DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 9, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output.
Generation:
Peak Power 4003Mw, 84,684Mw hours, 7-day Avg. 3904Mw
Generators Returned to Service: 93 Mw Dibis 2 8 Mw Qudas 2 50 Mw Hilla 1 20 Mw Dibis 6, CP 15 Mw Generators Unscheduled Out of Service 578 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 1
SP
Boiler Leak
8
* South Baghdad 3
SP
Generator Differential
30
Najebia 4
SP
Valve Leak
90
Hartha 4
SP
Boiler Leak
90
Baiji 1
CP
Lubricating oil leak
110
Khor Zubayr 4
CP
Generator Protector
50
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Mosil 11
CP
Hydraulic Pressure
15
Najaf 2
CP
Vibrations
50
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 1291 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
9 Mar
100
Baiji 3
SP
M
GRD/RIE
29 Feb 04
1 May
100
Doura 2
CP
M
ME
21 Feb 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
1 May
18
Hilla 2
CP
M
ME
9 Mar 04
TBD
20
Hilla 3
CP
M
ME
9 Mar 04
TBD
20
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
200
Nassirya 2
SP
M
ME
9 Mar 04
TBD
150
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
15 May
15
Old Mulla 8
CP
M
GRD/RIE
28 Feb 04
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
143 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
8 Mar
294 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
31 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
8 Mar
81 towers complete/81req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
TBD
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date -9 MARCH 2004
Power transferred from North to Middle 850 MW.
Power transferred from South to Middle 200 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1370
27417
1142
Duhok
84
1964
82
Naynawa
310
10227
426
Tamim
132
3665
153
Salah Aldeen
222
5019
209
Anbar
205
4547
189
Dyala
115
2295
96
Babil
105
2273
95
Kirbala
80
2055
86
Najaf
105
2489
104
Kadsya
55
1242
52
Wasit
90
1894
79
Muthana
70
1365
57
Nasirya
135
2851
119
Misan
65
1490
62
Basra
270
6385
266
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 2 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-d7eebb18
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 9, 2004
- التاريخ
- 9 آذار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: