DAILY POWER SYSTEM HIGHLIGHTS FOR JANUARY 31, 2004

التاريخ
31 كانون الثاني 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
DAILY POWER SYSTEM HIGHLIGHTS FOR JANUARY 31, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: All time high of Mw/hrs, 93,388 Generation: Peak Power 4306Mw, 93388 Mw hours, 7-day Avg. 4067 Mw Generators Returned to Service 163Mw Dibis 4 8 Mw Najebia 5 100 Mw Khor Zubayr 3 55 Mw Generators Unscheduled Out of Service 628 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 1 SP Turbine vibration 8 *Baiji 4 SP Boiler Leak 100 Baiji 5, SP Forced Outage (No ECD) 30 Daura 4 SP Rotor repair 25 South Baghdad 2 SP Air HeaterLeak 30 South Baghdad 4 SP Boiler Leak 30 *Nassirya 3 SP Boiler Leak 150 Baiji 2, CP Lubricating oil leak 40 Mosil 1 CP Rotor Defect 15 Mosil 3 CP Bleeder valve 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo and Circuit breaker 15 New Mulla 6 CP Generator Defect 15 Taji 3, CP Compressor 15 *Taji 5, CP Turbine vibration 15 Taji Mobile, 2 CP Software problem 15 Shuaiba 2, CP Gas Turbine Leak 80 * RED – Denotes out of service since last report Generators Scheduled Out of Service 874 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 01Mar 100 Baiji 6 SP M Bechtel 5 Dec 03 03Feb 100 Daura 3 CP R RIE/ME 1 Mar 03 TBD 20 Daura 5 SP R Bechtel Jul 03 30 Apr 100 Daura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME/Bechtel 30Dec 03 15 Feb 8 Dibis 4 CP R ME/GRD Sep 03 30 Mar 18 Dibis 5 CP R ME/Bechtel Sep 03 6 Feb 18 Hartha 4 SP M ME/Bechtel 23Oct 03 1 Feb 150 Khor Zubayr 4 CP R RIE/GRD 20Dec03 31 Jan 55 Najaf 2 CP R RIE/GRD 5 Dec 03 30 Apr 50 New Mulla 1 CP M RIE/GRD 13 Jan 04 15 Feb 30 New Mulla 4 CP M RIE/GRD 3 Jan 04 31 Mar 30 Old Mulla 5 CP M RIE/GRD 1 Nov 03 15 Feb 15 Old Mulla 10 CP M RIE/GRD 6 Jan 04 5 Feb 15 Old Mulla 12 CP R RIE/GRD 1 Oct 03 TBD 15 South Baghdad 5 SP M ME/Bechtel 1 Mar 03 6 Feb 35 Taji 7 CP R RIE/GRD 1 Oct 03 TBD 15 Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 1 May Haditha-Baghd West 400 Sabotage RIE/GRD 15 Mar 28 towers complete/236 req’d Hartha-Qarna – Wasit 400 Sabotage RIE/GRD 29 Feb 208 towers complete/293 req’d Baghd South – Diwaniya 400 Sabotage RIE/GRD Complete 27 towers complete/27 req’d Baiji - Baghd West #1 400 Sabotage RIE/GRD 10 Feb 60 towers complete/66 req’d Baghd E.-Baghd S. #2 400 New Line RIE/GRD 10 Feb 81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME TBD No Contract awarded Baiji – Haditha 400 Sabotage ME TBD No contract awarded Diyala Connection 400 Sabotage ME 30 Apr Baiji – Mosul 400 Damaged ME Complete Mosul – Mosul East 132 Sabotage RIE/GRD TBD Dibis/Irbil-Azadi/Quarqush 132 New Line RIE/GRD Shuwaiba-Toba-Hamar 132 Sabotage ME TBD Baghd West – Jamia 132 Sabotage RIE/GRD TBD Omara-Burzegan 132 Looting ME 1 Mar Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Report Date - 31 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 820 MW. Power transferred from South to Middle 185MW. Baghdad 1385 30831 1322 Duhok 80 1951 81 Naynawa 378 8317 347 Tamim 132 3357 140 Salah Aldeen 210 4805 200 Anbar 195 4178 174 Dyala 118 2303 96 Babil 110 2367 99 Kirbala 126 2126 89 Najaf 135 2262 94 Kadsya 75 1379 57 Wasit 105 1986 83 Muthana 55 1324 55 Nasirya 125 2780 116 Misan 65 1433 60 Basra 310 7193 300 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 3 of NUMPAGES 3