Reporting Peak for 10 APRIL 2004 / Report Date - 11 APRIL 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas42881624
BaijiFuel Oil629080170500
DauraFuel Oil40180
South BaghdadFuel Oil6330303090200
MussaibeCrude and Fuel Oil42218220438860
NassiryaCrude40600
NajebiaNatural Gas and Crude229090180160
HarthaNatural Gas and Crude41170170300
Out of Service for Unscheduled MaintanenceTotal:1,0642,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 10 APRIL 2004 / Report Date - 11 APRIL 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 Baiji Fuel Oil 6 2 90 80 170 500 Daura Fuel Oil 4 0 180 South Baghdad Fuel Oil 6 3 30 30 30 90 200 Mussaibe Crude and Fuel Oil 4 2 218 220 438 860 Nassirya Crude 4 0 600 Najebia Natural Gas and Crude 2 2 90 90 180 160 Hartha Natural Gas and Crude 4 1 170 170 300 Out of Service for Unscheduled Maintanence Total: 1064 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 10 APRIL 2004 / Report Date - 11 APRIL 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 85 125 Gas Oil Musil Dam Main 4 4 610 600 M. Baiji 8 Gas Oil Musil Dam reg 4 4 48 60 Quds 2 2 190 160 Gas Oil Musil Pumping 2 1 110 0 Mosil 12 9 135 150 Haditha Dam 6 160 Dibis 3 2 50 30 Samarra 3 3 54 55 Old Mulla 12 6 85 128 Himrin 2 2 36 21 New Mulla 6 5 145 173 Hindia 4 4 6 5 Taji 7 4 56 55 Kufa 4 2 1 0 M. Taji 2 18 Total 865 896 Daura 4 2 36 30 System Generation MWh Hilla 4 5 80 64 Syrian Line Generation MWh Najaf 3 3 128 129 Turkey Line Generation MWh Khor 4 2 80 80 Natural Gas Total Generation 78400 MWh Shuaiba 2 1 15 20 Natural Gas System Peak Load 3294 MW M. Shuaiba 2 Natural Gas Syria Peak Load 60 MW Petro 4 1 10 0 Natural Gas Turkey Peak Load 80 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 3 17 0 Gas Oil Total Peak Load 3700 MW Hmam/Zafranya 7 1 47 Gas Oil Baghdad Load 1110 MW Diesel Gas Oil Total 1168 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 10 APRIL 2004 / Report Date - 11 APRIL 2004 GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1140 Duhok 80 Naynawa 340 Tamim 145 Salah Aldeen 210 Anbar 185 Dyala 80 Babil 100 Kirbala 115 Najaf 135 Kadsya 58 Wasit 75 Muthana 50 Nasirya 80 Misan 55 Basra 320