0 Instal new &Whol rod and furnieh 3 sets of 9 10.00 00 ,Lock set for NO Beady alma boa 'door 26.00 0 'Paul existing dote (1 cod phew • 2 costs oil pein1I 0 ..__........
Install other lam of door (epatify Sae and base In bid) Bath 4 Ballroom stall door Bitt MOD 0
• CPA CONTRUCTION PROJECT BID SHEET
8.7
89
Remove broken window glass and replace with new glass in existing frame sm Prepare rough opening in wet and Instal new window frame and glass (specify size in bag Eadi 19 o
40.00
6.9
Frame only Edi
Install steel security bms (burgler bars) on windcw Beth 19
25.00
25(X)
High security steel bws Beth 50.00 780 0 475 0 _
6.10 Clean existing wrborm SM 0
8.11 Paint evistIng window frames
8.12 Intik:ate Unit of
Other In Me below.
(Destabe specs
Ues Bid Item 10 li necessary) Measure Below EA o
7- ELECTRICAL SYSTEMS ITEM DESCRIPTION SIZE
UNIT Of
MEASURE 1 QUANTITY
UNIT PRICE ($
US)
0
ITEM COST
(S US)
•
7.1
Wad new surface-mounted elechictd salmi (specify wire types ctemeteti LM
7.2 ao 17.00 680
MOM new elsctricai outlet
Each
7.3 biota' new wail switch Beth 17 gm 300
7.4 Instal new Aountiment Agit Wire Beds 40 40.00 1000 Install nightlights .E1di
17.00 0
7.3
Instal new ceiling len 17 40.03 Eat Instal new telephone cable (single
7.0
par .)
•
7.7 Instal new telephone jack Eat 3 age 120 Instal new circuit breaker (specify
7.8
*iiiancl ceputly)
10 10.00 100
Instal new dm* breaker panel (spedfy number el eteakers and
7.9
Lads
colodY) 1 750.00 750
Instal new isolatbn svatcti (specify
7.10
type and CaPaalY) Beth 1 250,00 250 Instal new mains transformer (specify
7.11
tYPIll and naPacAY)
Eat
0
Instal new mains cubing (specify typel
7.12 0
and size)
LM
Wall new electrical generator with changeover stanch (specify make.
7.13
model, and capacity) Lads 0 Instal new fuel tank for generator (WO capadty to operate generator for 744 72 hours continuously) Lads 0 InStal new exterior security lighting
7.15
(e1 )9c9Y arPla and sae) en buldings Eat Instal new exterior &easily lighting (specify type and sae) on perimeter vial Each
7.10 Other (Describe in the space below.
Use Bid Item 104 necessary) Indicate Unit of Measure Below UNIT OF MEASURE QUANTITY 0 UNIT PRICE IA ITEM COST US) (S US)
8- MECHANICAL SYSTEMS ITEM DESCRIPTION SIZE
Install new wncbaf at conditioning
8.1
unit (specify number of watlefamps) Instal new splt air comlibordng urdt
8.2
seedy nimiber of tons)
450.00 4080
8.3
Imaell new &dawn len end ductwork
8.4
Instal new air supply dictwork LIA
-
8.5
0.6
Instal new ar achaust ductivotk Other (Descnbe in the apace below.
Use Bid Item 10 if necessary) LM Indicate Unit of Measure Below ' 9 - SANIIARY & WATER SYSTEMS ITEM DESCRIPTION SIZE UNIT Of MEASURE QUANTITY UNIT PR/CE. ($ US) 0 ITEM COST (S US)
•
.
•
•
CPA CONTRUCTION PROJECT BID SHEET
9.1 tnsta5 new Eastern style toiel Each 2 50.00 100 .
9.2 Eadi
Install new Western so* tnlet
9.3 Test and clean &Briery drain pipes Each 2 10.00 20 Instal new swam dnin pipes
9.4 (Werth, diameter and OW . _LM 12.00
9.5
9.0
9.7
Clean and repair adding septic tanks (to include new oiJp hatch covers)_ Instal new septic tank (to indudoTt locking hatch covers) Remove eidstIng septic tanks and manholes Instal new porcelain sink with shut-off valves EaCh 0 Each 0 _...
Each 0
Each 7 150.00 1050
_
9.5
Minas new water pipinp (specify skid and type le. PVC. Meet copper...) LM 0
9.9 Instal new main shut-off v Beth 1 50.03 50 tie Instal bacidlow prevention valve Ew 1 90.00 90 9,11
9.12
Instal new plastic water tanks Other (Describe in the space below.
Use Bid Item 10 if necessary)
-
Each
Indicate Unit of
Measure Below
1 375.00 375
0
Instal shower unit 2
150.00
300
Water pen" Bath
I
145.00
UlIflof
O. Mint BID ITEM ITEM DESCRIPTION SIZE Provide armed secuty persomei 24 hours per day during Pe entire
10.1
duramn of the contract DAYS M1ME QUANTITY UNIT PRICE (S US) 145 ITEM COST (S US)
-
-
10.2
Replace Idlchen lablalaherf ___L Each 150 00 0
10.3 0
10.4 0
10.5
0
_ ____
10.0 0
. _ _ . . -
10.7 0
105 0
10.9 0
10.10 0
10.11
0
10.12
0
.
10.13
_ . .
. - -
-
10.14
0
10.15
Eatlamaed MD PRICE:
•
•
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by the CPA Action Officer) CPA PROJECT NUMBER:
CPA PROJECT TITLE
BID ITEMS
Reception Building
i - PERIMETF-R SECURT1Y
UNIT OF
MEASURE QUANTITY
UNIT PRICE
(8 US)
ITEM COST
g OIL
-- ------ -
ITEM DESCRIPTION SIZE
Repair perimeter war (concrete or
1.1 bnck construction)
SM 0
_.
Contend new penmeter well
1.2
concrete or brick construction) SM Construct Precast ete perimeter .
yell SM 0
I
1.3 Repair perimeter fence (steel)
1.4 Construct new perimeter wal (steel) SM 0 Construct new steel crein nic fence 3 meters high Instal steel c5g plates 1 meter high LM
1.5 Repair entry/exit gate
1.6 Instal IIIIV/ entntadt gate Each 0 Vehicle 'Say Poi1 Each 0 Men Tear Port* 0 Mad razor wire on existing fence or
1.7
1.8
1.9
1.10 well
Prepare &clack and paint existing gates or fences with 1 coat primer and 2 coats oil paint Prepne anace and pant existng 2 pedniter wall with coats water based pant (latex) 05W (Describe In the space below.
Use Bid Nem 101 necessary) LM SM 0 Ski Indicate Unit or Measure Below
- —
0
Complete structural concrete gtd tower weft steel roofing Each 3510.00 UNIT OF MEASURE QUANTITY US) UNIT PRItt— (inriiitar - ($ US) 2 SITEWORK ITEM DESCRIPTION SIZE Remove and dispose oft site 8 11181
2.1
and debris SM 0
Dernolsh dna:lures unsafe and
2.2
fIspose or al debre
0
Gradrig and leveling of ground (to include removing prntruckng °Maces
2.3
from ground)
0
_
Rep ar asphalt pervements or
2.4
walkways
0
Replace asphalt pavements or
2.6 walkways SM 0
Repair concrete pavements or
2.03
walkways SPA
0
Replace caste pavements or
2.7
%rollmop 0
— -
Repw other twe of pavernents or
2.8
twilkways Set
0
2.9 Other (Describe In Me apace below.
Use 1310 hem 101 necessary) Indicate Una of Measure Below 0 Construct concrete only steps Each 3 160.00 450 Construct concrete witty remp Each 4C0.00 0 UNIT OF war PRICE (I 1Tni COST 3 FLOOR SYSTEMS ITEM DESCRIPTION SIZE MEASURE QUANTITY US) al US) Pressure wash and dean existing
9.1
floors SM 309 1.00 309
Remove and depose damaged floor
3.2
covereva SM 1.00
-- 3.4
as Instal new Door coverings SM 15.00 Repair structural* damaged floor slate SM 16.00 0
• CPA CONTRUCTION PROJECT BID SHEET
•
•
•
Instal new reinforced concrete floor
3.5
slab (specify thickness le bid) 3.6 Other (Descrthe In the space below.
Use Bid Item 108 necessary) S74,1 indicate Unit of Measure Below 0
-
Repar stairs
-
Instal stairwey reifiWo - - 15 00 .
SM -
l.k4
UNIT OF
MEASURE QUANTITY
18.00
UNIT PR/CE (S
US)
1
0
0
0
ITEM COST
(SUS)
4 - wALL 8 CEILING SYSTEMS ITEM DESCRIPTION SIZE
4.1
4.2 nee
4.3
4.4
.
_
4.5
Illitliiiiiiii
14:1111 1111111
W itn a
fl. i I. 4 WiNi
li' i if V411
_
SM
4.00 4640
1 II
SM 2.00 0
SM 40.00
0
4.8 SM o
4.7 Other (Describe in the space below.
Incicat• Unit of
Use Bid Item 10 if necessay) Menem Below .
Fl In wall openings SM 40.00 o 0 Instal suspended aping SM 10.00 Remove suspended ng BM 2.00 MIT OF
5. ROOF SYSTEMS ITEM DESCRIPTION 8
MEASURE QUANTITY
tileT PRICE IS
US)
0
ITEM COST
(i US)
5.1 5.2
Reseal pints around roof 64e3 MOON and Niel damaged Or WA 'Ruing roof was 30.00 0
5.3 Repair parapet stalls. fascia, or eaves SM
5.4 Irtatal new steel roof panels 18.00 0
5.5
Clear roof drain ard downspout Each
5.0
Instal new roof drain
5.7 Instal new downspout
5.8 Other (Describe W the space Debar/ Use Bid HOM 10 N neoessary) 10 80.00 800 F Indicate (Aat of Measure Below 6 - DOORS & WINDOWS mu I UNIT OF I MEASURE GUMMY Wirrill= (C US) 0 !mincer ($ US)
8.1
8.2
DESORPTION
Metal new wooden holloware door (Ape* size) Oath 14 30.00 420 Install new wooden door frame (specify lial) 0
6.3 Instal new steal *or (spodY Mu* Each 3 50.00 150 Steel double door Each 100.00 84 ligh waft steel Mrs Eath 150.00 Instail new steel door frame (spa* size) Oath 17 35.00 595
6.5
Stesi doubt, door tram Eodi 100.00 bola new deadboll lock and (welsh 3 sale of 1, is Oath 17 10.00 170 Lock seller high Security steel bars door Oath 25.00
8.8
Paint existing ratiOr (1 coat primer a 2 baits oil paint) Install other type of door (mar* atm and type Sr bid) Bathroom sbal doe( Oath 4 20.00 80
• CPA CONTRUCTION PROJECT BID SHEET
6.7
6,8
6.9
Remove broken window glass and replace with new is In existing frame SM 0 Prepare rough opening in wall and Install new wriday frame and glass I (specify size en bid) Each 16 40.00 Frame only Each 25.00 !retail steel secuity bars (burglar bars) on window Eath 16
25.00
FM Neuf*/ steel Mrs Esth 50.00 filo pearl evisring windows
8.11 Pant existing whitlow frames &12 Other (Oeschbe In the space below.
Use Bid item 10 W necessary)
•
•
0
SOO
o
0
EA
Indic:MUM of
Measure Below
o
1 - ELECTRICAL SYSTEMS ITEM DESCRIPTION S1
UNIT OF
MEASURE QUANTITY
MIT PRICE
US)
(8
0
ITEN COST-
(8 US)
7.1
Instal new surfaoa-mounted electrical raring (specify wire type 6 diameter) LM 72 In new dechti outlet Each 56 17.00 960
7.3 Metall maw wall snitch 18.00 468
- - -
7.4 Mel new losresoent WI Mune Eadi 40 40.00 1000 Init.P.. 1 0 1 .0t8 EadI,
17.00 0
7.5
7.8
Instal new Meng ten
Instal new telephone cable (Imps parr) Eadi 14 40.00 560
7.7 Metal new taleshone jack Eadi 11 40.00 440 Insist new circuit breaker (specify
7.8
type and capacity)
Esdi 13 10.00 130
Metall new cinauft breaker panel ' - (speedy number of breakers and
7.9
capacity)
I 0.00
Install new lisolation soot& (specify
7.10 Eadi 250.00 0
twe and capacity)
Instas new mans oansfonner (spay
7.11
§pe
and capacity)
,
Instal new mains citing Mindy type
7.12
and Mks) 0
100101 new MactrIcal generMor trath changeover match (specIfy make,
7.13
model. and capacity)
Install new fuel tank for' generator (with capacity to operate generator for
7.14
72 110Ulb aintinuously)
Install new exterior security lighiing
7.15
(cicifi type rid size) on Oddly' Eudi 0 Install new exterior security lighting (spedIty type and sae) on parkneler well Each
7.16 'Other (Driscnbe el the space below.
Use Bid lieni 10 it necessary) Indlcale Unk of Measure Below um- rt OF MEASURE QUANTITY UNIT PRICE US) o (8 ITEM COST (8 US) 8 • MECHANICAL SYSTEMS ITEM DESCRIPTION SDI Instal new window alr conditioning
6.1
wit (specify number of watts/amps) Eudi 12 450.00 5400 Install DOW spirt alr oordlonIng unit I 9.2 (specify number d tons) Suds o 1 6.3 Instal new exhaust fan and ductwork
8.4 Install new air supply ducIncrk
8.5 Install new air exhaust ductwork LOA 0
8.6 Other (Desabe in the space below.
Meals thilt of
Use Bid Item 10 if necessary) kleastme Below 0 -
•
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
I - SANITARY 5 WATER SYSTEMS ITEM DESCRIPTION SIZE
UNIT OF
MEASURE QUANTITY
UNIT PRICE ($
US)
ITEM COST
(S US)
9.1 Install Raw Eastern style toilet Each 4 80.00 320 _
9.2 Instal new Western styte tolet Eadi 0
9.3 Test and dean semidry drain pipes Each 2 10.03 20 Install new sanitary drain pipes 94 LAI 12.00 0 (specify diameter and type) Clean arkl repafr existing septic tanks
9.5
(to mats* new locking hatch coversL Each 0 nstal nee septic bilk (to include
9.8 Each
locking hatch °rivers)
Remove existina septic tanks and manholes Each 0 Wail new porcelain sink nth ahut-off
9.7
vaNsis Eacfi 4 150.00
600
9.8
Instal new vaster piping (apadly dos and twe Le. PVC, sled, copper...) IM o
9.9 Instil now main shd-oll valve Each 1 50.00 50
9.10 InsteP baddlow prevention rake Each 1
99.00 oo
.
1
9.11 Instal nevistic water tanks Each 375.00 375
9.12 Other (Ninths in the space below.
Indlcate Unit of
Use Bid Nam 10 If necessary) Measure Below 0 MIMI ahcreor urit Each 150.00
- - -
0
Water pump Each 1 145.00
UNIT OF
MEASURE QUANTITY
UNIT PINCE (5
US)
145
MN COST
(9 US)
10 - OTHER BID ITEMS 11E11 DESCRIPTION SIZE
Provide armed security personnel 24 hours per day during the andra
10.1
duration of the contract DAYS 0
10.2 Rodeo° Idichen tableishat Each 150.00 0
10.3 0
_ .
10.4
- - ---- - • -- - -- ----- --
- • -
0
10.5
- --- --- - - - - --
- - -- -
0
10.8
0
10.7 0
10.8
0
10.9 0
10.10 0
10.11 0
10.12 0
10.13
-
10.14
0
10.15
Edlassaid BP CE 20588
_ _ _
• CPA CONTRUCTION PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by the CPA Action Officer) I CPA PROJECT NUMBER:
•
CPA PROJECT TITLE:
Staff and Regional Headquarters Build ng BID ITEMS UNIT ON UNIT PRICE ITEM COST 1 - PERIMETER SECURITY ITEM DESCRIPTION SIZE MEASURE QUANTITY (6 US) (S US) Rep & perimeter rag (concrete or
1.1
Wet construction)
Construct new pedrneter wig
1.2
(concrete or brick construction) SM 0
*instruct Precast concrete perimeter SM 0
1.3 Repair perimeter fence (steo) SM 0
1.4 Construct new perimeter wail Oriel_ SM 0 CA11150UCl new gee! chain It* fence 3 meters high SM 0
•
kistal steel dig plates 1 meter high 0 — ----- --
1.5
Repair entry/Mt pale
1.6 Wel new entnjtfealt gate E.di 0 Vehicle 'Salty Parr Eadi 0
1.7
1.8
1.9
1.10 Instill razor wire on wasting fence or wall LM 0 Prepare surface and paid 'existing gales or fences with 1 coat primer
•
a112 coats col paint
Proper* surface and paint existing palleler wall with 2 coats mter bleed paint (latex) SM 0 Other (Describe in trie space below.
Indicate Una of
Use Bid Item 10 N necessary) Measure Below 0 _ Complete structural concrete-gtmd Esdi Goer with steel roofing 3610.00 UNIT OF MEASURE CAAN11TY UNIT PRICE (3 US) 0 ITEM COST (3 US)
•
2 SITEWORK ITEM DESCRIPTION SIZE
'Remove and dispose off site all trash 21 :and deixis SM 0 Dentoish insole structures and
2.2
depose of all debris
LS
0
Garay and leveling of ground (to Include nenoving protruding objects
2.3
from gmund) gar 0
Repair asphalt pavements or
2.4
walkways SM 0
Replace asphalt pavements Cr 2,5 wetemys SM 0 Repair concrete paventerils or
2.6
walkways
Replace canasta pavements or
2.7
waikviaAnt
Repair other type of pavements or
2.8
tvalkways SM
2.9 Other (Describe in toe space below.
Use Bid Item 108 necessary) Wale UM of Masan Below Construct concrete entry steiii Each 2 1%00 Construct concrete Gray ramp Each 400.00 0 UNIT OF UNIT PRICE ($ ITEM COST
3- FLOOR SYSTEMS ITEM DESCRIPTION SIZE
MEASURE OUAN1I1Y
US)
(3 LIE)
Pressure wash and dean existing
3.1
floors SPA 750 1.00 750
Remove and dispose damaged fleet 32 eovenngs EN 160 1.00 150 _ .._ _ -- __
3.3 Mai new floor coverings SM 150 15.00 2250 Repair elruclurally damaged floor
3.4
Nibs SPA 3 15.00 45
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
35
3.6
Instal new reinforced concrete floor slab (speedy thickness in bid) Oew (Describe in the space below.
Use Bid Item 10 if necessary) ; SM , Indicate Und of ' Measure Below , , SM Repair ' stairs 2 15.00 30 _ LM Instal stairway rag 6 11.03 109 UNIT OF UNIT PRICE (11 REY COOT 4 - WALL tl CEILING SYSTEMS ITEM DESCRIPTION SIZE MEASURE QUANTITY US) (6 US) Remove damaged pastel front brads or ceilings and repair with mortar
4.1
andfor gypsum plaster as required Prepare wall or carte solace, apply 1 coat primer/sealer and 2 coatis ndex 42 (water based) pant SM
4.00 0360
Prepare woe or coiling surface, apply 1 coat primer/sealer and 2 coats oil
4.3
based pare
SM
0
DOMOklil unsound wells I carps and
4.4
dapose of all debris SP/ ex ZOO 184 Sued new masonry wall weh
4.5
mortar/plaster fresh SM 39 40.00 1560 Remove damaged ceramic de vral
4.6
covering and ko36 new dies Sal . f)
4.7 Other (Describe in Me apace baba,.
_
Indeed Unit d
Use Bid !tern 101 necessary) Measure Below 5 - ROOF SYSTEMS ITEM DESCRIPTION SIZE 0 FM in wall openings SM 9 40.00 300 regal suspended wing SM 10.00 0 Remove suspended aping SM 1 2.00 0 UNIT Of UNIT PRICE (3 ITEM COST MEASURE ClUANTTrY US) (8 US)
5.1 Reseal Joints around roof tiles Ida Replace and seal damaged or 52 missing roof des SM 30.00
5.3 Repel parapet web, feeds, or eaves SM 0
5.4 Install new steel roof panels SM 16.00 0
5.5 Clear roof drain and downspout Each 0
5.6
Instal new roof &gin
5.7 Instal new downspout 1_ Each 8 80,00 640
5.8 Other (Describe in the space below Indicate Unrt of Use Bid Item 10 it necessary) Measure Below
6- DOORS & WINDOWS ITEM DESCRIPTION SIZE
1 ----urer OF
I MEASURE QUANTITY
UNIT PRICE
US)
0
(l ITEM COST
(3 US)
Install new wooden below-core door
0.1 (specify sae) Each 30 30 00 Instal new wooden door frame 6 2 (specify sire) Each 0
8.3 Instd new deal door (sped( y size) 12 50.00 . Steel double door Each 100.00 0 _ 119gh security steel bets Each 150.00 0 Instal new steel doorframe (specify 64 size) 1470
-
Steel double door frame
Each 100.00
ilnetal new desdboll lock and furnish 3 as legs of keys Each 42 10.03 420 Lock set for high security $teel bars door Each 25.00 0 Paint adding door (1 coal primer + 2 !coats od point) SM 0 lInstal otlw type of door (specify
8.6 lend type in bid)
;Bathroom stall door Each 4 80
20.00
• CPA CONTRUCTION PROJECT BID SHEET
•
•
•
6.7
68
89
--- -
Remove broken wrickvis glass and replace with new glass in vesting frame Prepare rough opening in wal and instal new window frame and glass (specify size in bid) Frame only Install steel security bars (burglar bars) on viinclow , I SM 42 40.00 11360 Each 25.00 Each 42 25.00 1030 High security steel bars Each 50.00 0
0.10
Goan existing Modems
Sal 0
---
6.11 Pail misting window frames
6.12 Other (Desaibe in the space below.
'
(i.e BM Item 10 if necessary) EA o Indicate Una of Measure Below
7- ELECTRICAL SYSTEMS ITEM DESCRIPTION SIZE
UNIT Of
MEASURE QUANTITY
--
7.1
Instal new surface-mounted elecalcal vking IsPecrlY wee type 1 diaqr/ LM Install new eleancal outlet Each 72 1 58 0 UNff PRICE (3 ITEM COST US) IS US) 0
17.00
986
7.3 Install new wal switch Each 18.00 1368 76
7.4 Install new nourescent light fudure Each 72 40.00 2880 . __ ..
, VII
7.12
Instal nightlghts Each 17.00 0
7.5 Install new ceiling tan Each 20 40.00 800 _ Instal new telephone bio (single
7.5
pair)
Each
0
7.7 Instal new telephotos tack Each 10 40.00 400 bad dull breaks' new (specify 72 type and capacity) Each SS 10.00 360 Instal new drcult breaker panel breakers (speay number of and
7.0
capacity)
Each
1 750.00 750
Instal new isolabon swath ispecxy
7.10
Each
type and welly) 250.00 0
Instal new mins tante:miler (Keay IIP0 and - _ Each 0 Instal type new mains cabling (specify and slat) LM 0 Instal new electrical generator wet changeover switch (specify make,
7.13
model, and capacity)
__. ---
• --- - - --
inital new fuel talk for generator .-
---
(with capacity to operate generator ix
7.14
72 Mum continuously)
Each
0
Instal new exterior security lighting
7.15
type 2ild size) Calbuklings Each 0 Instal new exterior security fighting (specify we and size) on perimeter wal Eacri 0 _ .
7.10 Other (Descnte in the space below.
Indicate Lint of
1.100 8i0 !tern 10 it necessary) Measure Below _ UNIT OF MEASURE 1 QUANTITY 0 'UNIT PRICE (8 rrEhr- cosT US) (3 US)
8- MECHANICAL SYSTEMS ITEM DESCRIPTION SIZE
Mad new mono., an conernoning
8.1
unit (specify number of wattsfamps) instal new split air conating and
6.2 Each
(specify wittier sif tons) EarN 20 450.00 53 Instal new exhaust fan and ductwork Let 9
8.4 Instal new *supply duchvork Let I m indicate unit of Measure Below 0 0 a 85 algal new alir exhaust ductwork 8.6 Other (Describe en itia space below.
Use Bid ttern 10 1 necessary) UNIT Of
9- SANITARY 6 WATER SYSTEMS ITEM DESCRIPTION SIZE
MEASURE QUANTITY
UNIT PRICE
US)
0
(5 - ITEM COST
(S US)
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
9.1 Install new Eastern style toilet Lodi 11 80.00 880 _
9.2 Each
Instal new Western style toilet 0 Each 8
9.3 Test and clean sanitary drain pipes 10.00 so Instal new sanitary drain pipes 94 (specify diameter aid t) Lm 12.00
9.5
9.8
9.7
Clean and repair existing septic tante (te indude new locking hatch coves) Eath instal new septic tank (to include loddng hatch covers) Each o Remove westing sends kinks aid modeles Each o WWII Ma porcelain she with shukaff valves Each 11 150.00 1650 as Instal new water piping (spa* atm and type Le. PVC. sleet copper...) 114 o GO Instal new main shut.oli vaNe Each 1 50.00 so
9.10 Instal baddlow prevention rake Each 1 90.00 so
9.11 9.12
Instal rew plastic water tanks Other in the below.
(Desaite space
_
Use Bid Item 10 it necessary) Each 2 375.00 750 Indicate Unit of Measure Below 0
-• - - • ____ .
__.._ _ .
Iiiiitd - shitril
Each --- -
- 9 150.00
1350
_
Water puij --
. - Each 1 145.00
145
UNIT OF
UNIT PPS= (il
111111 OM
10 • OTHER BID ITEMS ITEM , DESCRIPTION WM
MEASURE QUANTITY
US)
IS US)
Prattle aimed secunty personnel 24 hours day being Me per entire
10.1
duration of Vie contract
DAYS 0
10.2 Replace lichen tebisfehelf Each 150.00 o
10.3 0
10.4 0
10.5 0
10.6 0
10.7 o
las o
10.9 0
10.10 o
-,
lam o
------
10.12
. ..
10.13
-
10.14
o
10.15 0
Estimated BID PRICE. 43496
•
• CPA CONTRUCTION PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by the CPA Action Officer) CPA PROJECT NUMBER:
.
CPA PROJECT TITLE: Visitor's Center BID ITEMS I - PERIMETER SECURITY ITEM DESCRIPTION S INTOF MEASURE QUANTITY UNITPRICE ($ US) atm cosi- (5 US)
1.1
1.2
Repair perimeter wal (concrete or brier conetrudkin) SM 0 Constrict new perimeter wal (womb or brick construction) SM 0 Conshuct Precast accrete perimeter 12 Repair psdmstar fence (steel) SM 0 14 Cereired new perineler voil (Meet) ConaMuct new SIMI chin It* fence 3 meters high SKI Instal steel rig plates 1 meter high IN 0
•
15 Repair eierrtexil pate Lath 0
1.6 Instal new entry/radiate Vehicle "Sally Port' Lath 0 Man Sr Port' Ead, o Instal ruler wire on existing *once or
1.7
1.8
1.9
1.10 old
Prepare surface and mkt adding fences 1 pates or welt coat primer and 2 coats ci_paint Prepare surface and pant misting perirnter was vain 2 coats water based pant (latex) SM Other (Ciescnbe n the space below.
Use Bid Item 10 if necessary) Incicate Unit al Masson' Below SM 0 0 o Complete struchrol concrete guard toner tower with steel roofing Lath-- - --- - - - . - - - 3510.00
2- SITEWORK ITEM DESCRIPTION SIZE
UNIT OF
MEASURE QUANTITY
UNIT PRICE (S
US)
0
ITEM COST
IS US)
2.1
Remove and dispose off site all basil and clink 0
•
2.2
2.3
2.4
Dernoash unsafe structures and dispose or al debris IS C Gracing and toning of ground (I0 Include removing protruing obiects from gmund) SM 0 Repair asphalt pavements or voileveis SM 0
2.5
RNA= &What Pavements or
VA108811/8 SM 0
_ _ ___ ..__........
Repalr concrete pavements or
2.6
walkways
Replace ooncrete pavements or
2.7
walkways esteweti SM 16 400.00 MOO Repair other type al pavements Of
2.8
Valavays DA 0
2.9 Other (Desalbe lathe space Wow.
Wrote Lk* of
Use Bid Item 10 V necessary) site Below Construct comets enby rasps Fach 2 150.00
3. FLOOR SYSTEMS ITEM DESCRIPTION SIZE
Each -
Constnal concrete entry ramp 400.00 o UNIT OF UNIT PRICE (8 MEASURE QUANTITY US) ITEM COST (i US)
3.1
Pressure wash and dean existing floors SM 378 10X) 376
3.2
Remove and depose damaged loar coverings SM 1 .00 o . .
.
3.3 kshill new floor covenngs SM 378
15.00
Repair structuraily damaged floor 34 dabs SM 15.00 5640 0
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
35 3E lasted nevi reinforced concrete floor stab (specify thickness in bid') Other (Describe in the space below.
Use Bid Item 10 if necessary) SM Indicate Unit of Measure Below Fir.par stairs SM
15.00
0
. ... . .
Install stainomy raiing
LM
18.00
0
UNIT OF
UNIT PRICE
(S ITEM COST
4 - WALL 8 CEILING SYSTEMS ITEM DESCRIPTION SIZE
MEASURE QUANTITY
US)
(S US)
Remove damaged plaster from walls or ceilings and repair Met mortar
4.1
endfor gypeum plaster as replaced Prepare well or ceding surface, apply 1 wet *nor/sealer and 2 coats latex 42 SM 4.00 (water based) paint Prepare wall or oaring surface, apply 1 coat primer/sealer and 2 coats 01
4.3
based paint
.. _ ..
..__ .. .
Demolish unsound wile / ceilings and 44 depose ot al debris SM 4
2.00
8
Btild new masonry imil trodh
4.5
mortarmiaster finish SM 18 40.00 640 Remove damaged ceramic Me wel
4.8
_ ___ _._.
meting and Instal new lies SM __ _
4.7 Other (Describe in the space below.
Waite Unit of
Use Bid Item 10 if mammy)
Measure Below
Fri in wal openings SM 40.00 Instal suspended SM 322 10.00 5 ROOF SYSTEMS ITEM DESCRIPTION SIZE Remove suspended oil% SM 2.00 UNIT OF MEASURE QUANTITY UNIT PRICE US) o 0 3220 0 (S ITEM COST (S US) 5,1_ 52 Reseal joints around roof tiles SM 0 Replace and seat damaged or missing roof lies SM 30.00
5.3 Repair paraptit wags, fascia, or eaves
5.4 SM 390 18.00 6240
Instal new steel roof panels
5.5 Our roof drib and cbanspott Eadi o ._...... .
-
5.6 lnsteinawtootd,adr Each 0
5.7 Install new doemspoul Each 4 80.03 320 SB Other (Describe in the space below.
Indlcale Ur& of
Use Bid Item 101 necessary) Messrs, Below S - COORS& WINDOWS ITEM DESCRIPTION S UNIrOF MM3ayp. QUA,NTf7Y IINITIPRICE US) 0 (5 ITEM COST (5 US) I 6.1
8.2
Instal new wooden hollovr-core door (specify size) Each 3 30.00 90 Instal new wooden door frame (specify size) Each 0
6.3 Instal new steel door (aw* size) Each 2 50.00 100 Steel double door Each 180.00 o
8.4
Nip wady Awl bora Each 150.1:0 WM new seed door flame (specify dm) Each 5 35.00 175 Steel doubM door Mane Each 100.00
8.5
8.6
NM new dembolt lodt end furrdsh 3 sets of keys Each 5 10.00 50 Lock set for high secully sled has door j Each 25.00 Paid dzor + 2 soloing (1 ooet primer costs oil paint) SM 0 Install other Ape of door (specify size and twe In bid) Each 16 Bathroom stet door Each 20.00 0
• CPA CONTRUCTION PROJECT BID SHEET
8.7
8.8
Remove broken window glass aid replace wIth new glass In existing :
frame I
Prepare ' In wall and ,
- raugh -opereng -
instal new vilidow frame and glass Each (specify size in bicl 18 40.00 040
6.9
From onI Lath 25.00
Metall steel escudy bars (bailor bars) on window Each 15 25,00 .
_
0
400
HO nosily Masi bars 50.00 0
-
8.10 Caen adstag windows
1 8.11 Paint existing window frames 1 8.12 Ober (Describe in the space below Use Bid item 10 if necessary)
-
EA
.
Indicate Unit of
Measure Below
0
_ ....._ -
7 - ELECTRICAL SYSTEMS ITEM DESCRIPTION SIZE
UNIT OF
MEASURE QUANTITY
UNIT PRICE ($
US)
0
ITEM COST
(i US)
7.1
Instal now surface-mounted electrical Wring (spedly wire ma & diameter) 1.51 0
•
7.2 Instal new dectrial add Each 25 17.00 425
7.3 Instal new sal coach Lath 30 18.00 540 i i 7.4 Install new flourescent lght fedure Each 21 40.20 Instal righalghts Each 17.00 840 0 _7.5 __ ....
7.6
Instal MPH Install new telephone cable (single Pak) Esdt Eath 9 40.00 300
-- . _ _
- •-•
•
7.7 Install new telephone Jack Each 1 40.00 40 Install new circuit breaker (specify . 7.8 We end caPadiY) Each 4 10.00 40 Instal new drain breaker panel (specify number of breakers and
7.9
capacity) Each 1 760.00 750 Install new isolation switch (specify
7.10
type and capacity) Lath I 250.00 250 Instal new mains trausformer (specify
1.11 Each 0
type and capacity)
Install type
new mans cabling (specify
L7.I2
-
and size)
IA
Instal new sioctrbeigenirior with changeover switch (spedly make,
7.13
modal. and capacity)
Each 0
new fuel tank for generalor OM capacity to operas generator tor
7.14
72 hods continuously)
__....
Instal new exterior seciiitillithbng 1 7.15 '(specity type arii St7f1) on takings E.ad% .....
! Instal new exterior seas* Ighting (specify type and size) o 0 0
7.18
Other (Describe in the - ace sp - . below.
Use Bid tern 10 if necessary) on pedmeler rell Each Indocile - Unit of Measure Below UIST-OF MEASURE QUANTITY UNIT PRICE ($ US) 0 ITEM COST (8 US)
5- MECHANICAL SYSTEMS REM DESCRIPTION SCE
Install new window at conditioning
8.1
unk (specify number of iratts/cmps) Lath 7 450.00 3150 Install new split air conciliating unit 82 Eath 0 umber (specifi of tons) _
8.3 Instal new exhaull Ian alai dudgeon( 84 Install now at supply ductwork
- Lid
_ _ ._
3.8 8.6 Install new air exhaust duchvora Other (Describe in the space below.
Una Bid Item 106 necessary) Lid LM Indicate Unit of Measure Below . -
- --I
- --L.
0
0
0
•
9 - SANITARY & WATER SYSTEMS ITEM DESCRIPTION
UNIT OF
SIZE 1 MEASURE QUANTITY
UNIT PRICE (S
US)
0
ITEM COST
($ US)
•
CPA CONTRUCTION PROJECT BID SHEET
-
•
•
9.1 Install new Eastem style idiot Each 8 80.00 040 ) 9.2 Instal new VVestem style toet Each 0
9.3 Test and dean sanitary drain pipes 10 10.00 100 Instal new sanitary draw) pipes
9.4
(specify diameter and type)
12.00
9.5
9.8
9.7
Clean and repair existing sepTIC tanks (to indude new lcdting hatch covers).
Each
Install new septic tank (to include locking hatch covers) Each 0 Remove exislIng septic tanks and manholes Each 0 Instal new porcelain sink Wit shutoff waives
150.00 1200
9.8
Instal new water pipinp (sporty an and t)pe I.e. PVC. sleek copper...)
0.0 Instal nom mein shutoff valve Lath 1 60.00 00
9.10 Instill Mallow proven/on vahre Eads I 90.00 90
9.11 Instal new Mastic water tanks Each 1 375.00 375
9.12 Other (Descrbe In the space below.
Matte Unit of
Use 80:1 Item 10 5 necessary) Measure Woo . ..- - Instal shower unit Lath 150 00 Weer pump Lath 14500 0 UNIT OF UNIT PR/CE (8 ITEM COST
10- OTHER BID ITEMS ITEM DESCRIPTION
MEASU JAKTITY
US)
(S US)
Provide armed securtty persomel 24 hours per day during the entire
10.1
duration of the contract DAYS
10.2 Replace kitchen tadoehelf Each 160.00 0
10.3
10.4 0
10.6 0
10.8 o
10.7 0
10.8 0
10.9 o
10.10 0
10.11 0
10.12
10.13 0
10.14 0
10.15
Estimated BID PRICE: 36889
•
• CPA CONTRUCTION PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by the CPA Action Officer) CPA PROJECT NUMBER;
CPA PROJECT TITLE: BID ITEMS
!Kitchen and Recreation Building UNIT OF UNIT PRICE ITEM COST 1 - PERIMETER SECURITY ITEM DESCRIPTION SIZE MEASURE QUANTITY (S US 1 (8 US) Repair penmeter well (concrete or
1.1
dick constructlos)
hI4
_ _
Construct new perimeter wall
1.2
(concrete or brick construction) SPA 0 Construct Precast concrete perimeter* wall SM • 0
1.3 Repair-perimeter
1.4 Construct newpertmeterwat(sted) 4 .
corona new steel chaln NM fence 3 meters high SM SM o 0 Instal steel rig Naha 1 motor high LM o
1.5 Ftepeir entry/tuck g Lath 0
1.6 InNall new stilly/mit gate Lash 0 Vehicle "Say Port* Lath 0
1.7
1.8
1.9
1.10
Man 'Sett Port' Lath 0
Instal rum viim on eidetic fano* or wall OA 0 Prepare surface and paid existing gates or fences with 1 coat primer and 2 coats ail paint Prepare surface and paint evicting wailer wall with 2 coats water based paint (ides) Ski Other (Desaibe In the space below.
Use Bid Item 10 t necessary) Indicate UNt of Measure Below 0
-Ttomplete
structural concrete guard
— Each
. 3610.00
tower With steel rocirg
o
UNIT OF
UNTrPRICE (5
ITEliCOST
2 SITEWORK ITEM DESCRIPTION S
MEASURE QUANTITY
US)
IS US)
Remove and depose off site all trash
2.1
NM debris SM 0
Demolish wade structures and
2.2
dbspose of NI debris Ls
Grading and leveling of grand (to inducle removing protruding objects
2.3
from ground) --
SPA
- -- - - -
_ _ _____ — — —
Repar asphatt pavements or 2A virekways _ Replace asphalt pavements or
2.5
weilarays
_
....
Repair concrete pavements or
2.6
vat lavays
_
Replace concrete pavemerts or
2.7
walkways
. -J.-
Repair drier type of pa/monis or
2.8
wallavays
Ski
2.9 Other (Describe In the space below.
Indicate Unk of
Use Bid Item 10 If necessary) Measure Below 0 _ Construct concrete entry steps Each 4 150 00 Construct concrete entry ramp Each UNIT OF MEASURE QUANTITY 400 tx) UNIT PRICE (8 US) 0 ITEM COST (8 US)
3- FLOOR SYSTEMS ITEM DESCRIPTION SIZE
Pressure wash and clean existing
3.1
floors SPA 575 1.00 575
Remove and &poem damaged floor _ 32 .
coYock.W.
437
1.00
. _. ,
3.3
3.4
Instal new floor coverings 1 SM 437 15.00 6555 Repair stsuchrak damaged floor 1 slabs SM 16.00 0
•
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
._.
3.6
3.6 Well new reinforced concrete floor silt (specify thickness in bid) Other (Desaibe in the space below.
Use Bid Kern 104 necessary) SM Indicate Unit of Measure Below Rep* sten SM
15.00
0
Instal Maw* riding
LM
18.00
0
UNIT OF
UNIT PRICE IS
ITEM COST
4-WALL & CEILING SYSTEMS ITEM DESCRIPTION SIZE
MEASURE QUANTITY
US)
(S US)
Remove damaged piaster from WAS or ceilings and repair with mortar
4.1
and/or gypsum plaster as required Prepare WWI or ceiling surface, apply I coat Omer/sealer and 2 coals telex SPA (water based) paint 521 4.00 2064 Prepare wail or ceilbg surface. apply 1 coat Omer/sealer and 2 coats oll
4.3
based pas* SM 0
Demolish unsound walls / celibms ald ' 44 dispose of an debds 9 2.00 18 Bald new masonry well with
4.5
motto/plaster finish SM 19 40.00 760 Remove damaged ceramic tee we. 1
4.6
covering and Vista new ties SM t7 Other (Dheats In Me space below.
incloste Unk of
Use Bid Item 10 Ineoessam) Measure Baas Fll In wal openings 811 40 00 Motel suspended °sing
10.00
RITMO Stlepended cellni) OA 437 2.00 5 - ROOF SYSTEMS ITEM DESC26PT1ON SIZE UNIT OF MEASURE QUANTITY UNIT PRICE ($ US) 0 _0 874 ITEM COST (S US)
5.1 R*4610190 wound roof Ilse 81A _ Replace and sed damaged Or
5.2
naafi" root has SM 30.00
6.3 Repair parapet wele, feeds, cc soma
- t
-
5.4
Install new steel roof panels SM 16.00 0
5.6 Cher roof drain and downspout 0
5.6 Instal new m01 Mu
5.7 install new downspout Each 6 80.00
5.8 Other (Describe in the specs below.
Indicate Unit of
Use Bid kern 108 maims*
'Mosul, Below
0
UNIT OF
UNIT PRICE ft
ITEM COST
8- DOOFtS & WINDOWS SEEM DESCRIPTION SIZE MEASURE QUANTITY US) (6 US) Install new wooden holow-oure door
6.1
specify size) Each 30.33 0 Instal new wooden door frame
6.2
(spedly ohs)
03 Install new Mml door (S Each 8 00.00 400 Steel double door Each 160.00 o High security abet bers
150.03
:Install new Meal door frame (specify OA 35.00 ishe)
0.5
116
Steel double door frame Each
100.00
Mai new deedbok lock and furnish 3 sets of keys Ei 6 moo 60 Lock set for high security steel bars door Each 25.00 Pant *sang cbot (1 coat pirner + 2 coats off mint) Instill other type of door (seedy she and type in bid) o Ballroom Mal door Each 5 MOD 100
S CPA CONTRUCTION PROJECT BID SHEET
8.7
_
89
--
6.9
Remove broken window glass and replace with new glass in existing frame
-;
Prepare rough °peening in well and i Install new window flame and glass ' (specify size in bid)
--
---
Frame only
Instal steel security bars (burglar bars) on window 864 ...._ _ Lath Lath 30 ..40410
25.00
0
975
. _-
. ,
25.00
High security steel bars Eadi 30 mad 1950 .
810
Clean exisung mislays
0
8.11 Paint existing window frames 6.12 Other (Describe in the space below.
Use Bid Item 10 if necessary) EA Indicate that of Measure Below
7- ELECTRICAL SYSTEMS 1Eid DESCRIPTION SIZE 0 UNIT a UNIT PRICE ($
- 1rt11/1 COST
MEASURE QUANTITY
US 1
($ US)
7.1
InS66 new surface-mounted electrical wiring (specify was type 6 diameter) LM 0
•
,
Lath 20 17.00 340
._ _ ..
_
7.2
72
7.4 Instal new elecbIcal outlet Lath 14 16.00 252 Instal nair Oarsmen/ 108 Mire
40.00
.
Instal new Ouldised yanielproof %his Eath 30
200.00 7800
Instil nIghtliates Lath 38 17.00 646
7.5
halal new cal% fan Lath 21 40.00 040
•
Metal Nano men etdostrie Lath 21 100.00 2100 Metal new telephone cal* (alnale
7.8
peir)
Eath
0
.. .
_
7.7 1 40.00
Instal new teleyhtme jack
Each
40
Instal new circuit breaker (specify 79 bps and capacity) End. 7 10.00 70 Instal new circuit breaker panel (speedy number of breakers end
7.9
capacity) „.._
750.00 750
HMO new isolation switch (specify
7.10
type and capacity)
Lath 1 250.00 250
iltStall new mans transformer (specify'
7.11
type and capacity)
Endt
Install now mains cabang (specify type
7.12
,
7.19
and Cm)
0
o
Wel nem electrical generator With dmageover switch (specify make.
model, and capacity) Lath 0 Instal new fuel tank for generator (with capacity to operate generator far
7.14
72 hours cordInuouso
_
Instal new exterior security NNW
7.15
type and size)
_(5recily ... on blatillAis Lath __.__- Insist new exterior security Warp (specify type and size) on pearnelar teal Each
7.16 Other (Describe in the space beim.
Use Bid Item 10 if necessary) Indcate Unit of Measure Below UNIT OF MEASURE QUANTITY Limy PRICE (s US) 0 ITEM COST (9 US)
8- MECHANICAL SYSTEMS ITEM DESCRIPTION SIZE
hetet new window air conditioning _ _
8.1
82
tall (specify number a vwitshimpa) 450.00 0 Instal new spat se condaring une (specify number of tans) 0
8.3 Instal new Wont fin and ductwork Lid 0 ' , :8.4 Instal new air supply ductwork LadS LM
-- - -
85 Instal new sir admust ductvArk Lid 0
•
•
CPA CONTRUCTION PROJECT BID SHEET
8.6 Other (Desaibe ii the space below.
Use SKI Item to ! necessary) Indicate Unit of Measure Below 9 - SANI TARY & WATER SYSTEMS I1 DESCRIPTION SIZE UNIT OF MEASURE QUANTITY UNIT PRICE US) 0 ($ ITEM COST (1 US)
9.1
_... _
Instil new Eastern style WM EadI 5 80.00 ....
9.2
Instal new Western style toilet Beth 0
9.3 9.4
Ted and clean eanimy drain pipes
10.00
70
_
Instal new salary Man plpes LM 3
12.00
(specify diameter and type) 36
9.5
9.0
9.7
Clean and repair existitg septic tanks Do include new locking hatch covers) Beth 0 Instal new septic tank (to Include lacking latch covers) _.
Remove mdsIng septic tanks and manholes o Each Mahal new port:Mein sink with ehut-off valves Each 15000 750
9.3
Instal new water piping (specify size end typo i.e. PVC, steel, copper...) _
9.9 Install new main shut-oft valve 1 50 Each
50.00
0.10 Instal beddlow prevention valve
90.00 oo
9.11 MOM new plastic water tanks 1 375.00 375 Each
9.12 Other (Describe in the space below.
laicals (hit of
WO Bid Item 10 d neoessaiy) Moon, Mow MOO shower unit
150.00
Each
Water pump I 145.00
10- OTHER BiCS ITEMS ITEM DESCRIPTION SIZE Provide armed security personnel 24 hours day during the per entire
10.1
dualico of the centred
UNIT or
MEASURE QUANTITY
UNIT PRICE
US)
145
($ ITEM COST
(1 US)
DAYS 0
-
102
Replace Mervin tabierseea
CM 7 150.00 1050
- -- -
102 0
--
10.4 0
10.5 o
- 10.8
o
10.7
10.8 0
10.9 o
10.10 o
10.11 0
10.12 0
10.13 o
10.14
0
_ .
...
_
10.15
Estimated BID PRICE; 32002 _
• CPA CONTRUCTION PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by the CPA Action Officer) CPA PROJECT NUMIDEFb CPA PROJECT TITLE:
BID ITEMS
Entrance Guard Houses
UNIT OF
UNIT PRICE
ITEM COST
I - PERIMETER SECURITY nu DESCRIPTION SIZE MEASURE QUANTITY (5 US) (S US) Repair penmeter wall (concrete et
1.1
brick construction)
_
Consauct now podnisior owl 12 (concrete or bdck construction) Construct Precast comets podnieW wet
1.3
Repair perimeter Isnot (steel)
1.4 Construct new perimeter sea Vass° Ccnelnct new steel digit Ink fence 3 motors Illah
•
Instil steel crg plates 1 realer rip
1.5 Repair entry/exit gate E.d% 0
1.8 Install new entryham gate WIWI, 'Say Port' Man '13* Port" Install rigor wire on coasting fence Cr
1.7
wal LM o
Prepare steam and paid existing gates or fences with 1 coat primer
1.8
and 2 coats oil paint SM
0
Prepare sudaoe and paint existing winner wet with 2 coats water
1.9
based paint (latex) fed o
1.10 Other (Describe in the space below.
Indkate Unit d
Use Bid tern 10 if necessary) Mums Below o Contelste structural ooncrela vont tome with steel roofing Each 381000 UNIT OF MEASURE QUANTITY 0 UNIT PRICE ($1 ITEM COST US) (5 US)
•
- smarm ITEM DESCRIPTION SIZE
2.1
2.2 LS
2.3
2.4
2.5 SM o
_
2.8
2.7
_
2.8
2.9
111111 1 01 /141 ,11340
2:1 8 I
I ji ff 1 1 i
11
o
a
t! 81
l i
it il if
: 1 5
StA
Indicate Uril of
Meows* Below
Each
150.00
Each 400.00 0
UNIT OF
MEASURE QUANTITY
UNIT PRICE (5
US)
0
ITEM COST
(1 US)
3. FLOOR SYSTEMS ITEM DESCRIPTION SE
Pressure wash and clean existing
3.1
floors StA 1.00 50
Remove and dispose damaged floor
3.2
covserip_ SM 1.03
•
3.3 Pieta/ now Ober Covering* SM 15.00 o Raper atfucturaly dontaatid floor 34 slobs sm 15.00 0
•
•
•
_.
3.5
3.5-
-
__
CPA CONTRUCTION PROJECT BID SHEET
'Meld new reinforced concrete floor slab (specify thinness in bid) Other (Describe in the apace below Use Bid Item 108 necessary) SM
-
Indicate Urit of
Measure Below
Fliiipair stairs
land stdrway rang
-- & - i- it
Ui
UNIT OF
MEASURE QUANTITY
15.00
-- 18.00
UNIT-PRICE
US)
0
j. 0
0
(5 ITEM COST
(S US)
4 - WALL g CEILING SYSTEMS ITEM DESCRIPTION 0 SiZE Remove damaged piaster kern wails or ceilings and repar with mortar
4.1
42
ad/or ClYPsufs Plasias as IsKtuSed 1 SM 0 Prepare wan or ceding surface, apply 1 coat primer/seder and 2 coats telex based) paint 182 4.03 725 = wall or canna surface, alp- 1y-
--
1 coat primer/seder and 2 wars oil
4.3
4.4
4.5
4.6
4.7 based paint -- .._.
_....
_
Demolish unsound walk / omits and climes of al debris 814 4 2.00 0 0 Build new masorry WIN *Rh mortarfplaster finish SSA
40.00
Remove damaged ceramic tee wall coming and MOS new all Other (Desalt* ft his specie below.
Use Bid Nam 10 if necessity) SA Indicals urat of Moan Balm FR In will acenings SM 40.00 .
Instal suspended oiling - SR
10.00
_
Remove suspended canting SM 2.00 UNIT OF UNIT PRICE 5 ROOF SYSTEMS ITEM DESCRIPTION SIZE MEASURE QUANTITY US) 0 0 0 (S ITEM COST LS US) _
5.1 5.2
6.3
5.4
5.5
5.6
5.7
5.8 Resod joints around roof ties Replace and seal damaged of misMng roof Res 30.00 Repair parapet voids. fascia, Of eaves _ Instag 'new steel rant panels .
'Clear roof drain and downspout I Ilrestal new roof drain kraal rw« downspout _ Other (Desathe in the space below.
Use Bid Rani 10 if necessary) ] SM 0 .
SM
16.00
Each
Bich
Path 2 60.00 160
._
Indicate Unit of
-
Measure Below
6-DOORS g WINDOWS ITEM DESCRIPTION SIZE Install new wooden hollow-core door
6.1
6.2
(apecity size)
l
-
i -
Install now wooden door frame Away size) .
0
UNIT OF
UNIT PRICE
(S, ITEM COST
MEASURE QUANTITY
US)
(5 US)
30.00 30
0
64 Install new steel door (specify size) Each 50.00 300
- • -- ---
-- --
._
Steal double ckxv
Eadi 100.00 0
6.4
-
_II.5
_
_.
-
6.6
High security steel bars
_
_
_
Eadi 150.00
Install new steel door frame (ape* aka) Steel double doer flame Instil new dsadbolt lock and furnish 3 _ads of keys Each j Each 8 10.00
00.00
__ _ _
Lock set WIWI security steel bars de East, 25.00 Pahl door • 2 editing (1 oast pdmer coals oll paint) SM haul other type of door (specify tin and type n bln Eadi 0 Bathroom atal door Each 20.00 0
I
•
•
CPA CONTRUCTION PROJECT BID SHEET
4.7
6.8
60
•
Remade broken window glass and replace with new glass in adding frame SM C Prepare rough opening in wall and Wel new window frame and glass (specify Met in bid) EaL 45.00 Frame any Each 2500 BO C lads' bers b steel security (urglar bars) on window i- Ei 2 I 23.40 50
• High two" MN bare Each 50.09 .
6.10 Clean ceding windows Sm
6.11 Paint existing window frames 8.12 Other (Desaibe in the space baker.
Use Bid Item 10 1 necessary) EA Indicate Unit of Measure Below 0
7- ELECTRICAL SYSTEMS ITEM DESCRIPTION SI
UNIT OF
MEASURE QUANTITY
UNIT PRICE fl
US)
0
nu COST
IS US)
7.1
testae new surface-mouMed electical wiring (specify wire type & diameter) . LIA
7.2 17.00
Install new electrical outlet Each 119
7.3 Inetit new wall switch Each 5 18.00 90
7.4 Instal new floureemet IMM tts Each 5 40.00 _.
Wail nigretignts Each 17.00 1 0 _ _
- - - - -
- 7.5 Instal new celing fan Each Install new telephone cabb 01111.1
40.00
7.6
Egon
200
80
0
._
_
7.7
instal new telephone jack
Each 1 40.00 L 40
1 nstal new circuit breaker (specify
7.8
type and cVrity)
Each 4 10.00 40
Instal new CIMult breaker panel (specify number col breakers and
7.9
capacity)
Each 1 750.00 i 750
India new isdalitn *AM (specify
7.10
type and wady) Each 1 250.00 250 Instal tansfanner new mails (specify
7.11
toe and capacity) Each
o
instal new mans cabMg (specify type
7.12
l and
size) u.s
Install new electnot generMor with Changeover watch (spealy make.
7.13
model. and capacity) Each 0 Ins011 new fuel tank for generator (WM capacity to operate generator for
7.14
7211011$ contrwoutY) Each
Meta flaw weeder seamy lighting
7.15
(specify** and size) on bull*** Each 0 Budd Weider fighting now meaty 0 0 (IR8filY1 We aPc ace)
7.10 Other (Deembe in the space below.
Um Bid Item 10 if necessmy) onp.iitneaarI EaCh Indicate Unit of Measure Berm 0 UNIT OF UNIT PRFCE (S DEM COST a - MECHANICAL SYSTEMS ITEM DESCRIPTION SI MEASURE QUANTITY US) 15 US) instal new window air condltloning a 1 unit (Tecify number of watts/amps) i Each 450.00 0 Instal new sett air conditioning unit
8.2
i.
(speedy number of tons) Each 0 1
8.3
Maid new etheust fan and duchwek I .
8.4 MOM new air suppy duchwet itat 0 as .....
moo new air exhaust duetwork Other - (Clescribe in the space below.
Use Bid Item 10 if necessary) .
LM
indicate Unit of
Measure Below
9- SANITARY & WATER SYSTEMS ITEM DESCRIPTION SIZE
UNIT OF
MEASURE QUANTITY
UNIT PRICE (S
US)
0
ITEM COST
CS US)
•
CPA CONTRUCTION PROJECT BID SHEET
9.1 Instal new Eastern sty* tolet Lath I 90.00 80
9.2 Instal new Western style meet F-ac..n
9.3 Test and clean sanitary drain pipes Each
10.00
Instal new sanitary drain pipes
9.4 LM 6 12.00 72
(VOCIN darn440, anti l'011) Clean and repair roasting septic tartlal
9.5
(to Include new locking hatth covers) Lath 0 Inetal new septic tank (to include
9.6
loddrip hatch covers) Lath 0 Ramose editing septic tanks and nienholea Each 0 Instal num porcelain sink wiM shuldt 97 atria Each 1 150.00 150
9.8
Instal
new water *Ind (specify Ras aid type Le. PVC, steel, copper...) LM 0 .
9.9 'Instal new mak shale valve Lath i 50.00 ao
9.10 'Instal tocknow preven9:in Wye Each 1 90.00 90
9.11 Install new plastic water tanks Each 1 375.00 375
9.12 Other (Describe in the space below.
indicate Unit of
Use Bid Item 10 if necessary) Measure Below Instal shower unit Each
150.00
0
..
Water
----- Ends 1 146.00 ._
pump
145
UNIT-Cc
UNIT PRICE (1
ITEM COST
10 -OMER IND ITEMS
ITEM DESCRIPTION SITE
MEAStJ OUNITTTY
US)
(S US)
Provide armed security parSonnel 24 hours per day &Mg the entire
10.1
duration et Ihe contract DAYS 0 102 Review kitchen talleadtalf Lath 150.00
-- 10.3 0
10.4
0
10.5 0
i 10.5 0
10.7 0
.
10.8
0
10.9 o
10.10 o
10.11 o
10.12
10.13 0_
10.14 o
10.15
Estimated BID PRICE: 4242
•
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by the CPA Action OfNcer) CPA PROJECT NUMBEIt .
CPA PROJECT TITLE:
Guard House
BID ITEMS
UNIT OF
UNIT PRICE
ITEM COST
1 - PERJMETER SECURITY ITEM DESCRIPTION SIZE
MEASURE QUANTITY
($ US)
(S US)
Repair perimeter wag (concrete or
1.1
brick consbuction) SM 0
Construct new perimeter rod 12 (concrete or brldt conebucliort 0 — .
Construct Precast concrete perimeter will SM 0 12 Repel perimeter fence (Mast) 14 Construct new perimeter well (sled) 814 0 onsvuat II ew Meal Chin WA fence 3 meters high Install steel dig plates 1 meterNh .
1.8
Repair entry/mat gate
1.8 Mild new entryfacli Vie Lath 0 Vehicle •Seir Pot? Lath 0 Men 'Slay Pon' Lath 0 Metall filLCX wire on existing fence or
1.7
well
0
Prepare surface and paint existing- gales or fences veith 1 coat primer
1.8
end 2 coats at paint
SM
0
..
Prepare sislace endpoint existing perimter wall with 2 coats water
1.9
based paint (latex)
1.10 Other (Describe in the space below.
t
Use Sid Item 10 if necessary) SM Indicate Unit of Meagre Below _ 0 _ Complete Each 3510.00 slniotfelconoideguerd tower with sleet rooting 0 UNIT OF USiYiCE s rrEu COT DESCRSMON
2- SITEINORK ITEM sin
MEASURE QUANTITY
US)
(1 US)
Remove and cassese off see al trash
2.1
and debns 811
Demash unsafe structures ars1
2.2
dispose of al debit
LS 0
.
Grading and leveling of ground (to include removing metrudem °Nods
2.3
fromkround)
Repair asphalt pavements or 2A walkways Replace asphalt pavements or
2.5
walkways DA
Repair concrete pavements of
2.8
wsikways SM 0
Replace concrete pavements or
2.7
viailivslys SM 0
Repair other type of pavemer/s or 28 wallormys Skt
2.9 Other (Meath.) lam. space below.
Indlceee Unit of
Use Old Item 101 necessary) MINISUIR MOW Construct concrete erirsy Pepe Each — 160.00 0 Construct concrete entry ramp Each 100.00 UNIT OF MEASURE QUANTITY UNIT PRICE (S US) 0 ITEM COST (5 US)
3- FLOOR SYSTEMS ITEM DESCRIPTION SIZE
Pressure such and clean existing
3.1
floor* SM 1.00 0
Remove and dispose dammed floor cerverIne SM 1.00 1 0
-- 3.2
--- —
3.3 Instal new floor coverings SM 1500 Repair structurally damaged floor
3.4
slabs gm 28 16.00 420
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
Install new reinforced concrete Aar
3.5
slab (spedty thickness in bid) 3.0 Other (Describe in the space below.
Use Bid Item 101) necessary) SM +indicate Ural of Measure Below 0 0 SM Repair stairs - 4.00 0 UM Install stairway Wing 18.00 0 UNIT OF UNIT PINCE (3 4 -Midi S =LINO SYSTEMS ITEM DESCRIPTION SIZE MEASURE QUANTITY US) ITEM COST (3 US) 41 42 T7 g i E
4.3 SM
4,4
4.5
4.0
4.7 thrice* Unit of
ch A g
-
ti e
1 11 I
4 pi t
1v 4 ul
a /V
!
l
-
i E
1
' I
SPA
-
2191
_ • _
SPA
Measure Below
h
4.00
2 2.00 4
. . 2 .1 40.00
0
340
_
SM 40.00 0
5 - ROOF SYSTEMS ITEM DESCRIPTION SIZE
SM
8*
UNIT-OF
MEASURE QUANTITY
10.00
2.00
UNIT PREZ(8
US)
0
0
ITEM COST
(6 US)
5.1 Reseal OEMs around roof tiles 0
- -
_ __ _
Replace and seal damaged or
5.2
missing roof tiles SM 30.00 0
-
5,3
Rep* parapet weak feScle. **Wee SM 0
5.4 Instal new steel roof pawls SM 18.00
5.5 Clear roof drain and downspout :
5.8 Instil new roof train
1
•
5.7
_ .. ._
.
_
i
5.8
Insist! new downspout' Each 2 80.00 100 Other (Desathe in the space below.
Include UM of
Use Bld item 10 If necessary) Measure Below 1 6 - DOORS a WINDOWS ITEM DESCRIPTION S UNIT OF MEASURE QUANT1TY UNTITINCE (3 US) InstaH new wooden hollow-cora door _.
. 6,1 ,
(specify size) 1 30.00 30
Install new wooden door frame 82 (specify size) 0 ITEM COST (S US)
-
. _
6.3 Install new Mel doer (spedly stab) 50.00 50
6.4
8.5
8.8
Sleet double door
. __ _
High sew" steel bent
_ _ _. _..
Eath
180.00
150.00
_ _
Install new Mel door frame (wedgy ' ) Oath 2 35.00 70 Steel double door fauns E.di 100.00 Install new deedboll lOok and furnish 3 sets of keys Each i 10.00 10 Lock set for high sorely Mei WS door Eath 25.00 Paint Ebeling door (1 cost calmer + 2 coats oil paid) SM 0 install other type of door (specify stee arid l(pe in bkl)
- - ----
13alhoom sum 000r Oath MOO 0 _
• CPA CONTRUCTION PROJECT BID SHEET
8.7
6.8
6.9
Remove lector° window glass and reptiles with new glass in exIsting frame 0 Prepare rough opening in WEIN and Metal new *endow frame and glass (specify size In bib) Each 3 40.00 120 Frame only 25.00 0 Install steel security has (burglar bets) Oil window Eedi 3 25.00 75 High secunty Sklei bars Et 50.00 0
8.10
Clean existing windows SM 0
8.11
Pent eating window tames EA
6.12 Oter (Describe m the space below.
Use Rid Item 10 6 necessary) kiddie Una of Measure BAlOW
7- ELECTRICAL SYSTEMS ITEM DESCRIPTION 8
UNIT OF
MEASURE QUANTITY
UNIT PRICE ($
US)
0
ITEM COST
(1 US)
•
7.1
Instal new surface-mcureed electrical wimg (specify wee type & written LM
7.2 Install new elecbical °diet Each _ 1 7*.
51
.,
MOM new debt
7.3 Each 3
18.00
54
7.4 instal new liourescent fight fedure Each 5 40.00 200 heal Metights Each 17.00
7.5 Mel now calling fan Each 2 40.00 80 Instal new telephone cable (single
7.6
rein Each 0
7.7 Instal new telephone jack Each 1 40.00 40 Instal new drcuk breaker (specify
7.8
type mid capedty) Each 2 10.00 20 Instal new circuit breaker panel (spedy number of breakers aid _ ___ ..._ _ 750 00 . • 750
•
Mstal new Isolation switch (spedfy
7.10
type and capacity)
Each 1
260.00
250
Instal new mains transformer (spedfy
7.11
type and capacity) Each 0
bait new mains cabling (specify type
7.12
and size)
Install new electrical generator with dengeover switch (specify make.
7.13
model, and capacity)
Instal new fuel tank for generator (vilth capacity to operate generator for
7.14
72 hours oontruously)
Each
mew new exterior security lighting
7.15 Each
,lecifyype and Mee)
on Weep
0
0
Instal new exterior securky lighting (specify type and size) Iiir p i ariMeter ad 7.16 Other (Desaibe In the space below.
Use Bid tern 10 if necessary) Each Indicate Unit Of Me.8.5tNE Below 0 _- 0 UNIT OF UNIT PRICE ($ ITEM COST 11 - MECHANICAL SYSTEMS ITEM DESCRIPTION SIZE MEASURE QUANTITY US) (1 US) Install new window air conclOoning OA tint (sport , number of watts/amps) Each 1 450.00 450 Instal new spit er conditioning unit
6.2
(madly nunter of tons)__
8.3 Instal new exhaust fan and ducbrock IJA 0
8.4 Instal OM air supply &defrock LM 0
8.6 Instal new air exhaust ductwork 8.6 Other (Desert* in the space below.
Use Bid here 10 if necessary) LM Indicate Und of Measure Below 9 - SANITARY IS WATER SYSTEMS ITEM DESCRIPTION UNIT OF MEASURE QUANTITY UNIT PR/CE (11 LIE) 1 0 ITEM COST (5 US)
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
9.1 tnetellnew Eastern style 101144 Each I 80.00 80
9.2 Install new Western style toilet Each 93 Test and dean sanitary drain pipes 10.00 Instal new sanitary drairi pies
9.4
j_vectly diameter and type) LM 2 12.00 24
9.5
9.8
97
Clean and repair adding septic banks (to include now loddno hatch covers) Instal new septic tank (to inducts locking hatch covers) Each 0 Remove westing septic tanks and inatholes Each 0 Install new porcetaki sink well shut-olf valves Each 1 150.00 150
9.8
Instal new water piping (spedly size and type I.e. PVC, steel, copper...) Lid 0 ao Instal new mein shut.off valve Eath 1 50.00 50
9.10 Instal beckflow prevention valve Eadt 1 90.00 90
9.11 Instal new desk water tanks Each 1 375.00 375
9.12 Other (Describe in he space below.
Indicate Ural of
Use Bid Item 10 if necessary) Measure Below 0 Install stoner unit Each
150.00
o
Water pump
Each 1
145.00
145
UNIT OF
MR PRICE 0
ITEM COST
0 -OTHER INDITE= ITEM DESCRIPTION SIZE
MEASURE QUANTITY
IMM
M Wil
Provide aimed security personnel 24 hours per day cluing the entire
10.1
duration of the contract DAYS
10.2 Rodeos Idtchen tableishelf Each 150.00 0
10.3 0
10.4 o
10.5 0
10.8 o
10.7 0
10.8 0
- r -
10.9
0
10.10 0
10.11 0
10.12 0
10.13
0
10.14
0
_... _....
10.15
Estimated BID PRICE. 4896
•
CPA CONTRUCTION PROJECT BID SHEET
•
•
•
CPA PROJECT INFORMATION (To be completed by the CPA Actkon Officer) CPA PROJECT NUMBER:
PA PROJECT lITLE:
Guard Towers
BID ITEMS
UNIT OF
UNIT PRICE
ITEM COST
1 - PERIMETER SECURITY ITEM DESCRIPTION SIZE
MEASURE QUANTITY
(6 US)
(3 US)
Repair perimeter wall (comets or 1 1 bock construction) Construct new penmeter vfall
1.2
(concrete or brick oonstruclion) _ Oonsinict Pt erast cuncrele painkiller l 0 0 .
f
1-3 : 411 -1 1:1:09drneter Iwo WINO I 0
1.1 Consbuct new &water veal (steel) ConeVu new $teel chin Ink fence 0 3 meters high SM hotel steel cig plates 1 meter high LM 0
1.5 Repair crawled gale
1.8 Meld new entre,* gale E, 0 Wade 'SslOr Parr 0 Man 'T . RxT Instal razor nix on eliding lance or
1.7 wall LM
Prepare surface mid pal adding fences Wei 1 gates or Wet mirror
1.8
and 2 coals ol paint
Prepare surface and pill exiting perimter wall eat 2 coats vraIer
1.9 based pant (latex) Ski
1.10 Other (Describe n the space below.
Use Bid Item 10 a necessary) Indicate Una of Measure Below 0 SM 0 0 0 C,ompleto tanictural concrete guard tower with Neel rooting Each 8 351000 28080 UNITOF UNIT PRICE ($ ITEM COST
2. SITEINORK ITEM DESCRIPTION SIZE
MEASI QUANTITY
US)
(8 US)
Remove and dispose eft sile all bash
2.1
and debris 0
2.2 Demolish unsafe structures and of as &ions LS 0 = and leveling of wound (to Include 1111110009 protrudIv) objects
2.3 SM 0
tom wound)
Repair asphak pavements or
2.4
walkways .._ .
Replace asphalt pavernerts or walkways SM 0 Repair concrete pavements or
2.6 walkways
0
'Replaoe concrete pavements or
2.7
. wallovays SM
o
Repair other type of pavements Of
2.8
SSA
Walkways 0
2.9 Olher (Describe In Me specs below.
Mice* Unit of
Use Bid hem ID II necessary) Measure Below Conatruct concrete coney daps Each tho no 0
1._
_
Consbucl concrete Wry ramp Each 400 .00 0 UNIT OF
-UNIT PRICE (6
ITEM COST
3. FLOOR SYSTEMS ITEM DESCRIPTION SIZE
MEASURE QUANTITY
US)
($ US)
PIIISIUM wash and dean wasting
9.1
floors Sm 1.00 0
Remove and dispose damaged floor
3.2
coverings
SM 1.00
3.3 SM 15.00 0
/Mal new floor covedngs
Rep* sbucturaly damaged lox
3.4
slobs SM 15.00 0
• CPA CONTRUCTION PROJECT BID SHEET
35
3.8 Instal new reinforced concroto floor Nab (specify thickness in bid) Other (Describe in the space below.
Use Bid item 10 if necessary) SiM Indicate Unit of , Measure Seknx ' SM llepalr Ware 15.00 I --
• 0
i
LM
Install shivery rang - 11100 UNIT OF MEASURE QUANTITY UNIT PRICE (S US) 0 ITEM COST (S US)
•
4 - WALL & CEILING SYSTEMS ITEM DESCRIPTION SIZE
Remove damaged piaster from woes or ceengs and repair with mortar
4.1
ancVer gypsum plaster as required Prepare wall or ceiling surface, appy :
1 coal primer/sealer and 2 coats latex .
4.2
I Wate( DaSed) PON .
4.00 0
Prepare wall or cuing surface. apply 1 coat primer/sealer and 2 coats oil
4.3
based paint 0
Demolish unsound wab / cegs and
4.4
dispose of all debris SM 2.00 0 Bold masonry IleW we/ ugh
4.5
mortar/plaster finish
OM 40.00 0
Remove damaged ceramic de wall
4.8
4.7 covering and Instal new tiles SM 0 Other (Describe In the space below.
Indloele Unit of
Use BM Item 10 d necessary) Messue Below ..
Fl in wet openings
SM
40.00
Instal suspended ceiling WA 10.00 Remove suspended ceiling SM 2.00 5 - ROOF SYSTEMS ITEM DESCRIPTION SIZE
-UNIT OF
MEASURE
UNIT PRICE ($
US)
0
0
0
ITEM COST
($ US)
5.1 Reseal joints around root See 0 Replace and seal damaged or
5.2
missing roof See gm 313.00 0
5.3 Repair mpet vials. Made, or 01/111111 WA 0
5.4 Metal new shmi roof mole SM 18.00
6.5
Clear roof Main and downspout Deals 0
5.6
Instal new turd drain
•
5.7 Install new downspout Bids 60.00
5.8 Other (Describe In Me space below.
Mc*/ UnIt St
Use Bid Item 104 necessary) Measure Below 0 UNIT OF UNIT RICE (S ITEM COST
6- DOORS & WINDOWS ITEM DESCRIPTION SI
MEASURE QUANTITY
WM
(5 US)
Mame new wooden below-core dock'
6.1
(specrly sae)
30.00
_
Instal new wooden door frame 62 (specify size) Beds 0
6.3 Beth 50.00
Instal new steel door (specify size) Steel double door Each 180.00 0
6.4
Iligh scarily steel bars Eeds 150.00 0 Install new steel doorframe (sgedfy size) Beth 35.00
8.5
SO)
Steel Sable door frame Beth
100.60
Yield new deedbolt MSc and hellish 3 sets of keys Bath 10.00 Lock set for high security mad bwe door Bids 25.00 Paint wistim door + 2 (1 coat pdmer mats ol paint) SPA 0 Instal other type of doer (mpmelly else end type in bid) teSt 0 _ Bathroom still door Eedo 30.00 0 _
S CPA CONTRUCTION PROJECT BID SHEET
•
•
•
6.7
8.8
6 9
Remove tvoken window glass and replace with new glass in existing flame Rendre rough opening in wall and Instal new window frame and glass (specify stte in bid) Each Amoo Each Frarne only 25.00 Install stem security hars (burglar bars) on window Each 25.00 0 i
0.10 Clean Wasting windows seastly steel bars Each 50.00 SM
0.11 EA
Paint existing window frames
6.12 iw
(Desalt* in the space below Use Bid Item 10 if necessary) Indicale Unit of Measure Below
- ELECTRICAL SYSTEMS ITEM DESCRIPTION J SIZE
UNIT OF
MEASURE QUANTITY
UNIT PRICE
US)
0
($ rrEm COST
IS US)
7.1
Instal new surface-mounted oectncai WIrkAi (specify wire type 8 diameter) : LM 0 .
1
7.2
kiatil new eiecbical outlet Each e 17.00 136
7.3 InInSwai0th ESil. 8
18.00
144
r
7.4 lnstdnewhloireeosidlghllbthiw e 40.00 Metall ecteloriet Ei 17.00
7.5 Metal new cans fan Each 40.00 Instal now lelaphona cab* (WO
7.6
pad) Each 0
_
- - 7.7 Instal nem telephone Mck Each 8 40.00 320
•Inetal riva drcuit breaker (specify
7.6
1100 - '....= E.di 6 10.00 80 Instal now circuit Meeker pant , breams (wady ranter of aid
7.9
capacity)
Each 8 760.00 0000
Inetel new ledelion mitech (specify
7.10
Met and °spicily) 250.00
Mal now realm trandenner (specify
7.11
and - -
o
Meal Ming
new mains (apecliy
7.12
and ate)
Instal new electrical generator with changeover switch (specify make.
li
1
7.13
model. and ca$ecity)
0
Instal new fuel tank for generator (with capacity ba operate generator for'
7.14 Each
72 hours cortinuotray)
Instal new exterior security lighting
7.15
Malay ype mid aka on Inklings 0 o hod new etterior acuity letting Each (specify type and stze) les wet o
7.16 Other (Describe In the space betas.
Indica) Unk of
Use Bid Item 10 it nerAssay) Measure Below UNIT OF MEASURE QUANTITY UNIT PRICE US) 0 IS ITEM COST (S US) 8 MECHANICAL SYSTEMS flBI DESCRIPTION SIZE Instal new window air conditioning
8.1
unit (specify nunber of watts/amps) Each 450.00 0 Metal new spit as conditionng urn
8.2
Each
Mindy maim* of Mat 0
I
new athaist fin and dacavock UA .- • • aA Install news* sup* Warns% I UA 0 o 0
8.6 8.6
instal new air exhaust ductwak Other in the below.
(Describe space
Use fid Born 101 necessary) UA Indicate Unit of Measure Below 9 • SANITARY & WATER SYSTEMS ITEM DESCRIPTION SE UNIT Of MEASURE QUANTITY UNIT PRICE US) 0 ($ ITEM COST (8 US)
• CPA CONTRUCTION PROJECT BID SHEET
9.1 Instal new [astern sty* tceet Eadt 80.00 92 instali new Western style tow Each
9.3
Test and On sanitary drain ayes Eoch
10.00
install new smeary drain pros P4 LM 9 12.00
9.5
9.6
9.7
Clean and repair among septic tanks include new locking hatch covets) Install new septic tank (to include locking hatch covers) Eath 0 Remove edslIng septic tares and manholes Each o Instal new porcelen sink will shul-off valves Eat 150.00 0 16 Instal new water pig (specify size and type i.e. PVC, steal, copper...)
50.00
9.9 Instal new main shul-olf yoke EaolI 8 400
9.10 kola badiom prevention valve Eat 8
00.00
720
8
375.00
9.11 Install new plastic %ester tanks Eat 3000
9.12 Other (Describe in the space below.
Indicate UM or
Use Sid Man 10 9 necessary) Measure Beiow 0 Instal shower u Eat 150.00 0 Water pump Eat 8 145.00 UNIT PRICE S US) 1160 ITEM COST (S US) .........
10. OTHER BID ITEMS ITEM DESCRIPTION S MEASURE QUANTITY
Provide armed securtty personnel 24 hours per day during the entire
10.1
duration of the contract DAYS
-- -
- -- -
102
Reprice kitchen tabinanelf Each 150.00 0
10.3 o
10.4 0
10.5 0
10.6 0
10.7 0
10.8
0
10.9 0
10.10 0
10.11 0
10.12
10.13
10.14 0
10.15
Eseteeled BM PRICE 40360
•
•
CPA CONTRUCTION PROJECT BID SHEET
•
•
CPA PROJECT INFORMATION (To be completed by the CPA Action Officer) CPA PROJECT NUMBER:
CPA PROJECT TITLE: BID ITEMS
A - Wind and B - Wing Buildings UNIT OF UNIT PRICE ITEM COST 1 - PERIMETER SECURITY REM DESCRIPTION SIZE MEASURE QUANTITY (S US) (3 US) Repair penmeter wal (concrete or ) 1.1 tia:k consbuclion) Construct new perlmster we/
1.2
(concrete or Mc* corsbullon) SM 0 Conskuct Precast concrete padmater 1 I 1 1.3 Repair perimeter fence (steel) I 1.4 Construct news patriot& wall (sled) Construct new SIMI Man Mk fence 3 meters high Install steal clg plates I meter high LM 0
1.5 RePair mitt/exit lade
1.6 Install new entry/exit gate Wilde "Sally Port - Lath 0 Men Taff Pofl Eeth 0 Install razor wire on existing fence or
1.7
was LM 0
Prepare surface and paint existing gates or fences with 1 coat primer
1.8
and 2 coats oil pant 0
Prepare surface and part wasting 2 peffinter wall svidi coals wafer
1.9
based paht (latex)
1.10 Otlw (Describe In the specs below Use Bid tern 101 'Isomer* Sad Indica* Mt el Measure Below 0 0 Complete structural concrete guard tower With steel roofing Lath 3610.00 0 UNIT 431F- uNir PRICE ($ ITEM COST
2. S1TEWORK ITEM DESCRIPTION SIZE
MEASURE QUANTITY
US)
IS US)
Remove and dispose off site al trash
2.1
and debris
Demoksh image tdruclures and
2.2
dispose of all debris
LS
Grub* and leveling of grand (to irclude removing protruding oblects
2.3 --
- — --- - -
- -
from would) -- - - -
0
—
Repair aspfett pavements Of
2.4
walkways
0
. _—
Replace asphat pavements or
2.5
walkways SM
3
Repair commie pavements or
2.6
mew/aye SM
o
Replace comae pavements Or 27 walkways 0 Repair oater type of pavement* cc
2.8
Mbar. Ski
o
2.9 Ober (Desert* In the space Wm.
Indicate Unit d
, Use Bk1 Nem 10 if necessary) Measure Below o Donsbuct concrete entry steps Each 8 150.00 1200 Ocaelruct comets way ramp Each 400.00 0 UNIT Of UNIT PRICE (3 ITEM COST 3 • FLOOR SYSTEMS ITEM DESCRIPTION S MEASURE QUANTITY US) (S US) Pressure wash and clean Meting
3.1
floors SM 1.00 0
end
Remove depose demigod floor
3.2
coverings
2496 1.00 2498
&3 Instal new floor °overlap SM 2406 15.00 37440 Rapist's:Maly damaged floor
3.4
dabs Skt 15.00 0
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
3.5
3.6
Install new reinforced concrete floor stab (specify thickness in bid) I 'Other (Desaibe in the space below i Use Bid Rent 10 if necessary) .
iRepir ells
!Instal Malan sang
SM
Indicate unit of
Measure Below
SM -
LM
UNIT OF
MEASURE QUANTITY
0
0
15.00
0
18.00 0
UNIT PR= (3
ITEM COST
US)
(3 US)
4-WALL & CEIUNG SYSTEMS ITEM DESCRIPTION SIZE
Remove damaged plaster from we Of ceilings and repair with mortal
4.1
indior gypsum plaster as required 5fs 0 Prepare vain or celing surface, apply 1 Cern primer/sealer and 2 coats luta
4.2
(wafer based) pen SM 5460 4.00 211340 Prepare wall or cabs tarmac*. SP* 1 coat primedseafer and 2 coats Oi _ .
_.. _.
4.3
4.4
4.5
4.6
4.7
based paint SM
Dereolla unsound waft I (MOM and depose or at debris 2.00 Buld new masonry wail wth TOMIriplaster finish SSA 64 40.00 2500 Remove damned ceramic tile wall covering and instal new Wes SM Other (Describe In the space bellititr.
-
Indian Unk of
Use Bid tent 10 If necessary) Meson Below Fli In %rad openings SM 40.00
-
Instal suspended celIng SM 10.00 6 - ROOF SYSTEMS ITEM DESCRIPTION SIZE Remove suspended ceiling BM ZOO UNIT OF MEASURE QUANTITY 0 0 0 0 UNIT PRICE 3 ITEM COST US) (3 US) _
5.1 Reseal ions around roof Iles SM 0 Replace damaged and sad or inning roof Ille SM 30.00 52
5.3
Repalr parapet wen fascia, or coves ___ _ ...
5.4
and new steel roof panels
16.00
. _
5.5 Clear roof drain and downspout Lade 0
5.0 Instal new rod drain
5.7 Instal new downspout Each 32 80.00 2500
5.8 Other In In beats. hante Unit of (Deal* specs Use Old Item 104 noonday) Measure Below
6- DOORS Si WINDOWS
--
0
UNIT OF
UNIT PRICE (
1 ITEM COST
MEASURE QUANTITY
US)
1 (3 US)
_ .
ITEM DESCRIPTION SIZE
Instal new wooden holm-core door
0.1
0.2
(specify ne) Each
Intel new wooden door frame (specify We) Each
30.00 0
e.3 betel new slial dew (en* no) Each 8 50.03 400 Steel double door Each 103.00 0 __.
-
-- - -- --
- ---
- 8.6
___
High security steel bent
150.00 4000
Instal new steel door frame (speek'y
8.4 38.00 1400
elze)
Steel double door frame Each 100.00 Instal l lock new deeded end WSW 3 sets of keys EadI
10.00 0
Loa eel for Mph MC** adel bers door Fade 40 25.00 1000 Paint door + 2 mating (1 cosi primer coats oil paint) EPA Instal other type of door (essay etze 66 and type In Inch 0661100m eal d001" Each 20.00 0
• CPA CONTRUCTION PROJECT BID SHEET
Remove broken window glass and replace wail new glass In ending
6.7 trine SM 0
Prepare rough opening in met and Instal new window frame and glass
8.8
(specify size in bid)
Each 40.00 0
___ .
Frame only Each 240 25.00 8000 Instal steel society bars (burglar
8.9
bent) on window 25.00 0
-
--
High sectrily 'toolbars
_ .._
Clean eosin° windows
810 SM
50.00 12000
0
5.11 Paint existing window frames 6.12 Other (Ciesaibe in the space beiow.
Use Bid hem 10 if necessary) EA '- i- ncleite Uret of Measure Below _
7- ELECTRICAL SYSTEMS ITEM DESCRIPTION j SIZE UNIT OF MEASURE QUANTITY UNIT PR/CE ft US) 0 ITEM COST (1 US)
•
7.1
MOM new surface-mounted EnocIncal 11clli4e type & diameter) .
---
___ . . ___
... . _ _
lased morale:ideal outlet
72 Each
24
.
____
7.3 Instal new sal ewild Each 48
17.00
.
18.00
74 Inds. Wm flourerment light bide Each 40.00 kmbi Mras bulkhead vandal mod Each 112 200.00 _.
408
804
MUM Each 112 17.00
1904
7.5 Meld new alba tea Each 72 ALM) 21180 Meld ceIng frin encessures Each 72 100.00 1200 Instal new telephone able (in.
pelr) Each 0
. . _ . _ ___
•
_
.
_
- - 7.8
7.7_
7.8
Meld new telephdhe jadt
_ _
InstM breaker
new circult (specify
Mpe and °madly)
ach
Each
8 40.00
rocs0
320
240
_
Instal new Moult breaker panel specify number of breakers and
7.9
7.10
7.11
7.12
wady) Each 6 750.00
6000
Metal new isolate seed) dpedfy type and capacity) Each 8 250.00 2000 Instal new mains transformer (specify type and oispacity) Each 0 Instal new mains caging (specify type and size) LM Instal new eiedrIcaigenerator nth changeover switch (specify malus,
7.13
model. and capacity) Each 0 Meld new fuel tank for generator NM capacity to operate generator for
7.14 _72 .
Wens continuousty)
_ WWI nevi exterior security lighting "-
7.15
(apedfy tymand size)
on buldem Each
0
0
o
Instal new exterior secumy lighting (/1 1eciti We smi size) an perknelar vial Each
7.18 Claw (Descrbe in the space below UM SW hem 10 if necessary) Mad Lk* d Measure Below Milt* ASU QUANTITY llierPME ( S US) 0 ITEM COST (S US)
8- MECHANICAL SYSTEMS ITEM DESCRIPTION 8
Metal new window air cononing
8.1
6.2
wit (spedry neater of madames) Eadi 50.03 0 lostal new split iir conditioning unit specify rsunber of tons) Each 0 _ _ __ _ _
•
8.3
8A
8.5
Instai new exhaust tan and ductwork _ WM new as supply ductwork LM 0 Instal new air edema dechvOlk LM 0
•
•
CPA CONTRUCT1ON PROJECT BID SHEET
86 Other (Describe NI the space nekow Use Bid Item 10 9 necessary) ' Oatcake Una ot Measure Below 9 - SANITARY 8 WATER SYSTEMS ITEM DESCRIPTION SiZE UNIT OF MEASURE QUANTITY UNIT PRICE US) n ft ITEM COST (S us) 91 Instal new Eastern style toilet E.
32 80.00 2660
9.2 Instal new Wealam atOa Wet 0 Earn 13 Ted and dean salter/ drain dpita Eath 10.00 Instal new sanitary drain pipes
9.4
(sPecdy diameter and type) LJA 192 12.00 2304
9.6
9.8
17
Clean and repair existing septic tanks (lo ktolude new lockeg hatch cover!) Instal new septic tank (to oduda locldroLhatch covers) Each 0
- Remove reistkv septic tanks and nienhoies E.th 0 Instal new porcelain sink wet shutoff ashes Eath 32 150.00 4800
9.8
Instal new vadar dping (wady size and two Le. P. AA copper...)
0.9 Instal nom main shui41, vai wo E. 8 60.00 400
9.10 kibeddIowpmoiatonvatve Eath 8 90.00 720 111 Instal MA Plaslic %valor tads Each 8 375.00 3000
9.12 Other (Describe in the apace bekret Indicate Unit of Use Bid Item 101 necessary) Me.asure Below o Instal shower unit Each 150.00 0 Water pump- Each 0 145.00 1160 UNIT OE UNIT PRICE it ITEM COST 10 - OTHER BID ITEMS ITEM DESCRIPTION SIZE MEASURE QUANTITY US) (5 US) Provide armed security personnel 24 ham per day during the entire
- 10.1
duration unite contract DAYS
- -
102 Replan fetchers table/shelf Each 150.00 0
10.3 0
- -
10.4 0
10.5 0
10.6 0
10.7 0
10.8 0
109 0
10.10 o
10.11
10.12
.. ___.
..._. ._._ ..
10.13
•
0
10.14 0
-
10.15
Estimated ea) PRICE 152856
•
• CPA CONTRUCTION PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by the CPA Action Officer) CPA PROJECT NUMBER:
CPA PROJECT TITLE: BID ITEMS
C - Wing Buildings
1 - PERIMETER SECURITY ITEM DESCRIPTION SIZE
Repair perimeter wall (concrete or 11 Ida come:ruction) uNt-r OF MEASURE QUANTITY SM UNIT PRICE ITEM COST $ US) IS US) COnalrutt new penmetar waii
1.2
(=crate or brick construction) SM —I-- -- '
- --
0
Construct Precast comet° perimeter eel SM 0
1.3 Repair perimeter fence (steel)
1.4 Construct new perimeter wail (stea)_ SM — Construct new sleet than link fence 3 meters high ..
SM
_.. _
•
_
Instal steel da pl_
__. . _____ —
1 meter nigh
LIA
0
1 --
1.5
Repair entry/ma gale
Ea o
1.6 Instal new eityreadt gale _ Vehicle Ms" Poit Earn o Men Tasty Port' Eath 0 — — • Metal razor ate on westing fence or
1.7
wall
Preisers surfaos and pant existing gates or fences with 1 coat primer
1.8
Land
2 coats al paint SM 0
_
I Prepare surface and paint existing wader wail with 2 coals water
1.9
based paint (lates)_ SM 0
..,
1.10 Other (Describe In the space bdow.
Indcate Unk of
Use Bid Item 10 8 necessary) Measure Bdow Complete structural concrete goad tower with steel rooting Each 3510.00
2- SITE WORK ITEM DESCRIPTION SIZE
UNIT OF
MEASURE QUANTITY
SM
IIIITPRICE 0
US_
Li
0
I1M1 COST
IS US)
•
--.—
Remove and dispose off site al trash
2.1
and debris
Demolish wide ebucares and
2.2
depose of all debris LS
Gradng aid leveling of ground (to irockde removing protruding objects
2.3
froM ground)
_
_
Repair asphalt pavements or
2.4
viedwaya
0
Replace asphalt pavements or walicwa
2.5 0
Repair coocrote pavements or
2.6
walkways
Replace concrete Pavements or
2.7
walkways SM 0
Repair other type of pavements or
2.11
2.9
wallower;
.
Other (Deriortiald- tne speoe — nelow — .
Use Bid Item 10 If necessary) SM Irxticate Unit of Measure Below 0 0 Canoeist caws,* Grey steps Escn 150.00 Construct concrete entry ramp Each 400.00 0 UNIT OF UNIT PRICE (S ITEM COST
3- FLOOR SYSTEMS ITEM DESCRIPTION SIZE
MEASURE QUANTITY
US)
(S US)
Pressure wash mid dean existing 3 1 floors SM
1.00
Remove and dispose damaged floor 12 coverings SM 996 1.00 956
•
3.3 Install new floor covectogs SM 15.00 14940 Repair structurally damaged floor
3.4
dabs SM 15.00 0
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
.
3.5
3.8
Instal new reinforced concrete floor slab (specify thickness n bid) Other (Descnbe in the space below Use Bid Item 10 if necessary) SM Indicate Unit of Measure Below 6 SM Repair stains 15.00 LM Instal stakway rating 18.00 0 UNIT OF UNIT PRICE ($ ITEM COST 4 - WALL & CEIUNG SYSTEMS ITEM DESCRIPTION SRE MEASURE QUANTITY US) (SUS) Remove damaged plaster from waft °ratings and repair with mortar
4.1
araltor gypsum piaster as required SM 0 Prepare wall or ceding surface, apply 1 coat prtmerfsealer and 2 coats latex
4.2
beater based) paint SM 3100
4.00
12400
Prepare wall or ceiling surface, op* _ 1 cast primer/seder and 2 coats cal
4.3
based paint SM 0
Mandan ansouncl walla f celIngs mid 44 depose of al deans SM 2.00 Build new masonry wal with
4.5
sihrteldester fresh 40.00 1200 _ ._.
Ramey* damaged ceramic tile wee
4.6
camrIng and Instal new ties SiA
4.7 Other (Decal* in the space below.
Male Una of
Use Bid hem 10 r necessary) Moose Below FS in vraN openings St1 40.00 Instal suspended ceiling SM 10.00
5. ROOF SYSTEMS ITEM DESCRIPTION SIZE
Remove suspended ceiling SM 2.00 UNIT OF MEASURE QUANTITY UNIT PRICE ($ US) 0 0 0 ITEM COST (1 US)
5.1 Reseal Saris gravid roof tiles SM o Replace and sod damaged or
3.2
miming red tiles SM 30.00 0
5.3 was. feeds. or ewes SM o .
3.4 Instal new steel rod ponds SM 18.00
5.5 Gear mot Orals avid downspout Each
5.6 Instal new rod drain
0
0
Each
5.7 Instal new downspout 9 80.00 720
5.8 Other (Desalie In the seam below.
Indicate Unil ri
Use Bid Item 108 necessary) Measure Briar 0 UNIT OF UNIT PRICE ($ ITEM COST
6. DOORS a WINDOWS ITEM DESCRIPTION SIZE MEASURE QUANTITY US) (1 US) hated new wooden holorr-ore door ,
8.1
( dee)
Each
30.00
Intall door frame
new wooden
8.2
(spedfy Mae)
Each
0
6.3 Wel new Neel door (specify she) Each
50.00 0
Steel double door
Cod,
180.00 0
tem* steel hers
Each
__NV 150.00 3150
21
Instal new steel door frame (specify
6.4
size)
Each 21 35.00 735
6.5
6.6
Steel doubie door frame
Each 100.00
Instal new deadbeat lock and furnish 3 sets of keys Each 1060 0 Lock set for Ilgh securty sleet bare door 21 25.00 525 Pal existing door (1 cost planer + 2 coats ol paint) SM Metal other type cif door (sped'y dee and Ire In bk5 Bathroom stall door Each 20.03 0
•
•
CPA CONTRUCTION PROJECT BID SHEET
...____.
Remove broken window 'ass and replace with new glass 111 existing
6.7
frame 0
Prepare rough °paring in wall and Mai nevt window frame and glass
6.8
(specify eine in bid) Eath Frame ce*, 4000 0 2500 Instal steal security bars (burglar
6.9 25.00
bars) on window
Lath
1125
C
High wocurly Wool bars
Eedt . 45 slog J
6.10 8/A
Clain existing windows
2250
o
6.11 Paint existing window frames 612 Other (Deecnbe lithe apace below Use Bid Item 101 necessary) EA Indicate Unit of Measure Below
7. ELECTRICAL SYSTEMS ITEM DESCRIPTION SIZE
UNIT OF
MEASURE SMANIUY
Ulill PRICE
US)
0
($ ITEM COST
($ US)
7.1
Instal new surface-mounted electncal venlig (spedfy wire type a diameter) LM ._ ._ .
-- --
: 7.2
kids' new 61w:bleat mast Lath 9
17.00
153
7.3 Inetal now ad weib:b Lath 36 18.00 348
7.4 Instal raw Inurement lght Odors EedI
40.00
Meld new Wined vendee proof /OW Eath 54 200.00 10800 bentall_dpIllles Lath 34 17.00 918 . . _ 7,6 Instell new E.di 36 40.00 I 1440 ineal °sling fen enclowine Lath 36 100.00 3800 l Instal new teMphone cable (single
7.6
pelt) Lath
0
7.7 Instal nee, teteptione lack EadI 8 40.00 120 Instal new circuit breaker (spodfy
7.8 :Vim and capacity) Ends 18 180
10.00
Mal new craw breaker panel ' Oradea .
(penly number of and
7.9
'capacity)
Ends 3 750.00 2250
fristes new isolation switch (specify
7.10 ,
. type capacity
and )
3 250.00 750
I
' Instas new mains transformer (specify
7.11
type and capacity)
Instan new mains cabIng (specify two
7.12
and size)
0
instal new etecticat generafcr With changeover snitch (specify make,
7.19 Lads 0
model, and capacity)
treed new fuel tank for generator (with capacity to operate generator
7.14 0
72 hours contnuousiy)
Instal new exterior sectaity fighting --
7.15
specify type and size) on Ouldligs Lads 0 Instal new exterior wady thing 191PecifY tYPe and sirs) onierlmeter wan Each 0
7.18 Indicate Unk of
Other in the below.
(Describe specs
Use Bid Item 10 if necoiklety) Measure Beim UNIT OF MEASURE
8- MECHANICAL SYSTEMS ITEM DESCRIPTION SIZE
Instal Widow
now air comlioring
8.1
will (specify lumber of valtelanips) Instal now spit sk conflicting unit
8.2
(dedALeurnbsr el tons) Lath 0 UNIT PRICE (5 ITEM COST US) (5 US) 450 lx) ...
0
_
0
8.3
Inillal MN ensust fan end dm:Mod IJA 0 ,
-
8.4 instal new air soppy ductoost
8.5 Install new ok rodiewst ductwork UA 0 _
I
•
•
•
CPA CONTRUCTION PROJECT BID SHEET
e.e °that (Desaibe m the space betow Use Old Rem 10 1 neoessary) Indicate Unit of ' Measure Eleiow
• - SANITARY & WAWA SYSTEMS rfN DESCRIPTION SIZE UNIT OF MEASURE QUANTITY UNIT PRICE US) 0 (5 ITEM COST (S US)
9.1 Instal new Eastern st4o toilet Each 18 80.00 1440
--
9.2 Install new Weerem sh1e toilet Eadt 0
9.3 Test end dean sashayan pipes 10.00 0 RS_ Instal new sanitary drain pipes (specify diameter and type) 108 12.00 1290 _
9.5
9.8
9.7
[Clean and repair existing septic tanks (to Include new bating hatch covers) Each 0 Instal new septic tariff (to include locking hatch coversi___ Each 0 Remove existing se* lanai la - manholes Each Instal new porcelain sink villti sleit-off yawn Each 18 150.00 2700
9.0
Instal new water ping (specify sRe and type Is. PVC. sleet copper...) LM 0
9.9 Instal new main etad-ol Verde Each 1 50.00 50 940 Inaba baddlow prevention wino , . . .
Each
_ _
1
90.00 110____
_
9.11
9.12
Metal naw Mastic viler tanks Misr (Dwaine apace In Me below.
Use OM Nem 10 a nacessay)
Each
Indicate Unit of
Measure Below
3 975.00
1125
_
- -- - - - -
Instal shaver wit - -.
Each
- 1911.00 -
-
--
- ,- -- - -
Water pump
Each 3
145.19/ -
UNIT OF
MEASURE QUANTITY
UNIT PRICE
USL
435
a ITEM COST
(S US)
10- OTHER BID ITEMS ITEM DESCRIPTKIN
SIZE
Provide 24
wind security personnel
hows per day dab* the Mire
10.1 DAYS 0
*make of the contract
10.2 Replace Idthen tablershelf Each 150.00 o
10.3 0
10.4 o
10.5
.
10.0
10.7 o
10.8
o
0
10.9 4
o
10.10
.
. ....
......._
._ _. _
10.12 1.-
10.13
. _....
10.14
0
o
10.15
Estimated BID PRICE 66036
S CPA CONTRUCT1ON PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by the CPA Acton Officer) CPA PROJECT NUMBER:
CPA PROJECT TITLE: BID ITEMS
Bathrooms for A - Wing, B - Wing, and C - Wing Buildings UNIT Of UNIT PRICE ITEM COST 1 PERIMETER SECURITY IT DESCRIPTION SIZE MEASURE QUANTITY (3 US) (3 US) Repair penrneter wal (conCnill Of
1.1
hoick construction) SM 0
Construct new perimeter wall
1.2
--
(concrete or bridt construction) SM Construct Precast ccecrete palmier well Shi SM
1.3 Repair perimeter Terre (Mesh 0 14 Unshod ram pedemitor wad (steel) SM 0 _____ COnStruld new steel chain link fence 3 meters high SM 0 Install ee.lchg plates 1 meter high IN 0 _
1.5 0
Repair entry/eat gate
1.8 Install new entry/ext gate Each f i Veto:* "SaiN Porr Each 0 .. — _
1.7
.
.
1.8
1.9
1.10 Man "Saly Port' Each
Install razor wire an Mara fence or owl LIM Prepere surtece and paint edisdng gales Or 1111Mea WM 1 coat primer and 2 colts oil p* SM 0 Proper* IOW* and paint existing painter wed WM 2 mats water lased paint (latex) SM Other (Describe wine space below Use Bid item 10 If necessary) Sidles* Urn Of Wean Below
•
0
..
Complete structural WW1*, guard _ Each 3510.00 Sear with steel roofing 0 UNIT Og UNIT PRICE (5) ITEM COST 2 SITEWORK ITEM DESCRIPTION SL21 MEASURE QUANTITY US) I (3 US) Remove and depose off site al trash
2.1
aid deons sm
o
—
Dernoish stream untie and
depose of all debris
LS
0
GrarAng and ieveing of ground (to Include removing protruang objects
2.3
from grusid) SM
0
ReP•Ir alPhill Moments or
2.4
walkways BM 0
Replan, whet! grammes or
2.5 SM
wailorays
0
Ruder concrele pavements Or
2.6
walkways 0
Replace
concrete pavements or
2.7
walkways
SM
0
Repair caw twe at moments**
2.8
railways
SM
Other In Oa beam
2.9 Indiana Val of
(Osecdbro space
Use Bid Item 10 II necessary) Meows Below 0 .
COMMIE* COOMOO wry seeps Each --r— 5 ] 150 00 750 C.onistruct concrete entry ramp Fad')
- --
—
400 00
0
UNIT OF
UNIT PRICE ($.-
ITEM COST
3. FLOOR SYSTEMS ITEM DESCRIPTION SIZE
MEASURE QUANTITY
US)
($ US)
Pressure wash and clean existing
3.1
doors
1 00 0
_
Remove and dispose damaged floor 315
--
coatings SM I 00
315
•
3.2
3.4
I
16 00
3.3 instil new Soar coverings SM 315 4725 Repair structurally damaged floor slabs SM
15.00 0
•
CPA CONTRUCTION PROJECT BID SHEET
3.5
50 Install new reinforced concrete floor slab (specify thickness in bid) SM Other (Describe in the space below.
" Indicate Unit of
We Bid Item 108 necessary) Measure Below Repair stairs SM
15.00 0
Lid
Instal stairway ii 18.00 0 UNIT OF UNIT PRICE (j ITEM COST
4- WALL & CEIUNG SYSTEMS ITEM DESCRIPTION S
MEASURE QUANTITY
US)
(S DS)
Remove damaged plaster from wags or oelIngs arid repair Wei mortar
4.1
enWor gypsum piaster as required SM PrePMe wall or ceiing-s - urface, apply 1 coat primerisealer and 2 coats latex
4.2
.
(water based) paint --
SM 4.00
970 3880
Prepare mil or ceing surfem, amity
-
1 coat primedseder mid 2 coats ol
4.3
based paid SM 0
Demolish unsound vane / ceilings and
4.4
deposed al debris 2.00 Jo
--
Build new masonry wall MI
4.5
mortar/daster finish SM 170 40.00 8100 Remove damaged ceramic tifc real 1 4.6 covering and Instal new tees SM _ _ _
4.7 MOW> Unit d
Other (Deecnbe in the space below.
Use Bid Item 10 If necessary) Okumura Below
--
-
Fe M vial opening" SM 40.00 5 - ROOF SYSTEMS ITEM DESCRIPTION S Instil suspended ceiling SM 10.00 0 move suspended coiling SM 200 UNIT Of MEASU QUANTITY UNIT PRICE ($ US) 0 ITEM COST ($ US) _
5.1 Rased joints arourid roadies_ SM - .
Replace mid seal damaged or
5.2
missing roof tiles __-1 SM 30.00
5.3 Repair parapet walls, fascia, or weal .._
5.4 Instal new steel roof panels SM 16.00
5.5
Clear roof drain ond downspout .._..
"
-
5.6
Metal rod drain
5.7 Meld new downspout Each i 0 80.00 800
5.8 Other (Describe in the ewe below.
Indicelle Unit of
Use Bid Item 10 i necessary) Measure BOW UNIT PRICE IS US) 0 ITEM COST ($ US) DESCRIPTION
6. DOORS & WINDOWS ITEM S A38J QUANTifY Instal now wooden holomcore door
6.1
(epedfy Ma) E51I 30.00
Instil new wooden door frame . - - - 82 0085!T 804 _. . . . _
0.3 Each 50.00 0
Instal RIM steel door (specify rito) Steel double door Each 160.00 0
6.4
High eaculty steal bare
150.00
_. ..
Meal now isei door frame Mperely sized 35.00 1750 Each 50
6.5
__. . . _... ..
AL
.
_
Steel double door frame Each 100.00 new mid Instal deseolt loct fundsh 3 sets of keys Each 10.00 Lock mild high semi* deal bows door Eadi 25.00 Pint seeing door (1 coat pdmer +2 coats oil painD 0 Instal ollier tylm- Of - door (sped', ste en. , ir ej_ ) Each 0 Ballroom MI door Each 50 20.00 1000
S CPA CONTRUCTION PROJECT BID SHEET
0.7
8.8
Remove broken window glass and replace with new glass in ek.sting frame Peepers rough opening Frl wail and Instal new window frame and glass (moody eke In bid) Eta 40 00 0
6.9
Frame Offy
Instal steel sea" bars (bun* bars) on widow 2500 2500 0 11911 socunty sled bars Eta 42 5000 2100
8.10 Clean ersting modows gm 0
8.11 Paint oxisbng window frames 8.12 011w (Desaibe in the spaaa below.
Use Bid Item 10 if nooassary) EA FT- riticate Unit of Measure Below 0
7. ELECTRICAL SYSTEMS ITEM DESCRIPTION SIZE
UNIT OF
MEASURE QUAWIITY
UNIT PfbCE (3
US)
0
ITEM COST
(S US)
7.1
Install new nil -mounted elm:Moll Ming (specify vAre type IL diameter) LU 0
7.2 Instal new eiectoicai outlet Eta 17.00 0 ,-
7.3 MOS new wall switch Each 5 18.00 80
7.4 'natal new aourescenllght fixture Eta 40.00 Instal new bulkhead vandal proof VW Each 30 200.00 8000 Install nighlfghts Each 30 17.00 510
7.5 Install new cells fan Each 40.00 . -- p
7.0
Instal ming fan enclosure Each 100.00 Install new telethons cable (angle pair) 0 0 .
_ .
7.7 tnstalt new telephone tack Each
40.00
0
Install new circuit freeker (weary
7.8
type and capacity) 10 10.00 100 Instal new circa! trealux panel (speafy number of breakers and
7.9
capacity) 750.00 3750
Instal new isolation switch (specify
7.10
type and capacity) Each 250.00 Instal new mars transformer (specify
7.11 type and capacity) Each 0 !Instal new mans cabling (apecify type
1.12 and size)
.:
'Instal new electrical generator with changeover switch (specify make,
7.13 model, and - ) Each 0 Metall new fuel tank tor generator (with capacity to operate generator tot
7.14 72 hours continuously) Each 0 I ktstall 1101I exterior security !Wiling
7.15 t.(SPearY type and alm) on buildings Each Metal new exterior security lighting (specify type and size) on perimeter wall
7.18 iOther (Descrbe in the space below.
_
!Use Bid Bern 10 if necessary) Each Indicate Unit of Measure Below UNIT OF MEASURE QUANTITY 0 Vilt PRICE (3- 1TEM C1X7 - US) (S US) 8 - MECliANICAL SYSTEMS STEM DESCRIPTION SIZE Install new window as conditioning
8.1
wit (specify number of watts/amps) , Instal new spit as conditioning 1.1111
0.2
(specify number al tam)
450.00 0
Each
0
Install new exhaust fan and ductwork
8.3 kM 0
8A Inelail new ar supply ductwork
-
8.5 Install new ae exhaust ductwork UA 0
•
•
CPA CONTRUCTION PROJECT BID SHEET
8.8 Other (Describe in the space below Use Bid Item 10 if necessary) indicate Unit of Measure below 9 - SMUTART & WATER SYSTEMS ITEM DESCRIPTION SIZE UNIT OF MEASURE QUANTITY UNIT PRICE (5 US) 0 ITEM COST (5 US)
9.1 IMMO new Eastern aye toilet Eath 20 00.00 1000 _ 92 Install new Western style tole Each 0 92 !Teat and dean sanbay dratt_pipes Each 60 10.00 000 Install new sanitary drain pipes 9A (specify diameter and type) --[ LM 12.00 0 . 9.5 as _ _..
