DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 11, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Hartha-Qut Wassit 400 Kv Transmission line is energized and undergoing testing at this time.
We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output.
Generation:
Peak Power 4066Mw, 86,893Mw hours, 7-day Avg. 3926Mw
Generators Returned to Service: 8 Mw Dibis 1, SP 8 Mw
Generators Unscheduled Out of Service 673 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Dibis 4
SP
Vacuum
8
South Baghdad 3
SP
Generator Differential
30
South Baghdad 5
SP
Boiler Leak
30
South Baghdad 6
SP
Feed Water Pump
30
* Nassirya 3
SP
Vacuum
125
Hartha 4
SP
Boiler Leak
90
Baiji 1
CP
Lubricating oil leak
110
Khor Zubayr 4
CP
Generator Protector
50
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Mosil 11
CP
Hydraulic Pressure
15
Najaf 2
CP
Vibrations
50
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report Generators Scheduled Out of Service 1256 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
12 Mar
100
Baiji 3
SP
M
GRD/RIE
29 Feb 04
1 May
100
Doura 2
CP
M
ME
21 Feb 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
1 May
18
Hilla 3
CP
M
ME
9 Mar 04
TBD
20
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
12 Mar
200
Nassirya 2
SP
M
ME
9 Mar 04
TBD
150
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 8
CP
M
GRD/RIE
28 Feb 04
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
20 Apr
183 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
12 Mar
297 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
31 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
11 Mar
81 towers complete/81req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 May
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date -11 MARCH 2004 Power transferred from North to Middle 835 MW.
Power transferred from South to Middle 185 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1380
29250
1219
Duhok
85
1948
81
Naynawa
319
9501
396
Tamim
255
5177
216
Salah Aldeen
201
5110
213
Anbar
210
4405
184
Dyala
90
2411
100
Babil
95
2394
100
Kirbala
80
1991
83
Najaf
97
2469
103
Kadsya
60
1447
60
Wasit
95
2176
91
Muthana
60
1370
57
Nasirya
125
2683
112
Misan
60
1430
60
Basra
300
6190
258
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 2 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-f27d4e8a
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 11, 2004
- التاريخ
- 11 آذار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: