الرئيسية / الخدمات الأساسية / ESS-ecdcc7cd

الخدمات الأساسية

DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 14, 2004

التاريخ
14 أيار 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 14, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: The Khor Zubayr-Nassirya 400 Kv Transmission line completed its second and final crossing of MSR Tampa. The stringing of the line across the road was a complete success due to the outstanding coordination between the American and Romanian soldiers and Bechtel/NOK Corporations. There was minimal interruption of traffic and no incidents during the operation. Generation: Peak Power 3998Mw, 84,538Mw hours, 7-day Avg. 3887Mw Generators Returned to Service: (0) Generators Unscheduled Out of Service (14) 400 Mw PLANT Type SP, CP, RP, HP Fault Mw Baiji 3 SP Recirculation Fan bearing 105 Najebia 5 SP Thrust bearing problem 80 South Baghdad 5 SP Air Heater 30 Baiji Mobile, 4 CP Fuel Filters 25 Doura 1,2 CP No gas pressure 40 Mosil 2 CP Reverse Power 15 Mosil 9 CP Reverse Power 15 Old Mulla 7 CP High exhaust temp 15 Taji 1,2,5 CP No gas pressure 45 M. Taji 1 CP Planned Outage 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (30) 1351 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M Bechtel 21 Mar 04 21 May 100 Dibis 3 SP M ME 26 Apr 04 TBD 8 Dibis 4 SP M ME 15 Mar 04 TBD 8 Baiji 2 CP M ME 11 May 04 18 May 80 Doura 4 CP M ME 14 Apr 04 31 May 20 Doura 3 CP R ME 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 TBD 65 Doura 5 SP R Bechtel Jul 03 20 Jun 100 Doura 6 SP R Bechtel Jul 03 20 Jul 100 Dibis 4 CP R GRD/RIE Sep 03 23 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 3 Jul 50 Mosil 1 CP R GRD/RIE 24 Apr 04 11 Jun 15 Mosil 7 CP M ME 24 Apr 04 18 May 15 Mosil 8 CP R GRD/RIE 6 Feb 04 11Jun 15 Mussaibe 2 SP M (Additional work) ME 28 Feb 04 20 May 200 Nassirya 1 SP M ME 30 Mar 04 21 May 130 New Mulla 6 CP R GRD/RIE 28 Mar 04 23 May 30 Old Mulla 1 CP M GRD/RIE 17 Apr 04 15 Jun 15 Old Mulla 2 CP M GRD/RIE 17 Apr 04 6 Jun 15 Old Mulla 5 CP M GRD/RIE 17 Apr 04 6 Jun 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 12 Jun 15 South Baghdad 1 SP M (Awaiting parts) ME 12 Feb 04 21 May 30 South Baghdad 2 SP M (Awaiting Parts) ME 12 Feb 04 20 May 30 South Baghdad 3 SP R ME 18 Mar 04 6 Jun 20 Taji 3 CP R GRD/RIE 6 Feb 04 23 Jul 15 Taji 4 CP M GRD/RIE 21 Apr 04 8 Jun 15 Taji 7 CP R GRD/RIE 1 Oct 03 24 JUL 15 Taji 6 CP M ME 2 Apr 04 26 May 15 New In-service date LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 159 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE Complete 246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE Complete 23 Apr Operational Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete Operational Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE 28 Feb 05 Start date 21 May 04 Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 15 Jun Foundations under construction Dibis/Erbil-Qara Quosh 132 New Line GRD/RIE 1 Jun Construction ongoing Dibis to Old Kirkuk 132 Reconductor GRD-RIE 31 Jul Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 5 Jul Assessment underway Jazair to Yarmook 132 Reconductor GRD-RIE TBD Assessment underway Baghd West – Jamia 132 Sabotage ME TBD Burzulgan-Old Amarah 132 Looting GRD-RIE 25 Jun Assessment underway Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: No report today Power transferred from North to Middle MW. Power transferred from South to Middle MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad Duhok Naynawa Tamim Salah Aldeen Anbar Dyala Babil Kirbala Najaf Kadsya Wasit Muthana Nasirya Misan Basra Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3