# A-Steam Power Stations
REPORT DATE - 31 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 8 8 16 24 No.1 Turbine vib. No.3 prog. maint.
Baiji Fuel Oil 6 2 85 85 170 500 No 2 Prog. maint. No.4 Stopped at 2303 boiler leakage No.5 forced outage. No.6 FDF Ducts Daura Fuel Oil 4 1 60 60 180 No.3 Limted to burners No.4 rotor repair No.(5+6) Rehab.
S. Baghdad Fuel Oil 6 3 35 25 30 90 200 No.2 air heater defect. No.4 A/H No.5 prog maint.
Mussaibe Crude and Fuel Oil 4 4 200 195 170 210 775 860 Nassirya Crude 4 3 135 165 90 390 600 No.3 Boiler leakage.
Najebia Natural Gas and Crude 2 2 35 88 123 160 No.4 One boiler in operation.
Hartha Natural Gas and Crude 4 1 185 185 300 No.4 Prog maint.
Out of Service for Unscheduled Maintanence Total: 1809 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date- 31 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 120 125 G.O No.2 Lub. oil leak from bearing. Musil Dam Main 4 4 590 600 Quds 2 2 220 160 G.O 40 Trucks. Musil Dam reg 4 4 32 60 1000 Mosil 12 9 146 150 24 No.1 Rotor defec. No.3 bleed valve. No.9 rotor defect. Musil Pumping 2 1 110 0 Dibis 3 1 30 30 31 No.(4+5). Rehab. Haditha Dam 6 2 136 160 250 Old Mulla 12 7 100 128 460 No.1 Acc. gear No.2 servo No 5 prog main No.12 needs Rehab. No.10 Prog. maint. Samarra 3 2 36 55 360 New Mulla 6 3 107 173 3 No.1 prog .maint No.4 Servo valve No.6 Generator defect. Himrin 2 2 34 21 130 Taji 7 4 64 55 16 No.3 Compressor. No. 5 Turbin vub. No.7 Need rehab. Hindia 4 4 5 5 110 M. Taji 2 1 8 18 16 No.2 Software. Kufa 4 2 1 0 30 Daura 4 3 63 30 18 No.3 Needs Rehab. Total 944 896 Hilla 4 3 49 64 17 No.4 Starting System Generation 85014 MWh Najaf 3 2 57 129 17 No.2 prog. maint. Syrian Line Generation 1423 MWh Khor 4 3 130 80 N.G No.4 Rehab. Turkey Line Generation 1933 MWh Shuaiba 2 0 0 20 N.G Total Generation 93388 MWh M. Shuaiba 2 0 0 N.G Split with the refinery System Peak Load 3920 MW Petro 4 1 10 0 N.G Syria Peak Load 60 MW M. Dibis 4 3 12 24 N.G Turkey Peak Load 80 MW Mossil East 5 1 6 0 G.O Total Peak Load 246 MW Hmam/Zafranya 7 2 3 G.O Equiv. Peak Load 4306 MW D.G Diesel set set 10 G.O Baghdad Load 1385 MW Mohsen T. Hassan Total 1135 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date 31 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 820 MW.
Power transferred from South to Middle 185 MW.
Baghdad 1385 30831 1285
Duhok 80 1951 81
Naynawa 378 8317 347
Tamim 132 3357 140
Salah Aldeen 210 4805 200
Anbar 195 4178 174
Dyala 118 2303 96
Babil 110 2367 99
Kirbala 126 2126 89
Najaf 135 2262 94
Kadsya 75 1379 57
Wasit 105 1986 83
Muthana 55 1324 55
Nasirya 125 2780 116
Misan 65 1433 60
Basra 310 7193 300
الرئيسية / الخدمات الأساسية / ESS-d146fecd
الخدمات الأساسية
System Status Jan 31
- التاريخ
- 31 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| REPORT DATE - 31 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | No.1 Turbine vib. No.3 prog. maint. | ||||
| Baiji | Fuel Oil | 6 | 2 | 85 | 85 | 170 | 500 | No 2 Prog. maint. No.4 Stopped at 2303 boiler leakage No.5 forced outage. No.6 FDF Ducts | ||||
| Daura | Fuel Oil | 4 | 1 | 60 | 60 | 180 | No.3 Limted to burners No.4 rotor repair No.(5+6) Rehab. | |||||
| S. Baghdad | Fuel Oil | 6 | 3 | 35 | 25 | 30 | 90 | 200 | No.2 air heater defect. No.4 A/H No.5 prog maint. | |||
| Mussaibe | Crude and Fuel Oil | 4 | 4 | 200 | 195 | 170 | 210 | 775 | 860 | |||
| Nassirya | Crude | 4 | 3 | 135 | 165 | 90 | 390 | 600 | No.3 Boiler leakage. | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 35 | 88 | 123 | 160 | No.4 One boiler in operation. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 185 | 185 | 300 | No.4 Prog maint. | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,809 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date- 31 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 120 | 125 | G.O | No.2 Lub. oil leak from bearing. | Musil Dam Main | 4 | 4 | 590 | 600 | |
| Quds | 2 | 2 | 220 | 160 | G.O | 40 Trucks. | Musil Dam reg | 4 | 4 | 32 | 60 | 1,000 |
| Mosil | 12 | 9 | 146 | 150 | 24 | No.1 Rotor defec. No.3 bleed valve. No.9 rotor defect. | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 30 | 30 | 31 | No.(4+5). Rehab. | Haditha Dam | 6 | 2 | 136 | 160 | 250 |
| Old Mulla | 12 | 7 | 100 | 128 | 460 | No.1 Acc. gear No.2 servo No 5 prog main No.12 needs Rehab. No.10 Prog. maint. | Samarra | 3 | 2 | 36 | 55 | 360 |
| New Mulla | 6 | 3 | 107 | 173 | 3 | No.1 prog .maint No.4 Servo valve No.6 Generator defect. | Himrin | 2 | 2 | 34 | 21 | 130 |
| Taji | 7 | 4 | 64 | 55 | 16 | No.3 Compressor. No. 5 Turbin vub. No.7 Need rehab. | Hindia | 4 | 4 | 5 | 5 | 110 |
| M. Taji | 2 | 1 | 8 | 18 | 16 | No.2 Software. | Kufa | 4 | 2 | 1 | 0 | 30 |
| Daura | 4 | 3 | 63 | 30 | 18 | No.3 Needs Rehab. | Total | 944 | 896 | |||
| Hilla | 4 | 3 | 49 | 64 | 17 | No.4 Starting | System Generation | 85,014 | MWh | |||
| Najaf | 3 | 2 | 57 | 129 | 17 | No.2 prog. maint. | Syrian Line Generation | 1,423 | MWh | |||
| Khor | 4 | 3 | 130 | 80 | N.G | No.4 Rehab. | Turkey Line Generation | 1,933 | MWh | |||
| Shuaiba | 2 | 0 | 0 | 20 | N.G | Total Generation | 93,388 | MWh | ||||
| M. Shuaiba | 2 | 0 | 0 | N.G | Split with the refinery | System Peak Load | 3,920 | MW | ||||
| Petro | 4 | 1 | 10 | 0 | N.G | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 12 | 24 | N.G | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 1 | 6 | 0 | G.O | Total Peak Load | 246 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | G.O | Equiv. Peak Load | 4,306 | MW | D.G | ||||
| Diesel | set | set | 10 | G.O | Baghdad Load | 1,385 | MW | Mohsen T. Hassan | ||||
| Total | 1,135 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date 31 January 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 820 MW. | |||
| Power transferred from South to Middle 185 MW. | |||
| Baghdad | 1,385 | 30,831 | 1,285 |
| Duhok | 80 | 1,951 | 81 |
| Naynawa | 378 | 8,317 | 347 |
| Tamim | 132 | 3,357 | 140 |
| Salah Aldeen | 210 | 4,805 | 200 |
| Anbar | 195 | 4,178 | 174 |
| Dyala | 118 | 2,303 | 96 |
| Babil | 110 | 2,367 | 99 |
| Kirbala | 126 | 2,126 | 89 |
| Najaf | 135 | 2,262 | 94 |
| Kadsya | 75 | 1,379 | 57 |
| Wasit | 105 | 1,986 | 83 |
| Muthana | 55 | 1,324 | 55 |
| Nasirya | 125 | 2,780 | 116 |
| Misan | 65 | 1,433 | 60 |
| Basra | 310 | 7,193 | 300 |