-
9.7
Clean and repair exisbng septic tanks (to include new lacking hatch covers) Each 0 .
Install new Septiciank (to incliAle .locking hatdi covers) Each 0 Remove Meeting septic tanks and manholes Each 0 Instal new porcelain sink with sout-off Wass Each 10 150.00 1300 _
9.8
IMO new water piping (specify size and type i.e. PVC, steel. copper...) IN o
9.9 InMaN nem malt shut-off valve 5 50.00 280 ., ..
9.10 Instal bacidlow prevention valve East 5 90.00 480
9.11 MIMI new plastic water Mat
9.12 Include Unit of
(Ciescrabe
Otter in toispeoe below
Use Bid lent 100 neassemy) Measure Below Each 5 375.00 1875 0 _ Each Instal shower mat 150.00 30 4500 Water pump Each ..14:66 ' UNIT OF
10- OTHER BID ITEMS ITEM DESCRIPTION SIZE
:Provide annod security personnel 24 hours per day during the entire
10.1
duration of the contract
MEASURE QUANTITY
UNIT PRICE ($
US)
o
ITEM COST
(8 US)
DAYS 0
.
102 1-: ach
Replace kitchen table/shelf .
150.00 0
10.3 0
10.4 0
10.5
10.0
0
...
10.7
0
10.8 0
10.9
0
_ .
10.10 0
10.11
0
-.-.- .
10.12 0
10.13 0
10.14 0
10.15 0
Estimated BID PRICE: 43345
•
•
CPA CONTRUCTION PROJECT BID SHEET
•
•
•
CPA PROJECT INFORMATION (To be competed by the CPA Action Officer) CPA PROJECT RUNDE*
-
CPA PROJECT TITLE: BID ITEMS
Female Holding Building
i - PERIMETER SECURITY ITEM DESCRIPTION UNIT OF SIZE MEASURE QUANTITY UNIT PRICE (S US) ITEM COST ($ US) Repair perimeter wall (concrete or briric
1.1 construction)
.
.
:Conan/of new ponenefew noll
1.2 ' (concrete or brick construction) o Construct Premed concrete periMeter wee
1.3 Repair pedalo* fence (steel) 0
1.4 Combed new pelmets' will (aleel) Can1 new Meal ledt fence chin =We SM 0 3 tigh Well steel dig plates 1 manor NO ._ _..._ .
1.3 Rap* antryfaxe Eadi 0
1.6 Wel new edry/ed gals
-
Vehicle 'Slay Per
--
welt* POW
--- -- - —
Install razor wire on existing fence or
1.7
Wail U.N 0
Prepare surface mid print existing gates or fences with 1 coat primer
1.5
and 2 coats oil paint 0
Pewee sterece and paint existing _
- -
pariniter eel vett 2 coats water
1.9
bated paint (latex) SM
0
1.10 Other (Desaibe in the space beiow.
Use Bid Item 10 3 necessary) , Incficate Unit of Measure Below 0 I.
Compete structural =Web guent timer with steel roam I Each 3510.00
2- SITEWORK ITEM DESCRIPTION SIZE
UNII OF
MEASURE
QUANTITY
1
UNIT PRICE if
US)
2.1
0
11EN COST
(S US)
0
2.2
2.3
2.4
_
___
_
2.5
Remove and dispose off Sae all trash and debris _ - _ Demoest unsafe structures and dispose of at debris IS 0 ___....
Grading and leveing of ground (to Include removing protrudeng objects , from ground) .
Rep* asphal pavements or
walkways
R9911 101
9SPIIIE Polemels Cr
weenie* 0
2.6
Repair concrete pavement@ is 'Maws o
2.7
2.8
—
— 2.9 Replace concrete pavans*. or wellaiteys - - Rep* other typo of pavements or wellerrays SPA Otner (Desonfie in Me space below.
Use Bid item 10 if necessary) Macao kid Ileum Below 0 _ _
3- FLOOR SYSTEMS ITEM DESCRIPTION SIZE
0
_.
Construct concrete entry steps Each 1 150.00 150 _ Coneuct concrete salty ramp Fad) 400.00 0 UNIT OF UNIT fame (5 ITEM COST MEASURE JN4TITY US) (S US)
3.1
3.2
Pressure wash and clean easing Soors I SPA too 0 Remove and choose damaged floor Covls SM 124
1.00 124
—
3.3 Instal new floor coverin set 124 15.00 1800 34 Repair structurally damaged floor slabs SA4 15.00 0
•
CPA CONTRUCTION PROJECT BID SHEET
- -
32
3.8
Install new reinfaced concrete floor slab (specify thickness in bid) Other (Describe in the space below.
Use Bid Item 10 if necessary)
- ---... - SM
Indicate Unit of
Measure Below
0
0
-
Repair stairs SM 15.00
Install stairway reline LM 18.00 MT-15F MEASURE QUANTITY clorpRocE (S US) a ITEM COST (S US) 4 - WALL & CEILING SYSTEMS ITEM DESCRIPTION 5 Remove damaged plaster from wale or cenngs and repair wen wiener
4.1
ancVor gypsum piaster as required Prepare wall or ceiling surface. apply 1 coat primer/sealer and 2 coats latex 42 Owner baae SM 502 4.00 2000 Prepare wall or ceiling surface, apply 1 coat primer/sealer and 2 coats ol
4.3
based paint SM 0
Demollell unfound walls / ming* and 4A dispose of all debris SM 2.00 Build new masonry wall with
4.5
mortarLibister lash
SM 30 40.00 1200
Remove damaged ceramic tile wal
4.8 sm
covering and VISial new ties
4.7 Other (Describe in the space below.
Use Bid lam 10 if necessary) Indicate Unit of Menem Below Fl in wee openings SM
40.03
0
0
Sh1 1--
Metal suspended wing 10.00 Remove suspended iMelg SM UNIT OF
5- ROOF SYSTEMS ITEM SIZE
DESCRIPTION
MEASURE QUANTITY
2.00
UNIT PRICE (S
US)
0
ITEM COST
(i US)
-
5.2
Reseal joints around roof tees Replace and seat damaged or missing roof ties SM 0 SM 30.00 52 RepaPperapel wale. fascia, cr eaves SM 0 _
5.4
Instil nix/steel roof panels SM 18.00 0 52 Omer rod drain aid dovnispout Each , , 56 Metal new roof drain Each .1_ _ !I_ _
5.7 Instal new downspout Each 4 80.00 , 320
5.8 Ogler (Descrbe in the space below.
indicate Una of
Use Bid item 10 if necessary) Measure Beim UNIT OF MEASURE QUANTITY UNIT PRICE ($ US) 0 ITEM COST ($ US)
6. DOORS & WINDOWS ITEM DESCRIPTION SIZE
Install new wooden ho-core door
8.1
' (y size) 30.00 0
Instill new wooden door frame .
_
01__Neste________
--i- Each 0
8.3 Wel new steel door (specify size) Each 50.00 Steel Ong* door Each 180.00 E4 HO security deal hers Each 5 150.00 750 MANI door *sine new Neel (epadhy SIZI ) ' 12 35.00 420 Sled douhis door frame 100.00 Inds. new desma belt and knish 3
8.5
eels of keys 10.00
Lock set for high security steel bars door
25.00 125
Paint westing door (1 coat primer + 2 coals ol pan) SM held type door other ot Bps* eize
8.0__ 0
and type in bidl_
_ .._ . _
Ballroom Neil door Each 7 20.00 140
• CPA CONTRUCTION PROJECT BID SHEET
1 6.7
6.8
Remove broken window glass and replace with new glass in existing frame Prepare rough opening in wal and Instal new Window frame and glass Ate in bid) Each
-
40.00
1
23
Frame only Each 25 :00
Instan steel socially bars (burglar 69 be1)rxl window Each 2500 , _ High assolly sled barb Each 23 50.00 _
6.10 Clean adding weldtivis SM
-
i 6.11 Paint existing window frames 6.12 Other (Describe or the space Oelow thee Bid Item 10 tf nwremery) EA Indicate Unit of Measure Below _ _ 0 0 575 0 1150 0 0 _ _
7. ELECTRICAL SYSTEMS ITEM DESCRIP'HON SIZE
UNIT OF
MEASURE QUANTITY
UNIT PRICE (S
us)
0
ITEM COST
(s US)
71
Install new surface-mounted electrical weIng (spay wire type 5 diameter) ._ ._ _ _
7.2 Instal NM alectikal Guist IN 0 Each 3 17.00 51 . _.
7.3 Instal new me switch Each 10 18.00 180
7.4 Install new flourescent tight Wire Each 40.00 0 Instal new bead vandal prool NM Lath 10
200.00 2000
7
10
Install fichlIghte EaCh 17.00 170
7.5 Instal new cding tan Each 8 40.00 320
7.
6
_ .
Instal ceiling fan enclosures Earth 0 100.00 NO Install new telephone cabin (single ,9111 ) _ .
Ea& 0
•
7.7 Instal new telephone jack Each 1 40.00 40 _ Instal new circuit breaker (specify
7.8 type and capacity) Each 4 10.00 40 Instal new circuit breaker panel (specify number of breakers and
7.9
capacity)
Eadli 1 750.00 ygg
.
_
Instal new isolation switch (specify
7.10
type and capaaty)
1 260.00
. Instal new mainstransformer (spenty -- 7 .---
7.11type
and capacity)
WM
0
lInstall new mains cabling (specify type'
7.12
'and size)
Ill 0
,Intdall new ek,..t....al generator with !changeover switch (specify make.
,
7.13 )modai,
and capacity) Each j
0
nstal now fuel tank for generator vah capacity to operate generator for
7.14
7.15
72 hews continuously) Each 0 Instal new secretly fightise „(epidly type and spa) Hon busangs Lath 0 _ , _ _ Instal new exterior security ligtilng (52!SS n and size) on perimeter watt Each 0
7.16 Other (Climate in the space below. . ____._ thiiiii Id. nca.
_
Use Bid Item 10 if nedwisary) Mammas Mow e- MECHANICAL SYSTEMS ITEM DESCRSOnON SIZE war OF MU PRICE (5 MEASURE QUAN1TTY US) 0 ITEM COST (6 US)
0.1
82
bold new windyw air oonditioring UM (kberIumber of watts/amps) Each 450.00 0 Instil new spin sk conditioning unit (iiimdlY nu.mbl.ir 011888) . .
Each
6.3 Instal new ethanol tan and ductwork LM 0 0
8.4 Instal new air supply disdwork •
8.5 Instal new air admit ductwork LM LM 0 _
• CPA CONTRUCTION PROJECT BID SHEET
86 Other (Describe in the space below Use Bid Item 10 if necessary) indicate hod of .
Measure Below
9 - SANITARY & WATER SYSTEMS ITEM DESCRIPTION SIZE
UNIT Of
MEASURE QUANTITY
UNIT PRICE (S
US)
0
ITEM COST
(SUS)
9.1 lased new Eastern style toilet Eadi 9
80.00 720
.
9.2 Instal new Western aye told 93 Test and clean sanitary drain Mem EwJi 4 10.00 40 WWI new sanitary drain pipes 9A specify diameter and type) .. .89.-.._ 12.00 720 Clean and repair existing septic halal LS 0 (tc include new locking habth comae) Install new septic tank Bo indude _ 93 locking hatch COONS Eadi o Remove coasting septic Wks and manholes End) o _ 1 Install new porcelain Mahwah staa-MI
9.7
v4ves Eadi 10 150.00 1500
...........
•
9.5
Instal new water piping (saga, aim and type i.1). PVC. steel. copper...) LM 0
9.9 Instal new main shut-off valve Eadl I 50.00 50
9.10
Intel barichow preveabon valve Eedl 1 90.00 90
9.11
9.12
Intaal newptastic water tanks Each 1 375.00 375 Other (Delsoihe in the space below.
indicate Unit of'
Use Bid Item 10 11 necessary) Measure Belo" 0
-
. -........_
....
Each
Instal shower unit - 150.00 4 600 Each 1 Water pump 145.00 145 UNIT OF
1.1MT PRICE (5
ITEM COST
0 - OMER IND MINI ITEM DESCRIPTION SIZE
MEASURE QUANTITY
US)
(S US)
Provide armed security personnel 24 hOurs per 68y durin3 the entire
10.1
duration of the contract DAYS 0
10.2
Replace kkhen table/shalf Eadi 150.00 o
10.3 0
10.4 o
•
10.5 o
10.6 o
10.7 o
10.8 o
10.9
10.10
0
10.11 o
10.12 o
10.13 o
10.14 0
10.15
Estimated BID PRICE: 17663
•
• CPA CONTRUCTION PROJECT BID SHEET
CPA PROJECT INFORMATION (TO be Completed by the CPA Acboa Officer) CPA PROJECT NUMBER CPA PROJECT TITLE:
. Juvenile Holding Building BID ITEMS UNIT Of MEASURE QUANTITY UNIT PRICE (S US) ITEM COST (S US) 1 - PERIMETER SECURITY ITEM DESCRIPTION SIZE Repel perimeter mil (concrete cc
1.1 0
brldccominiclon)
_
COnelmot Ilia Perilieler Wel 12 (concrMe or brick conetructko) Conetnect Pammt concrete penmen'
1.9 RepeSperimMer tenor (Wool)
1.4 Camelot newpenmeler wall (steel) Construct new steel chaln link fence 3 MORS high I SM 0 Instal steel atg pkTes 1 meter high 12 Repair entry/exit gate 0
• — --
1.0
hold new entry/exit gate
Lath 0
Valid. 'Slily Port'
Man "Saily Pocr 0
Install razor wire on existing fence or
1.7
wall
LOA
Prepare surface and paint wasting gales or fences yid' 1 coat Omer
1.8
arid 2 coats at paint
SPA
Prepare surface and paint etiallig perlmter 'wall wth 2 coats water
1.9
based paint (latex) SM
1.10 Other (Describe in the space below.
Use Rid Item 10 it necessary) Indicate Unit of Measure Below 0 0 Complete struchral concrete guard laver with steel rooting Each 1510.00 — —.
0
UNIT Of
UNIT PRICE (3
ITEM COST
2- SITEWORK ITEM DESCRIPTION 5
MEASURE QUANTITY
US)
(i US)
Remove and dispose Welts si train
2.1
sal debris OM 0
Demolish tnsafe stmdures end
2.2
dispose of el debts LS
0
Gracing and levering of ground (to ledode reincermg reotruding obiecis
2.3
from ground) OA
— Repair asphaR pavements or
2.4 walkways
go
_
Replace asproll pavemerts or 25 vialinvays MA _ [Repair concrete pavements or 24 walkways _ Replace concrete pavements or
2.7
vraikways
0
Repair other type of pavements or
2.8 DA 0
walkways
2.9 Mdbels Una Od
' Other in the.e below.
(Describe
Use Bid Iten110 If necessary) Measure Below ConabuCt concrete entry steps EaCh 2 150.00 _l 300 Idonsouct maga edgy ramp Each 400 00 ( - 1 - 11.lito- F 0 UNIT PRICE (3 ITEM COST 3 - FLOOR SYSTEMS ITEM DESCRIPTION MEASURE QUANTITY US) (3 US) Prilisure yawn aid Own wasting
3.1
floors SM
I.00 0
Remove and dispose damped Roar
3.2
sm
overtop 194 100
194
3.3 Instal new floor COVIONIS - SM
- r
Repair Boor sinicaraiyainisoed ,
3.4
slabs 1
sm
194 16.00 2910
15.00 0
• CPA CONTRUCTION PROJECT BID SHEET
- 3.5
3.8
InstMlnew rei,kgced concrete Sod slab (specify tidiness in bid) Other (Describe in the space below Use Bid Item 10 if necessary) SM Incfmate Unit of Measure Below SM Repair stairs 1&00 0 LM Mold shiliway dine 18.00 0 UNIT OF WIT PRICE (S MI COST 4 .WALL &CHUNG SYSTEMS ITEM DESCRIPTION SIZE MEASURE QUNUTY UM ($ US)
4.1
4.2 SM
_42
4.4 SM 5 2.00 10
4.5 SM 14 40.00 580
4.8 WA
4.7 In:kW Ur* of
I I 1 g Itillifilf
. '2 IA 11014-e
I ' 4RA-;„44
6 :54itia
ita II ' r hq
SM 0
720 4.00 - 2880
Ski
1 • L
!I
' I .
Measure Wow
SM 4040
SM 10.00
0
-
WA 2.00
I
0
UNIT OF
UNIT PRICE
($ ITEM COST
5 - ROOF SYSTEMS ITEM DESCRIPTION SE
MEASURE QUANTITY
US)
(5 US)
5.1 Reseal
joints around root Nes SM
_
Replace end seat damaged or 52 mishiroof Wes SM 30.00 0 _.____ .
_ _
5.3
Repak parapet was. fascia. or awes 0
8.4 Instal mod Mei roof penis SM 1800 _
5.5 Clem roof drab and rbrirespout
-
5.8 Instal roof drain 0
- •
-
6.7
5.8
Install new downspout
Other (Desathe in the space below.
Use Bid Item 100 necessary) Each law 320 Imitate Unit of Msescre Below utarr OF 8 - DOORS & WINDOWS ITEM DESCRIPTION S MEASURE QUANTiTY Instal new wooden nceow-oxe door 81 (specify size) _ _ Instal now wooden Om( Name 82 (spedfy size) Eado 3 UNIT PRICE US) 0 ($ ITEM COST (5 US)
30.00
1
8.3 Instal new 'test door ___Ivecks_i tos OW MON door Eadi Each
50.00
.. .
.
180.00 J
High sedsly 'awl burs Each 8 15040 Instal new deal door frame (spedly 0 0 1200
8.4
Each 11 3500 365
_
i 8.5
!
'
8.8
Stasi daub* door frame Each 10100 0 Instal new &Whoa kelt and furnish 3 sob of keys _ Plch 8 1800 80 Lock set for hip secunty steel oars door Each 25.00 0 Paint exisdng door (1 cost Flaw + 2 amiti c il Pei_______ SM 0 Instal other type of door (specify size and bite In bid) Each I I Bete °an stall door Each 20.000
• CPA CONTRUCTION PROJECT BID SHEET
1
Remove broken window glass and replace with new glass In mdetIng 87 frame SM J 0 efelmira rough opening in vial and initial new **slow frame and glass 68 40.00 (eltecify size in bid) 0 Frame only 18 25.00 instd steel seas* bars (t•urplar
8.9
bars) co window Each 25.00 High MOAN Steel hire Each 18 50.00 000
6.10 Clean existing window* 0
- - -
8.11 Paint existing dow frames 6.12 Other (Descnte In the space below.
Use Bk1 Item 10 if necessary) EA Indicate Unit of Measure Below
7. ELECTRICAL SYSTEMS ITEM DESCRIPTION SiZE UNIT OP MEASURE QUANTITY uwr PRICE (5 US) 0 rfrm COST (S US)
•
7.1
Instal new surface-rnourded elecbical wiring (specify wire typo 3 diameter) LM 0
7.2
Instal new electrical outlet Each 17.00 51 3
7.3 McCall now wall swtch Each 19 18.00 342
7.4 Instal] new nouresceni IVA fixture Instal new bulkhead vandal proof Each 00 Each 10 200.00 2000 T4tits Instal nightlights 10 17.00 170 _
7.5 Instal new cane tan Each 9 10.00 380
7.13
instal oiling fan enTbsuree Each 9
--1 • 100.00 000
Instal new telephone cable (sixes Each pro 0
- -
•
7.7
Instal new Islephenejadr ....
Each
40.00
----
-------
Instal Mod Weaker
new (specify
7.8
q.pe and
.ctipedly)
Instal new circuit breaker panel Each 9 10•00 ..4 ___. 10 _ . ' breakers (specny number of and
7.9
- • - v )
Each 1 750.00
750
lama. new isolation switch (specify
7.10
and capacity) Each 1 250.00 250 Instal new mains transformer (specify
7.11
type and capacity) Each 0._ Instal new mats cabling (specify two
7.12
and am) US
Instal new electrical generator with changeover switch (specliy make.
7.13 model. and .i:apeoltyl Instal nevi fuel tank tor generator (Mai capacity to operate generator for
7.14
72 hears CONInuouSly) Each 0 instal new exterior security 1phtlee
7.15
:„;„,:..4 type and We) onbaOchis 0 new exterior woozily Instal lighting
•
. type and size)
7.18 Other (Describe in the space below.
Use Bid !tern 104 necessary) on perimeter wal Belt 0 indkale Urdt of Pasommwe Below _ UfirOF MEASURE QUANTITY
3. MECHANICAL SYSTEMS ITEM DESCRIPTION 5
Wall new window air conditioning
8.1
unit (specify number of waits/amps) 4 Each 450.00 _ Install new spN sir conditioning unit '
8.2
(specify number of ions)
0
UNIT PRICE ($ ITEM COST
US) (8 US)
0
0
8.3
Instal new mdieust fan and ductwork
•
OA
Instal new air supply duchvork
8.6 Instal new air advent dichwirk kfA 0
S CPA CONTRUCTION PROJECT BID SHEET
86 Other (Descnbe Ii the Si:We below Use BM Item 10 if necessary) Incbcete UnA of Measure Beim
9- SANITARY & WATER SYSTEMS ITEM D5CRiPTIOt SIZE UNIT Or MEASURE QUANTITY UNIT PRICE US) 0 ( ITEM COST J (3 US)
9.1 slyM WM Et 9_ i_
89_00_
720
_
92
9.3 Eath 40
94 LM 48 12.00 676
9.5
_
9.7 E.dl 9 150.00 1350
911
' 11 1 . 1 X I
_
99 50.00 50
I it 1 :4 I
it 0 1 44 I
Eadr 0
_
_ _
I
4
10.00
et!
I 11
Each 0
9.10 Eath t 90.00 80
9.11
9.12
Install new ptasbc water tanks Other (Describe in the apses below.
Uss Elld Item 10 N necessary) Each 1 376.00 375 POWs UM Of Measure Below 0 Install shaver tait
150.00
300
Water
pump
145.00
0
UNrrOF
UNIT PRICE
(3 ITEM COST
19 - OTHER MD MI6 REM DESCRIPTOR SIZE
MEASURE QUANTITY
US)
(3 US)
Provide armed security personnel 24 hews per day durep the entire
10.1
emotion re the contract DAYS
10.2 Replace lechen tablaMhalf f Each 0
150.00
10.3 o
_. _
10.4
0
_ _ __
10.5 0
10.6 0
10.7 0
10.9 0
10.9
0
10.10
o
10.11 0
10.12
_ _ _
10.13
0
0
_
10.14
10.15
Estimated BID PRICE: 18643
•
-.
• CPA CONTRUCT1ON PROJECT BID SHEET
CPA PROJECT INFORMATION (To be completed by Ow CPA Action Officer) CPA PROJECT NUMBER:
_ -
CPA PROJECT TITLE: Segregation Building BID ITEMS f 1 - PERIMETER SECURITY ITEM DESCRIPTION UNIT OF SIZE MEASURE QUANTITY UNIT PRICE (S US) ITEM COST IS US)
1.1
1.2
Repair perthebx wall (concrete or trick con.struction) - SM Construct new penniater wall SM (concrete or brick construction) 0 Censtruct Precast comet* patentees well SM 0 SM
1.3 Repair perimeter lance (sres) 0
1.4 Conettuot ma perirneler well (Meek ConaSuE new weel chain ink fence SM 0 3 meters high MIMI Meal de Mass 1 male( high _
1.5 Raper entryfeaksate ESut 0
1.6 Instal new efVfedt gate Vehicle •SePy Port* 0 _ Men 'SMARM" Seth 0 Install razor fence vete on wasting or wal
1.7 --I
Prepare surface and paint exkung notes or tences with 1 coat pnmer ta 1111111 2 coats a paint SM 0 Prepare surface and paint enastog pewter Weil yeti 2 coats water
1.9
1.10 based paint (latex) SIN Other (Desalt* in the apex below.
-1-
Use RIO Item SOW necessar)) Imitate unit cf Maasiire Below Complete Madura concrete lower with steel reeling Cacit 2510.00 0 UNIT Of MEASURE UNIT PRICE (S STEM COST QUANTITY I US) (S US) DESCRIPTION
- SITEWORK ITEM S
Remove aid Papaw oft Meal trash
2.1
awl dans SM 0
—T
Demolish unsafe students aid 2,2 dispose el ail debris Ls 0 Grading and kayoing of ground (to hclude removing protruceng ob(ects
2.3
from ground) SM 0
Repair asphdt pavements or
2.4
walkways SM
0
t
---
Replace asphalt pavements of
2.5
walovays SM 0
Rep* concrete pavements or
2.6
walkways
- --
Regime commie or
pavements
2.7
web**
SM 0
Repair other Imes ct pavements or VS wellese al 0
2.9 Other Pemba In Me space below.
Wads Ure of
Use Bid Item 101
neossary)
Mouse Below
0
CAIISOUCt 0011CRIMI entry slaps Each 2 150.00 — — — *metro* *mantle entry man Esel 400.00 0 MIT OF uF47 PRICE - 5 ITEM COST 3 - FLOOR SYSTEMS 11511 DESCFtIPTION St MEASURE QUANTITY UM (S US) Pressure wash and dean existing
3.1
Room SM I.00 0
Remove and dispose darnaged floor 32 coverage SM 214 1.00 214
3.3 Masi now icor coverings sm 214 15.00 3210 Rep* floor eturacialy cameped
3.4
slobsSM 15.00 0
• CPA CONTRUCTION PROJECT BID SHEET
3.5
3.6
natal new reinforced concrete now slab Lspec.littkiiness in bid) Other (Describes the space below.
Use Bid Item 10 if necessary) .-.1 SM Indicate Unn of Measure Below I _ .
0
- - -----,
,
- - Sal I
Ftranerr stria -
Instal stairway railing
Liii
LIMIT OF
MEASURE QUANTITY
15.80
0
15.00
0
UNIT PRICE
(9 rftM COST
U5)
(5 US)
•
4 - WALL a CEILING SYSTEMS ITEM DESCRIPTION SIZE
- Remove damaged plaster from walls or ceilings and repair with mortar
4.1
and/or gypsum piaster as required SM 0 Prepare wall or milling surface. apply 1 coal primer/seeder and 2 coats Latex 42 (Water eased) p SM 960 4.00 3800 Prepare well or cells) surface apply 1 coat pflineiMeater and 2 coats of
4.3
based alnI SM 0
Demolish unsound wails / cegs and
4.4
4.3
4.8
dispose or all delxis SM 3 LOG 6 13tild new masonry sal with mortar/plaster fifth SM 27 40.00 __1 1090 Remove damaged ceramic Me will covering and indal new des SM 0
4.7 Other (Desoto in the space below.
Made Unit of
Use Bid hem 10 W necessary) Mears. Below
-- -
. _ .
Fill in wet openings
Sal 40.00
I-.
Install suspended ceigng
suspended oaring - Remove
- SM 10.00
5- ROOF SYSTEMS ITEM DESCRIPTION SIZE
SM 2.00
0
UNIT-Of
MEASURE QUANTITY
-uNrr PRICE
ti ITEM COST
US)
(S US)
0
- -
5.1 52
Resod loinra around roof tees Regain and Mil damaged or SM missing roof Sea 30.03
5.3 Repair teapot wok. feeds. or eaves SM
5.4 -- flaw Meal mot panels SM
-- - - -- - - -
1600
- - -
- -
, ___ ..
0.5
5.6
5.7
5.8 -
gam roof draln mu! dismissed Each _ Metal new reef drain Each 0 0
•
Instal new downspout Each
Other (Descare in the space below.
Use Bid Item 10! necessary) Indicate Unit of Measure Below 12 813.00 900 s - DOORS & WINDOWS ITEM DESORPTION SIZE UNIT OF MEASURE QUANTITY
-UNIT PRICE
US)
0
(t flVit COST
ii US)
11.1
_.62
Instal new wooden holomcore door ("KIN sire) EaBi 90.00 0 Instal flew_ - en door frame
1-
OP.* 6z_V . _
Each I- -
i
6.3 _It_nstal
new sled door (mei* w0M
Each 50.00
Steel doubM door E.olr
160.00 0
8.4
Each
Nigh smarty Neel bars 17
160.00 2550
Instd new Meet door frame (spray Each 20 sin) 35.00 700 _ Sleet double door frame Each 100.00 o Metal new deedbolt lodt and furnish 3 ais sets of Sem Each 10.00 Lock setter high secure/ steel bars door Each 17 35.00 425 POT edging door (1 coal iMmor • 2 coats ol pdn SM 0 ' Instal olher two of door (specify Mae
8.6 and Ire in t Each
o
•
!Bathroom nal door Each 3 20.00 CO
• CPA CONTRUCTION PROJECT BID SHEET
61
--r
6.8
_
62
'Remove broken window glass and whew van new gtass in existing frame 0 FRiPite MU0h Opening in wal and Instal new Miaow frame and glass I specify stet hi ad)
40.00
Frame only EaCh 31 2500 •
0
775
_ _
Instal steed security bars (burglar bars) on Window Saab 2500 i- 0 High security steel bars 31 50.00 _
8.10 Clean existing windows s&i 1550 0 _ all Pant existing endow frames Other r,Describe in the space be 612 Indleas Urea, Use fild Item tot necessary) EA Measure Below o 7 - ELECTRICAL SYSTEMS hIM DESCRIPTION SIZE UNIT OF MEASURE QUANTITY UNIT PRICE (1 US) 0 rreA COST (S US)
7.1
Ms d new surface-mounted electnce Wring (specdy wire type S diameter) h what new eleancal outlet 72 17.00 0 ._ SI 72 hind new wall vetch WOO 848 7A ...__ _.
1144411 new floureseent 110M fbctt% Eai 40.00 Install nenv bulkhead vandal proof BEMs 10 20000 3600 Instal nIghtights Eade 19 17.00 323
• 7.5 Instal new ming fa Euth 17
40.00
680
Instal owing fan embalms Saab 17 100.00 1700 Instal new telephone cable (single
-PO Sad, 0
.....
7.7 Instal rww teleknone jack
40.00 40
Instal new circuit breaker (specify
7.8 18 40.00 180
type and capaaty) Saab
Instal new circuit breaker panel (specify number of breaker; and
7.9 capacmg) 750.00 750
lineal new eSdatiOn switch (specify
7.10
type and capacity) Saab 1 250.00 260 hand new malls transfomier (specify
1. 1k
s !a_rLactitj) id 0
Instal new mains cabling (sped to.
7.12
aid size)
Install new electrical generator with Changeover seta (specify make.
.
7.13
model, and capacty)
Meta new fuel tank for generator (ah capacity to operate generator for
7.14
72 hours continuously) Sad. o Instal new exterior seculy lighting
7.15
(specify type ancl size) onbtIi 0 Install new extenor security boom;
(specify type and size) on palmate! wal Each -.
0
7.16 Other (Docaibe in the space below.
Use Brd Item 10 rf necessary) Indkale I.Ma of Measure Oskar
- -- -
UNIT OF
MEASURE QUANTITY
UNI'f - MCE (S
US)
0
ITEM COST
($ US)
5. MECHANICAL SYSTEMS ITEM DESCRIPTION
Meta new window ilif centlionlitg
8.1
rre (Specify number of walla/amps) Eadi 450.00 0 Waal new spill ae et:mattering wilt
8.2
(specify number of Ions)
8.3 Maw new exhaust fan and ductwork 0
8.4 Instal new at supply duetted& UA
8.5 Instal new air exhaust ductwork UA 0
• CPA CONTRUCTION PROJECT BID SHEET
8.5 Other ;Describe kr the space below We Bud Item 10 if necessary) Indicate Unit of Measure Below 9• SANITARY & WATER SYSTEMS ffEM oEsCTIOI8 SIZE UNIT OF MEASURE QUANTITY UNIT PRICE US) 0 ($ ITEM COP (9 US)
9.1 Med new Eastern style tolet Each 18 80.00 1140
-
_
92 la** new Western** toilet Fedi 92 -. — —
--- 9,4
9.5
9.6
— ----
-
9.7
Teel and dean sanitary drain pipes _ _Each 4 10.00 40 __ _,1 Install new sanitary dram pipes (speary tharneter and type) 1200 1009 ._ Clean and repair erdstIng septic tanks (to Inckide new kicking hatch covers) 0 Install new septic lank (to Include locking hatch covers) r 1
--
Remove existing septic tanks and manholes 0 i- Install-new porcalein sink with shikelf valves Each 16
160.00 2700
•
as
Instal new water plpkig (specify eize and type I.e. rvc, steel, ccipper.,) , LM as Inatal new main situl-df valve Each 1 50.00 so 1
9.10 instaI baddloweivention valve Each 1 90.00 90
9.11 *WI new Elastic water tanks Each 1 375.00 375
9.12 Other (Describe in the space below.
Indoele Una or
,Use Bid Rem 109 necessary) Menem Below [Instal shower une — - 2 150.00 —
- - Each - -
-
Each
Weber pump 145.03
0
1 UNIT OF
UNIT MICE
10. OTHER BID ITEMS ITEM DESCRIPTION SIZE
L MEASURE QUANTITY
($' COST —
US)
(S US)
Provide lamed security personnel 24 hours per day dieing the entire
10.1
duration cif ihe contract DAYS 102 ._ Replace Mohan tahkt/shell —± Sects 0
150.00
103 0
10.4
•
10,5
0
.
_
_ _
_
10.6
0
10.7 0
102
0
_
102 0
10.10 0
10.11 0
10.12
..
-
10.13
10.14
0
0
---I
10.15
Ealleened BID FRC&
•
• CPA CONTRUCTION PROJECT BID SHEET
•
•
CPA PROJECT INFORMATION (To be completed by the CPA Action Officer) CPA PROJECT NUMBEllt CPA PROJECT TITLE BID ITEMS Generator, Transformer, and Water Tank Building uNrr or UNIT PRICE 1 - PERIMETER SECURITY ITEM DESCRIPTION SIZE MEASURE QUANTITY (8 US) Repair perimeter wall (concrete or
1.1
brick construchon) SM 0
Construct new perimeter woe
1.2
(excrete or trick construction) SM ITEM COST IS US) 0 ' Construct Precast concrete parlinsfer wail
1.3 Repair perkneler fence Nies°
1.4 Covina new minions vml (Neal) Construct new steel drain link fence 3 meters high — — install steel dig pietas 1 Misr high 0
1.5
Repair entry/eat gam
19 Install new entry/exit gate Vehicle 'Sally Port' Each r Man 'Sally Port- Each instal razor wire on existing knee or
1.7
-
18
well LM
Prepare surface and paint existing rafts Or fences with 1 coat primer and 2 Cents od pant ... _. .
Prepare surface and paint casting 2 wiener was with coats water
1.9
based paint (latex)
1.10 Other (Desaibe n the space below.
Use Eat Item 10 If neaassary) SM Inticate Una of Measure Below 0 0 0 0 .._..
•
Complete structral concrete guard Papua Peel roaring Each 3510.00 2 SITEWORK ITEM DESCRP710N SIZE UNIT OF MEASURE SMNITITY UNIT PRICE ($ US) 0 0 ITEM COSY IS US) ,
2.1
2.2
2.3
2.4
2.5
i 2.6
2.7
2.8
29
Remove dime
and off alte all knee
and debris
Demolish unsafe shut:bees and dispose of al debris LS 0 — .
Grading and leveling of ground (to inckne removing wowing 00)0CIS from ground) Raper asphalt pavements or walkways Rept:ice asphalt pavements or wallarrays SM 0 0 Repair concrete pevements or vallevays SM 0 Replace concrete pavements or walkways SM 0 Raper Wier 99e of pommels or willoraws Other (Describe m tM space below.
UM Elid rem lo If necessary) SM 0 moose UnIt of Meagre Beim 0 Construct cony*. entry slaps Each
150.0
[…اقتُطع العرض هنا — النص الكامل في ملف التنزيل]
الرئيسية / وثائق وزارة الدفاع الأمريكية / DOD-5b6c1765
وثائق وزارة الدفاع الأمريكية
08-F-0260 Doc 02 Final Release
- التاريخ
- 11 كانون الثاني 2004
- النص متوفر
- الإنكليزية
- المصدر
- وزارة الدفاع الأمريكية — غرفة قراءة FOIA (أرشيف الإنترنت)
تظليل نتائج البحث عن: