DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 22, 2004

التاريخ
22 نيسان 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 22, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: We should begin to see a gradual climb in generation as units return from maintenance. Generation: Peak Power 4107Mw, 86,821Mw hours, 7-day Avg. 3780Mw Generators Returned to Service: (2) 23 Mw Dibis 2, SP 8 Mw Taji 5 15 Mw Generators Unscheduled Out of Service (18) 698 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 3 SP Tripped-Ground/ Differential 8 South Baghdad 5 SP Boiler leak 30 South Baghdad 6 SP Boiler Leak 30 Mussaibe 4 SP Governor problem 200 Baiji 1 CP Filter 85 Baiji Mobile, 4 CP No Fuel Filters 100 Hilla 5 CP Testing 15 * Haditha 2 HP Unstable Load 65 Mosil 1 CP Rotor Defect 15 Mosil 2 CP Load Gear Oil leak 15 Mosil 8 CP Reverse Power 15 Mosil 9 CP Rotor Defect 15 Old Mulla 6 CP High exhaust temperature 15 Old Mulla 9 CP Load gear problems 15 New Mulla 4 CP Load gear oil leak 30 Shaieba 2 CP Vibrations 15 Taji 3, CP Compressor 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (26) 1453 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M TBD 21 Mar 04 15 May 100 Baiji 3 SP M Bechtel 29 Feb 04 20 Apr 100 Dibis 4 SP M ME 15 Mar 04 30 Apr 8 Doura 4 CP M ME 14 Apr 04 TBD 20 Doura 3 CP R GRD/RIE 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 20 Jun 100 Doura 6 SP R Bechtel Jul 03 20 Jul 100 Dibis 4 CP R GRD/RIE Sep 03 12 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 15 Jun 50 Mussaibe 2 SP M ME 28 Feb 04 28 Apr 200 Nassirya 1 SP M ME 30 Mar 04 15 May 130 Nassirya 2 SP M (Leak in water line) ME 9 Mar 04 24 Apr 150 New Mulla 6 CP R GRD/RIE 28 Mar 04 15 May 30 Old Mulla 1 CP M ME 17 Apr 04 TBD 15 Old Mulla 2 CP M ME 17 Apr 04 TBD 15 Old Mulla 8 CP M ME 17 Apr 04 TBD 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 South Baghdad 1 SP M (Awaiting parts) ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M (Awaiting Parts) ME 12 Feb 04 12 Apr 30 South Baghdad 3 SP R ME 18 Mar 04 18 May 20 Taji 4 CP M ME 21 Apr 04 TBD 15 Taji 7 CP R GRD/RIE 1 Oct 03 15 May 15 Taji 6 CP M ME 2 Apr 04 TBD 15 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 129 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE Loading 246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE Complete 23 Apr Operational Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete Operational Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE TBD No contract awarded Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 15 Jun Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE 15 May Contractor mobilized Dibis to Old Kirkuk 132 Reconductor GRD-RIE 30 Jun Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Jazair to Yarmook 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Baghd West – Jamia 132 Sabotage ME TBD Al Amarah-Burzulgan 132 Looting GRD-RIE 25 Jun 26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: Power transferred from North to Middle 1000 MW. Power transferred from South to Middle 150 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1500 Duhok 80 Naynawa 320 Tamim 135 Salah Aldeen 215 Anbar 215 Dyala 110 Babil 115 Kirbala 108 Najaf 123 Kadsya 75 Wasit 105 Muthana 65 Nasirya 110 Misan 45 Basra 310 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3