C.6 OPERATIONAL GUIDELINES
a. Procurement, Delivery, and Installation Requirements All equipment, supplies, medicines, and other relevant items for making health facilities operational must be f high-quality and consistent with international standards and MOH and local needs. Specific details will b iscussed with the Contractor once initial assessments have been completed and priorities identified by th MOH, DART, and USAID mission.
See Section FL6. for authorized geographic code information.
The Contractor will be responsible for providing communications equipment compatible with USG/ USAID frequencies, vehicles for staff equipped with GPS transmitters, and full support for in-country staff.
The HISS contractor shall work with the USAID-supported Logistics contractor to determine the most cost- effective mechanism to establish and maintain supply depots and deliver health commodities/ materials/ equipment. The Contractors will inform the CTO of the recommended mechanism, who will determine whether the HSS Contractor or the Logistics contractor shall purchase, store, and deliver the required health supplies. If the HSS Contractor is considered the most appropriate provider, the HISS contractor shall be responsible for purchase, delivery, and installation (or oversight of installation if applicable) of any needed medicines, equipment, and matenals purchased for delivering health services (e.g.
refrigerators, microscopes, computers, furniture, etc.) in the facilities specified by USAID. The Contractor will also be responsible for any needed follow-up maintenance, including spare parts, and training on use of equipment. If required, the Contractor will issue to sub-contractors/ sub-grantees the commodities/ materials/ equipment required to complete their projects and the value of these will be deducted from their approved budgets.
The Contractor is responsible for determining if certain health and safety precautions (e.g. immunizations, biological and chemical protection gear, malana prophylaxis) are necessary for key staff to be located in Iraq.
If so, the Contractor will also be responsible for procuring and delivering these items to key staft prior to their deployment to the region b. Reporting Requirements The Contractor will be responsible for providing all the reports specified in Section F of the contract.
c. Security
See the special security provision in Section H.16.
SECTIOND - PACKAGING AND MARKING
D.1 AIDAR 752.7009 MARKING (JAN 1993)
(a) It is USAID policy that USAID-financed commodities and shipping containers, and project construction sites and other project locations be suitably marked with the USAID emblem Shipping containers are also to be marked with the last five digits of the USAID financing document number. As a general rule, marking is not requred for raw matenals shipped in bulk (such as coal, grain, etc.), or for semi finished products which are not packaged.
-.=
11 of 41
(b) Specific guidance on marking requirements should be obtained prior to procurement of commodities to be shipped, and as early as possible for project construction sites and other project locations. This guidance will be provided through the cognizant technical office indicated on the cover page of this contract, or by the Mission Director in the Cooperating Country to which commodities are being shipped, or in which the project site is located.
(c) Authority to waive marking requirements is vested with the Regional Assistant Administrators, and with Mission Directors. -
(d) A copy of any specific marking instructions or waivers from marking requirements is to be sent to the Contracting Officer, the original should be retained by the Contractor.
D.2 REPORTS
Reports should be in accordance with AIDAR 752.242-70 and as indicated in Section F.
SECTIONE - INSPECTION AND ACCEPTANCE
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
DATE
TITLE
NUMBER
INSPECTION OF SUPPLIES--COST REIMBURSEMENT MAY 2001
52.246-3
INSPECTION OF SERVICES--COST REIMBURSEMENT APR 1984
52.246-5
E.2 INSPECTION AND AOCEPTANCE
USAID inspection and acceptance of services, reports and other required deliverables or outputs shall take place in Iraq, at the Contractor's facilities or project sites or at any other location where the services are pastored are reports ani el enables or ces are rode, po suamite it cio ested in secion e E.3 MONITORING AND EVALUATION PLAN Evaluation of the Contractor's overall performance in accordance with performance standards/ *indicators established under this contract shall be conducted jointly by the CTO and the Contracting Officer, and shall form the basis of the Contractor's permanent performance record with regard to this contract. The CIO and Contracting Officer will undertake an evaluation at the conclusion of the contract.
* Indicators are prouded in Attachment 5. Further details may be referenced in the contractor's technical proposal, Chapter One (Plan) dated 3/17/03. The indicators reall be coordinated rith the CIO.
12 of 41