REPORT DATE - 22 January 2004
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas417724#2 boiler leakage; #3 prog maint; #4 stopped at 2102 boiler leakage
BaijiFuel Oil619090500#2 prog. maint; #3 low air flow; #4 stopped 724 FDF; #5 forced outage; #6 prog maint
DauraFuel Oil417575180#4 rotor repair; #(5+6) Rehab
South BaghdadFuel Oil62353065200#2 air heater defect; #3 synch at 1110; #4 stopped at 1440 boiler leakage; #5 prog maint; #6 stopped at 1845 boiler leakage
MussaibeCrude and Fuel Oil44210200150210770860
NassiryaCrude43130140150420600#4 prog maint. 28 DEC to 28 JAN.
NajebiaNatural Gas and Crude227585160160
HarthaNatural Gas and Crude41140140300#4 prog maint
Out of Service for Unscheduled MaintanenceTotal:1,7272,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations REPORT DATE - 22 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 7 7 24 #2 boiler leakage; #3 prog maint; #4 stopped at 2102 boiler leakage Baiji Fuel Oil 6 1 90 90 500 #2 prog. maint; #3 low air flow; #4 stopped 724 FDF; #5 forced outage; #6 prog maint Daura Fuel Oil 4 1 75 75 180 #4 rotor repair; #(5+6) Rehab South Baghdad Fuel Oil 6 2 35 30 65 200 #2 air heater defect; #3 synch at 1110; #4 stopped at 1440 boiler leakage; #5 prog maint; #6 stopped at 1845 boiler leakage Mussaibe Crude and Fuel Oil 4 4 210 200 150 210 770 860 Nassirya Crude 4 3 130 140 150 420 600 #4 prog maint. 28 DEC to 28 JAN. Najebia Natural Gas and Crude 2 2 75 85 160 160 Hartha Natural Gas and Crude 4 1 140 140 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1727 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Report Date- 22 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil #2 lubricating oil leak from bearing Musil Dam Main 4 3 390 600 Quds 2 2 85 160 Gas Oil 35 trucks Musil Dam reg 4 3 30 60 450 Mosil 12 9 140 150 26 #1 rotor defect; #2 servo + ACC; #3 synch at 1115; #6 synch at 1400; #9 rotor defect; Musil Pumping 2 0 Dibis 3 1 30 30 33 #4 and #5 rehab Haditha Dam 6 2 140 160 250 Old Mulla 12 7 100 128 32 #1 ACC gear, #2 servo, #5 prog maint, #10 prog maint; #12 rehab Samarra 3 2 32 55 320 New Mulla 6 4 130 173 34 #4 prog maint; #5 synch at 1350; #6 Generator defect Himrin 2 1 22 21 90 Taji 7 4 67 55 17 #3 Compressor; #4 stopped at 1435 flame def; #5 sunch at 1731; #7 Rehab. Hindia 4 4 5 5 65 M. Taji 2 1 8 18 19 #2 software. Kufa 4 0 0 0 Daura 4 3 75 30 18 #3 Rehab Total 619 896 Hilla 4 3 50 64 22 #1 engine bearing System Generation 79066 MWh Najaf 3 2 98 129 21 #2 prog maint Syrian Line Generation 1457 MWh Khor 4 2 70 80 Natural Gas #2 synch at 2232; #3 prog maint; #4 Rehab Turkey Line Generation 1928 MWh Shuaiba 2 1 5 20 Natural Gas #2 gas turbine check Total Generation 82451 MWh M. Shuaiba 2 Natural Gas System Peak Load 3623 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 10 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 2 16 0 Gas Oil Fixed Gen Peak Load 127 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 3890 MW Diesel 26 Gas Oil Baghdad Load 1440 MW Total 1048 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Report Date - 22 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 510 MW. Power transferred from South to Middle 175 MW. Baghdad 1440 30880 1287 Duhok 80 1874 78 Naynawa 300 7236 302 Tamim 128 3314 138 Salah Aldeen 190 4536 189 Anbar 190 3838 160 Dyala 85 1800 75 Babil 95 2054 86 Kirbala 90 1993 83 Najaf 100 2024 84 Kadsya 60 1341 56 Wasit 85 2437 102 Muthana 40 1224 51 Nasirya 115 2717 113 Misan 55 1317 55 Basra 300 6784 283