# A-Steam Power Stations
REPORT DATE - 12 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 8 8 24 #1 prog maint; #3 prog maint; #4 stopped at 15 Baiji Fuel Oil 6 2 95 100 195 500 #2 prog. maint; #3 drum level low; #5 forced outage; #6 prog maint Daura Fuel Oil 4 1 75 75 180 #4 rotor repair; #(5+6) Rehab South Baghdad Fuel Oil 6 4 30 20 25 30 105 200 #2 A/H; #4 synch at 1915; #5 prog maint Mussaibe Crude and Fuel Oil 4 2 220 220 440 860 #2 inspec + treament of sealing by Russian expert; #3 boiler leakage Nassirya Crude 4 3 140 145 145 430 600 #3 prog maint Najebia Natural Gas and Crude 2 2 35 90 125 160 #4 one boiler in operation Hartha Natural Gas and Crude 4 1 140 140 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1518 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date- 12 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 130 125 Gas Oil #2 lubricating oil leak from bearing Musil Dam Main 4 3 390 600 Quds 2 2 220 160 Gas Oil 37 trucks Musil Dam reg 4 3 35 60 450 Mosil 12 8 125 150 22 #1 rotor defect; #2 servo + ACC; #3 prog maint; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 30 30 29 #4 and #5 rehab Haditha Dam 6 2 140 160 300 Old Mulla 12 7 95 128 440 #1 ACC gear; #2 servo; #5 prog maint; #7 prog maint; #12 rehab Samarra 3 2 33 55 330 New Mulla 6 3 95 173 300 #4 & #5 prog maint; #6 Generator defect Himrin 2 1 22 21 90 Taji 7 4 60 55 17 #3 Compressor; #4 turbine; #7 Rehab Hindia 4 4 5 5 M. Taji 2 1 7 18 #2 software. Kufa 4 0 0 0 Daura 4 3 70 30 17 #3 Rehab Total 735 896 Hilla 4 2 25 64 12 gaspipe leakage System Generation 73830 MWh Najaf 3 1 22 129 11 #2 prog maint Syrian Line Generation 1403 MWh Khor 4 3 120 80 Natural Gas #4 Rehab Turkey Line Generation 1972 MWh Shuaiba 2 1 7 20 Natural Gas #2 S/B Total Generation 77205 MWh M. Shuaiba 2 Natural Gas System Peak Load 3330 MW Petro 4 1 10 0 Natural Gas Syria Peak Load MW M. Dibis 4 3 15 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 2 15 0 Gas Oil Fixed Gen Peak Load 77 MW Hmam/Zafranya 7 Gas Oil Total Peak Load 3487 MW Diesel 10 Gas Oil Baghdad Load 1250 MW Total 1056 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 12 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle = 470 MW Power transferred from South to Middle = 155 MW Baghdad 1380 30965 1290 Duhok 80 1914 80 Naynawa 330 6677 278 Tamim 134 3322 138 Salah Aldeen 200 4220 176 Anbar 150 4028 168 Dyala 70 1684 70 Babil 70 1887 79 Kirbala 90 1774 74 Najaf 100 2231 93 Kadsya 65 1396 58 Wasit 85 1826 76 Muthana 59 1275 53 Nasirya 135 2994 125 Misan 55 1361 57 Basra 310 7364 307
الرئيسية / الخدمات الأساسية / ESS-e3fc48ad
الخدمات الأساسية
System Status Jan 12
- التاريخ
- 12 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| REPORT DATE - 12 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #1 prog maint; #3 prog maint; #4 stopped at 15 | |||||
| Baiji | Fuel Oil | 6 | 2 | 95 | 100 | 195 | 500 | #2 prog. maint; #3 drum level low; #5 forced outage; #6 prog maint | ||||
| Daura | Fuel Oil | 4 | 1 | 75 | 75 | 180 | #4 rotor repair; #(5+6) Rehab | |||||
| South Baghdad | Fuel Oil | 6 | 4 | 30 | 20 | 25 | 30 | 105 | 200 | #2 A/H; #4 synch at 1915; #5 prog maint | ||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 220 | 220 | 440 | 860 | #2 inspec + treament of sealing by Russian expert; #3 boiler leakage | ||||
| Nassirya | Crude | 4 | 3 | 140 | 145 | 145 | 430 | 600 | #3 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 35 | 90 | 125 | 160 | #4 one boiler in operation | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 140 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,518 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date- 12 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 130 | 125 | Gas Oil | #2 lubricating oil leak from bearing | Musil Dam Main | 4 | 3 | 390 | 600 | |
| Quds | 2 | 2 | 220 | 160 | Gas Oil | 37 trucks | Musil Dam reg | 4 | 3 | 35 | 60 | 450 |
| Mosil | 12 | 8 | 125 | 150 | 22 | #1 rotor defect; #2 servo + ACC; #3 prog maint; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 30 | 30 | 29 | #4 and #5 rehab | Haditha Dam | 6 | 2 | 140 | 160 | 300 |
| Old Mulla | 12 | 7 | 95 | 128 | 440 | #1 ACC gear; #2 servo; #5 prog maint; #7 prog maint; #12 rehab | Samarra | 3 | 2 | 33 | 55 | 330 |
| New Mulla | 6 | 3 | 95 | 173 | 300 | #4 & #5 prog maint; #6 Generator defect | Himrin | 2 | 1 | 22 | 21 | 90 |
| Taji | 7 | 4 | 60 | 55 | 17 | #3 Compressor; #4 turbine; #7 Rehab | Hindia | 4 | 4 | 5 | 5 | |
| M. Taji | 2 | 1 | 7 | 18 | #2 software. | Kufa | 4 | 0 | 0 | 0 | ||
| Daura | 4 | 3 | 70 | 30 | 17 | #3 Rehab | Total | 735 | 896 | |||
| Hilla | 4 | 2 | 25 | 64 | 12 | gaspipe leakage | System Generation | 73,830 | MWh | |||
| Najaf | 3 | 1 | 22 | 129 | 11 | #2 prog maint | Syrian Line Generation | 1,403 | MWh | |||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | #4 Rehab | Turkey Line Generation | 1,972 | MWh | |||
| Shuaiba | 2 | 1 | 7 | 20 | Natural Gas | #2 S/B | Total Generation | 77,205 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,330 | MW | |||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | MW | |||||
| M. Dibis | 4 | 3 | 15 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 2 | 15 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | ||||
| Hmam/Zafranya | 7 | Gas Oil | Total Peak Load | 3,487 | MW | |||||||
| Diesel | 10 | Gas Oil | Baghdad Load | 1,250 | MW | |||||||
| Total | 1,056 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 12 January 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle = 470 MW | |||
| Power transferred from South to Middle = 155 MW | |||
| Baghdad | 1,380 | 30,965 | 1,290 |
| Duhok | 80 | 1,914 | 80 |
| Naynawa | 330 | 6,677 | 278 |
| Tamim | 134 | 3,322 | 138 |
| Salah Aldeen | 200 | 4,220 | 176 |
| Anbar | 150 | 4,028 | 168 |
| Dyala | 70 | 1,684 | 70 |
| Babil | 70 | 1,887 | 79 |
| Kirbala | 90 | 1,774 | 74 |
| Najaf | 100 | 2,231 | 93 |
| Kadsya | 65 | 1,396 | 58 |
| Wasit | 85 | 1,826 | 76 |
| Muthana | 59 | 1,275 | 53 |
| Nasirya | 135 | 2,994 | 125 |
| Misan | 55 | 1,361 | 57 |
| Basra | 310 | 7,364 | 307 |