DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 30, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output.
Generation:
Peak Power 3897Mw, 83,580Mw hours, 7-day Avg. 4006Mw
Generators Returned to Service: None reported today
Generators Unscheduled Out of Service (22) 780 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Baiji 2
SP
Hydrogen leak
120
Baiji 4
SP
Air Heater
80
* Baiji 1
CP
Tripped service transformer 90 Baiji 2 CP Testing 110
* South Baghdad 5
SP
Boiler Leak
30
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Mosil 11
CP
High exhaust temperature
15
Dibis 6
CP
Converting to Diesel
30
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
Old Mulla 5
CP
Inlet Valve
15
Old Mulla 6
CP
High exhaust temperature
15
Old Mulla 8
CP
Vibrations
15
Old Mulla 9,10
CP
Transformer damage
30
* New Mulla 3
CP
Hydraulic Pressure
30
* New Mulla 1
CP
High Exhaust temperature
30
Taji 3,
CP
Compressor
15
Taji 1
CP
Vibrations
15
Taji 4
CP
Lubrication oil leak
15
M. Taji 2
CP
Software
15
Khor Zubayr 4
CP
Cooling System problem
50
RED – Denotes out of service since last report
Generators Scheduled Out of Service (23) 1483 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
21 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 2
CP
M
ME
21 Feb 04
15 May
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 May
100
Doura 6
SP
R
Bechtel
Jul 03
30 Jun
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
15 Jun
50
Mosil 2
CP
M
GRD/RIE
21 Mar 04
15 May
15
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
4 Apr
200
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
297 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
31 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 May
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
15 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
15 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service: None reported today
Distribution:
Power transferred from North to Middle 750 MW.
Power transferred from South to Middle 150 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1200
27124
1130
1405
Duhok
80
1900
79
104
Naynawa
320
8169
340
483
Tamim
125
3327
139
189
Salah Aldeen
225
5176
216
259
Anbar
210
4591
191
233
Dyala
100
2403
100
141
Babil
118
2592
108
141
Kirbala
115
2194
91
109
Najaf
120
2489
104
127
Kadsya
65
1565
65
89
Wasit
95
2056
86
124
Muthana
65
1387
58
74
Nasirya
120
2737
114
126
Misan
75
1456
61
77
Basra
300
6045
252
252
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-dda2f6fb
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 30, 2004
- التاريخ
- 30 آذار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: