(b) Specific guidance on marking requirements should be obtained prior to procurement of commodities to be shipped, and as early as possible for project construction sites and other project locations. This guidance will be provided through the cognizant technical office indicated on the cover page of this contract, or by the Mission Director in the Cooperating Country to which commodities are being shipped, or in which the project site is located.
(c) Authority to waive marking requirements is vested with the Regional Assistant Administrators, and with Mission Directors. -
(d) A copy of any specific marking instructions or waivers from marking requirements is to be sent to the Contracting Officer, the original should be retained by the Contractor.
D.2 REPORTS
Reports should be in accordance with AIDAR 752.242-70 and as indicated in Section F.
SECTIONE - INSPECTION AND ACCEPTANCE
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
DATE
TITLE
NUMBER
INSPECTION OF SUPPLIES--COST REIMBURSEMENT MAY 2001
52.246-3
INSPECTION OF SERVICES--COST REIMBURSEMENT APR 1984
52.246-5
E.2 INSPECTION AND AOCEPTANCE
USAID inspection and acceptance of services, reports and other required deliverables or outputs shall take place in Iraq, at the Contractor's facilities or project sites or at any other location where the services are pastored are reports ani el enables or ces are rode, po suamite it cio ested in secion e E.3 MONITORING AND EVALUATION PLAN Evaluation of the Contractor's overall performance in accordance with performance standards/ *indicators established under this contract shall be conducted jointly by the CTO and the Contracting Officer, and shall form the basis of the Contractor's permanent performance record with regard to this contract. The CIO and Contracting Officer will undertake an evaluation at the conclusion of the contract.
* Indicators are prouded in Attachment 5. Further details may be referenced in the contractor's technical proposal, Chapter One (Plan) dated 3/17/03. The indicators reall be coordinated rith the CIO.