REPORT DATE -29 NOVEMBER 2003
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas4200881624No. 2 FWP. No.1 loss of flame.
BaijiFuel Oil6410085850090360500No. 5 rehab. No. 4 stopped boiler leak.
DuraFuel Oil417500075180No. 4: Programmed Maintenance 10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation.
South BaghdadFuel Oil6335252000080200No. 6 programmed mnt 11 NOV to 26 DEC. No. 4 and 5 stopped boiler leak. No. 1 synch at 1830. No. 2 synch at 2030.
MussaibeCrude and Fuel Oil41000200200860No. 2 program mnt 20 OCT to 12 NOV start. No. 3 program mnt 5 NOV to 20 DEC. No. 1 tripped boiler leak.
NassiryaCrude431501500100400600No. 3 programmed mnt 11 NOV to 11 DEC.
NajebiaNatural Gas and Crude20000160No. 4 programmed mnt 6 NOV to 21 DEC. No. 5 tripped at 1011 DLL.
HarthaNatural Gas and Crude411500150300No. 4 Programmed Maintenance from 23 OCT to 23 DEC.
Total:1,2812,824
# A-Steam Power Stations REPORT DATE -29 NOVEMBER 2003 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 0 0 8 8 16 24 No. 2 FWP. No.1 loss of flame. Baiji Fuel Oil 6 4 100 85 85 0 0 90 360 500 No. 5 rehab. No. 4 stopped boiler leak. Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4: Programmed Maintenance 10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation. South Baghdad Fuel Oil 6 3 35 25 20 0 0 0 80 200 No. 6 programmed mnt 11 NOV to 26 DEC. No. 4 and 5 stopped boiler leak. No. 1 synch at 1830. No. 2 synch at 2030. Mussaibe Crude and Fuel Oil 4 1 0 0 0 200 200 860 No. 2 program mnt 20 OCT to 12 NOV start. No. 3 program mnt 5 NOV to 20 DEC. No. 1 tripped boiler leak. Nassirya Crude 4 3 150 150 0 100 400 600 No. 3 programmed mnt 11 NOV to 11 DEC. Najebia Natural Gas and Crude 2 0 0 0 0 160 No. 4 programmed mnt 6 NOV to 21 DEC. No. 5 tripped at 1011 DLL. Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 4 Programmed Maintenance from 23 OCT to 23 DEC. Total: 1281 2824 # B- Gas_C-Power Stations Report Date- 29 NOVEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 115 125 Gas Oil No. 1 s/b. Musil Dam Main 4 2 250 600 Quds 2 2 90 160 Gas Oil 44 trucks. Musil Dam reg 4 3 30 60 450 Mosil 12 7 120 150 14 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 18 No. 5 problem turbine rotor. No. 6: Programmed Maintenance. No. 4 rotor defect. Haditha Dam 6 2 105 160 300 Old Mulla 12 7 85 128 310 No. 1 gas control. No. 2 gen protec. No. 5 Programmed Mnt. No. 12 rehab. No. 6 gene. Prot. Samarra 3 3 53 55 550 New Mulla 6 2 70 173 2.3 No. 6 Generator Defective. No. 4 cooling fan. No. 3 prog. Mnt. No. 1 tripped at 1150 EF. Himrin 2 1 18 21 80 Taji 7 5 80 55 13 No. 5 Diesel. No.7 Rehabilitation. Hindia 4 4 5 5 60 M. Taji 2 0 0 20 0 NGPL Kufa 4 0 0 1 Dura 4 1 20 30 15 No.3 Rehabilitation. No. 1 control. No. 4 tripped at 0001 NGPL. Total 461 896 Hilla 4 4 65 64 25 System Generation 64002 MWh Najaf 3 3 110 129 20 Syrian Line Generation 0 MWh Khor 4 2 110 80 Natural Gas No. 4: Rehabilitation. No. 2 tripped over speed. Turkey Line Generation 2014 MWh Shuaiba 2 1 10 20 Natural Gas No. 1 programmed mnt. Total Generation 66016 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3123 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 0 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 84 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3284 MW Total 885 1233 Baghdad Load 1210 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads GOVERNORATE Peak Load MW MWH Average Load MW 29 NOVEMBER, 2003 Baghdad 1200 22870 952.9167 Power transferred from North to Middle 700 MW Duhok 84 1956 81.5 Naynawa 270 7466 311.0833 Power transferred from South to Middle 240 MW Tamim 130 3320 138.3333 Salah Aldeen 180 4309 179.5417 Anbar 170 3653 152.2083 Dyala 60 1518 63.25 Babil 75 2002 83.4167 Kirbala 70 1726 71.9167 Najaf 90 2219 92.4583 Kadsya 42 1334 55.5833 Wasit 56 1881 78.375 Muthana 45 1178 49.0833 Nasirya 120 2630 109.5833 Misan 60 2393 99.7083 Basra 225 5995 249.7917 2877