Power System Highlights for January 14, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
The Baiji-Mosul 400 Kv Transmission Line is currently under repair, estimated completion date 24 Jan.
Generation:
Daily System peak on 13 Jan – 3,523Mw.
Daily system Demand on 13 Jan – 5,638 Mw (Estimated) (3523 Actual Generation, + 1805 Load Shed, + 310 Corrected Frequency, = 5638)
Total generation – 71,077Mwh
Imported power - Power from Syria (57Mw) and Turkey (82Mw) included in System Peak
Generators Returned to Service 200 Mw Najebia 4 30 Mw Najebia 5 30 Mw Hartha 1 140 Mw
Generators Unscheduled Out of Service as of 13 JAN 04 833 Mw
Dibis 4, SP, Steam Leak
8 Mw
Baiji 5, SP, Forced Outage (No ECD) 100Mw Baiji 3, SP, Thrust bearing defect 100Mw Daura 4, Rotor repair 100Mw South Baghdad 2, Air heater defect 30Mw South Baghdad 4, Boiler leakage 25Mw Mussaibe 3, SP, Hydraulic test 150Mw Baiji 2, NG, Lubricating oil leak 60 Mw Mosil 1, NG, Rotor Defect 15 Mw Mosil 2, NG, Servo problem 15 Mw Mosil 9, NG, Rotor Defect 15 Mw Old Mulla 1,NG, Acc Gear 15 Mw Old Mulla 2, NG, Servo and Circuit breaker problem 15 Mw New Mulla 6, NG, Generator Defect 30 Mw Taji 3, NG, Compressor 15 Mw Taji 4, NG, Turbine problem 15 Mw Daura 2, generator differential 20Mw Hilla,1,2,3,4, NG, Gas leak, caused low gas pressure 80 Mw Taji Mobile, 2, NG, Software problem 10 Mw Shuaiba 2, NG, Stand By 5 Mw Petro 1, NG, shut down due to heavy rain 10Mw
* RED – Denotes out of service since last report
Generators Scheduled Out of Service as of 13 JAN 04 1009 Mw
2 Thermal units off-line for rehabilitation ------------------------------------------------ 200 Mw Daura 5 and 6 200 Mw – ECD May 2004
6 Thermal units in programmed maintenance ----------------------------------------- 531 Mw Dibis 1 8 Mw – ECD Jan 25 Dibis 3 8 Mw – ECD Feb15 Baiji 2 100 Mw – ECD Mar 04 Baiji 6 100 Mw – ECD Jan 19 South Baghdad 5 35 Mw – ECD Jan 15 Nassirya 4 130 Mw – ECD Jan 28 Hartha 4 150 Mw – ECD slipped to Jan 23
6 Gas Turbine units off-line for rehabilitation ---------------------------------------------123 Mw Dibis 4, 5, 18 Mw Old Mulla 12 15 Mw Taji 7 15 Mw Daura 3 20 Mw Khor Zubayr 4 55 Mw
5 Gas Turbine units in programmed maintenance---------------------------------------155 Mw Mosil 3 15 Mw Old Mulla 5,7 30 Mw New Mulla 4, 5 60 Mw (#5 ECD Mar 31) Najaf 2 50 Mw (ECD Apr 30)
Transmission:
Countrywide, Iraq’s electrical output continues to be constrained by damaged transmission and distribution lines. The lines have come down due to sabotage and bad weather. Downed transmission lines increase the probability for complete nationwide blackout by reducing system contingency and causing mechanical damage at power plants. This may cause further temporary blackouts, which have already directly resulted in 1) impacted refineries causing reduced fuel flow to power plants and a subsequent reduction in power supply, and 2) damages in the power plants due to undercurrent causing units to come off-line for unscheduled maintenance.
Transmission Lines out of service:
400KV
Nassiriya-Khor Zubayr – ECD May 1 Haditha-Baghdad West – ECD slipped from Jan 24 to Feb 29 Haditha-Qarna – Wasit – ECD slipped to Feb 29 Baghdad South – Qadisseya – ECD Jan 20 Baiji - Baghdad West #1 – ECD Feb 10 New line - Baghdad East-Baghdad South #2 – ECD Feb 4 Haditha – Qaim – no funding Baiji – Haditha – no funding/no contractor Diyala Connection – ECD April 30 Baiji – Mosul #1 – ECD Jan 24
132KV
Shuwaiba-Toba-Hamar– ECD Jan 30 Omara-Burzegan – Sabotaged. ECD March 2004 Nejibiya – Hartha Work Complete on one line, one remaining Bab- Al Zubair – ECD TBD Shuwaiba – Bab Al Zubayr 1+2, ECD TBD SST – Um Qsr ECD TBD
Lines Returned to service:
132 Kv
Mosul – Mosul East
Baghdad West – Jamia
Temim- Tuz
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
NG: NATURAL GAS
SP: STEAM POWER – These plants use either fuel oil or crude in burners HYDRO: WATER POWER
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-f8297a70
الخدمات الأساسية
Power System Highlights for January 14, 2004
- التاريخ
- 14 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: