ITEM
SUPPLIES/SERVICES
QTY
UNIT
UNIT PRICE
AMOUNT
0001
Provide all personnel, equipment and materials to manufacture the following uniform items in accordance with attached specifications with partial shipments being accepted. Quantities for specific sizes are attached.
Delivery Schedule
33% of order (containing an equal distribution of sizes) due NLT 30 days after contract award
66% of order (containing an equal distribution of sizes) due NLT 45 days after contract award
100% of order due NLT 60 days after contract award
Early delivery is acceptable.
It is not acceptable to wait to deliver entire order at the 60 day point.
0001AA
Desert Boot
(See attachment for size breakdown)
10,000
EA
0002AB
Desert Uniform Pants
(See attachment for size breakdown) 20,000 EA
0003AC
Desert Uniform Shirt
(See attachment for size breakdown) 20,000 EA
0004AD
Patrol Cap
(See attachment for size breakdown) 7,000 EA
0005AE
Uniform Belt
(See attachment for size breakdown) 7,000 EA
0006AF
Shipping
JB
DABV01-04-Q-0009 PAGE 3
الرئيسية / العقود والمناقصات / BUS-31c57803
العقود والمناقصات
33% of order (containing an equal distribution of sizes) due NLT 30 days after contract award
- التاريخ
- غير معروف
- الفئة
- العقود والمناقصات
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: