# A-Steam Power Stations
REPORT DATE - 5 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 8 0 8 16 24 No.1 prog mt.10 DEC to 25 JAN. No 3 FDF. No. 2 stopped 1523 gas valve.
Baiji Fuel Oil 6 2 95 0 0 100 0 0 195 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 2 stopped 1407 leak at HCL. No. 3 boiler leak.
Daura Fuel Oil 4 1 80 0 0 0 80 180 Nos. 5 & 6: Rehab. No. 4 stopped 0405 noise in bearing.
South Baghdad Fuel Oil 6 3 35 25 20 0 0 0 80 200 No. 4 hydro Test No. 5 mnt 1 DEC to 15 JAN. No. 6 thrust bearing Mussaibe Crude and Fuel Oil 4 2 215 0 0 220 435 860 No. 3 boiler leak No. 2 sealing.
Nassirya Crude 4 3 120 140 135 0 395 600 No. 4 programmed mnt 28 DEC to 28 JAN.
Najebia Natural Gas and Crude 2 2 90 0 90 160 Hartha Natural Gas and Crude 4 1 140 0 140 300 No. 4 prog mnt.
Total: 1431 2824
# B- Gas_C-Power Stations
Report Date- 5 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 120 125 Gas Oil No. 2 lubricating oil leak Musil Dam Main 4 3 400 600 Quds 2 1 112 160 Gas Oil 39 truck #2 C/B problem Musil Dam reg 4 3 32 60 450 Mosil 12 8 120 150 30 No. 1 Rotor Defect. No. 2 servo ACC. No. 3 Prog Maint. No. 9 rotor defect. 12 tripped 1602, servo Musil Pumping 2 0 0 0 Dibis 3 1 31 30 30 No. 4 and 5 rehab.. Haditha Dam 6 2 140 160 300 Old Mulla 12 6 63 128 450 No. 1 ACC gear. No. 2 servo. No. 5 Progm Mnt. No. 6 acc gear. No. 7 progm mnt. No. 12 rehab. Samarra 3 3 43 55 400 New Mulla 6 4 130 173 3.2 No. 5 programmed mnt. No. 6 Generator Defective. Himrin 2 1 22 21 90 Taji 7 4 68 55 19 No. 3 Compressor. No. 4 Turbine. No. 7 Rehab. Hindia 4 4 5 5 M. Taji 2 1 8 20 Natural Gas No. 2 software. Kufa 4 0 0 0 Daura 4 3 70 30 16 No.3 Rehabilitation. Total 642 896 Hilla 4 4 67 64 26 System Generation 69917 MWh Najaf 3 2 100 129 24 No. 2 program mnt. Syrian Line Generation 1421 MWh Khor 4 3 120 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 1889 MWh Shuaiba 2 1 4 20 Natural Gas No. 1 Stand by Total Generation 73248 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3194 MW M. Dibis 4 4 12 24 Natural Gas Syria Peak Load 60 MW Mossil East 5 1 5 15 Gas Oil Turkey Peak Load 80 MW Hmam/Zafranya 7 2 14 Gas Oil Fixed Gen Peak Load 77 MW Diesel 0 Gas Oil Total Peak Load 3411 MW Total 1054 1203 Baghdad Load 1310 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 5 January, 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 500 MW.
Power transferred from South to Middle 170 MW.
Baghdad 1310 26473 1103
Duhok 80 1855 77
Naynawa 314 6999 282
Tamim 114 3100 129.1667
Salah Aldeen 177 4173 173.875 Anbar 160 3878 161.5833 Dyala 80 1568 65.3333 Babil 73 1742 72.5833 Kirbala 60 1399 58.2917 Najaf 87 2333 97.2083 Kadsya 40 1061 44.2083 Wasit 63 1773 73.875 Muthana 42 1020 42.5 Nasirya 125 1749 72.875 Misan 55 1292 53.8333 Basra 260 5748 239.5
الرئيسية / الخدمات الأساسية / ESS-e8bf6474
الخدمات الأساسية
System Status Jan 05
- التاريخ
- 5 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 13 صفاً × 13 عموداً
| REPORT DATE - 5 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 8 | 0 | 8 | 16 | 24 | No.1 prog mt.10 DEC to 25 JAN. No 3 FDF. No. 2 stopped 1523 gas valve. | |||
| Baiji | Fuel Oil | 6 | 2 | 95 | 0 | 0 | 100 | 0 | 0 | 195 | 500 | No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 2 stopped 1407 leak at HCL. No. 3 boiler leak. |
| Daura | Fuel Oil | 4 | 1 | 80 | 0 | 0 | 0 | 80 | 180 | Nos. 5 & 6: Rehab. No. 4 stopped 0405 noise in bearing. | ||
| South Baghdad | Fuel Oil | 6 | 3 | 35 | 25 | 20 | 0 | 0 | 0 | 80 | 200 | No. 4 hydro Test No. 5 mnt 1 DEC to 15 JAN. No. 6 thrust bearing |
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 215 | 0 | 0 | 220 | 435 | 860 | No. 3 boiler leak No. 2 sealing. | ||
| Nassirya | Crude | 4 | 3 | 120 | 140 | 135 | 0 | 395 | 600 | No. 4 programmed mnt 28 DEC to 28 JAN. | ||
| Najebia | Natural Gas and Crude | 2 | 2 | 90 | 0 | 90 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 0 | 140 | 300 | No. 4 prog mnt. | ||||
| Total: | 1,431 | 2,824 |
الورقة «B- Gas_C-Power Stations»: 25 صفاً × 13 عموداً
| Report Date- 5 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 120 | 125 | Gas Oil | No. 2 lubricating oil leak | Musil Dam Main | 4 | 3 | 400 | 600 | |
| Quds | 2 | 1 | 112 | 160 | Gas Oil | 39 truck #2 C/B problem | Musil Dam reg | 4 | 3 | 32 | 60 | 450 |
| Mosil | 12 | 8 | 120 | 150 | 30 | No. 1 Rotor Defect. No. 2 servo ACC. No. 3 Prog Maint. No. 9 rotor defect. 12 tripped 1602, servo | Musil Pumping | 2 | 0 | 0 | 0 | |
| Dibis | 3 | 1 | 31 | 30 | 30 | No. 4 and 5 rehab.. | Haditha Dam | 6 | 2 | 140 | 160 | 300 |
| Old Mulla | 12 | 6 | 63 | 128 | 450 | No. 1 ACC gear. No. 2 servo. No. 5 Progm Mnt. No. 6 acc gear. No. 7 progm mnt. No. 12 rehab. | Samarra | 3 | 3 | 43 | 55 | 400 |
| New Mulla | 6 | 4 | 130 | 173 | 3.20 | No. 5 programmed mnt. No. 6 Generator Defective. | Himrin | 2 | 1 | 22 | 21 | 90 |
| Taji | 7 | 4 | 68 | 55 | 19 | No. 3 Compressor. No. 4 Turbine. No. 7 Rehab. | Hindia | 4 | 4 | 5 | 5 | |
| M. Taji | 2 | 1 | 8 | 20 | Natural Gas | No. 2 software. | Kufa | 4 | 0 | 0 | 0 | |
| Daura | 4 | 3 | 70 | 30 | 16 | No.3 Rehabilitation. | Total | 642 | 896 | |||
| Hilla | 4 | 4 | 67 | 64 | 26 | System Generation | 69,917 | MWh | ||||
| Najaf | 3 | 2 | 100 | 129 | 24 | No. 2 program mnt. | Syrian Line Generation | 1,421 | MWh | |||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | No. 4: Rehabilitation. | Turkey Line Generation | 1,889 | MWh | |||
| Shuaiba | 2 | 1 | 4 | 20 | Natural Gas | No. 1 Stand by | Total Generation | 73,248 | MWh | |||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | System Peak Load | 3,194 | MW | ||||
| M. Dibis | 4 | 4 | 12 | 24 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| Mossil East | 5 | 1 | 5 | 15 | Gas Oil | Turkey Peak Load | 80 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 14 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Diesel | 0 | Gas Oil | Total Peak Load | 3,411 | MW | |||||||
| Total | 1,054 | 1,203 | Baghdad Load | 1,310 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 21 صفاً × 4 أعمدة
| Report Date - 5 January, 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 500 MW. | |||
| Power transferred from South to Middle 170 MW. | |||
| Baghdad | 1,310 | 26,473 | 1,103 |
| Duhok | 80 | 1,855 | 77 |
| Naynawa | 314 | 6,999 | 282 |
| Tamim | 114 | 3,100 | 129.17 |
| Salah Aldeen | 177 | 4,173 | 173.88 |
| Anbar | 160 | 3,878 | 161.58 |
| Dyala | 80 | 1,568 | 65.33 |
| Babil | 73 | 1,742 | 72.58 |
| Kirbala | 60 | 1,399 | 58.29 |
| Najaf | 87 | 2,333 | 97.21 |
| Kadsya | 40 | 1,061 | 44.21 |
| Wasit | 63 | 1,773 | 73.88 |
| Muthana | 42 | 1,020 | 42.50 |
| Nasirya | 125 | 1,749 | 72.88 |
| Misan | 55 | 1,292 | 53.83 |
| Basra | 260 | 5,748 | 239.50 |