الرئيسية / الخدمات الأساسية / ESS-f1e8436c

الخدمات الأساسية

DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 4, 2004

التاريخ
4 نيسان 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 4, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Baiji-Baghdad West #1, 400 Kv Transmission Line, operational now. We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output. Generation: Peak Power 3666Mw, 80,213Mw hours, 7-day Avg. 3821Mw Generators Returned to Service: 218 Mw Khor Zubayr 4 (2 Apr) 50 Mw South Baghdad 4 30 Mw Dibis 2, SP 8 Mw Doura 2, CP 20 Mw Baiji 2, SP 80 Mw Old Mulla 2 15 Mw Taji 5 15 Mw New Mulla 3 30 Mw Generators Unscheduled Out of Service (15) 550 Mw PLANT Type SP, CP, RP, HP Fault Mw * Mussaibe 1 SP Boiler Leak 200 Mosil 1 CP Rotor Defect 15 * Mosil 2 CP Hydraulic Pressure Low 15 Mosil 3 CP Servo 15 Mosil 9 CP Rotor Defect 15 * Khor Zubayr 1 CP Flame loss 40 Dibis 6 CP Vibrations 30 * Qudus 2 CP Fuel Pressure Low 100 Old Mulla 1 CP Acc Gear 15 Old Mulla 6 CP High exhaust temperature 15 Old Mulla 8 CP Vibrations 15 Old Mulla 9,10 CP Transformer damage 30 Taji 2 CP Turbine temperature 15 Taji 3, CP Compressor 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (27) 1883 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M TBD 21 Mar 04 21 May 100 Baiji 3 SP M Bechtel 29 Feb 04 1 May 100 Dibis 4 SP M ME 15 Mar 04 30 Apr 8 Doura 3 CP R GRD/RIE 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 30 May 100 Doura 6 SP R Bechtel Jul 03 30 Jun 100 Dibis 4 CP R GRD/RIE Sep 03 12 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 15 Jun 50 Mosil 11 CP M ME 2 Apr 04 TBD 15 Mussaibe 2 SP M ME 28 Feb 04 28 Apr 200 Mussaibe 4 SP M ME 7 Feb 04 4 Apr 200 Nassirya 1 SP M ME 30 Mar 04 15 May 130 Nassirya 2 SP M ME 9 Mar 04 15 Apr 150 Nassirya 3 SP M ME 31 Mar 04 21 Apr 130 Nassirya 4 SP M ME 31 Mar 04 21 Apr 130 New Mulla 6 CP R GRD/RIE 28 Mar 04 15 May 30 Old Mulla 5 CP M ME 2 Apr 04 TBD 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 Shuaiba 1 CP M ME 14 Feb 04 31 May 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 3 SP R ME 18 Mar 04 18 May 20 Taji 7 CP R GRD/RIE 1 Oct 03 15 May 15 Taji 6 CP M ME 2 Apr 04 TBD 15 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE 15 Apr 246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE Complete MoE completing PLC work Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete In service 31 March Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE TBD No contract awarded Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 30 May Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE 15 May Contractor mobilized Dibis to Old Kirkuk 132 Reconductor GRD-RIE 15 Jun Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Jazair to Yarmook 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Baghd West – Jamia 132 Sabotage ME TBD Al Amarah-Burzulgan 132 Looting GRD-RIE 15 Jun 26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: Power transferred from North to Middle 1020 MW. Power transferred from South to Middle -120 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1190 Duhok 80 Naynawa 300 Tamim 120 Salah Aldeen 210 Anbar 200 Dyala 85 Babil 90 Kirbala 120 Najaf 140 Kadsya 65 Wasit 90 Muthana 65 Nasirya 120 Misan 65 Basra 275 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3