DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 8, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Power restored from Turkey, lines repaired (82 Mw).
Generation:
Peak Power 3953Mw, 85,304Mw hours, 7-day Avg. 3912Mw
Generators Returned to Service: 203 Mw Dibis 4, SP 8 Mw Baiji 4, SP 100 Mw South Baghdad 4 30 Mw Mosil 12 15 Mw Khor Zubayr 3 50 Mw Generators Unscheduled Out of Service 811 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Dibis 1
SP
Boiler Leak
8
Dibis 2
SP
Fuel Pump Defect
8
* Nassirya 2
SP
Boiler Leak
150
Najebia 4
SP
Valve Leak
90
* Hartha 4
SP
Boiler Leak
90
Baiji 1
CP
Lubricating oil leak
110
* Qudas 2
CP
Fuel Pump Clutch
50
Hilla 1
CP
Cooling System prob.
20
Hilla 2
CP
Servo
20
* Khor Zubayr 4
CP
Generator Protector
50
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
* Mosil 11
CP
Hydraulic Pressure
15
* Dibis 6
CP
Stopped, cause TBD
15
Najaf 2
CP
Vibrations
50
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 1101 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Baiji 3
SP
M
GRD/RIE
29 Feb 04
1 May
100
Doura 2
CP
M
ME
21 Feb 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
1 May
18
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
200
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
15 May
15
Old Mulla 8
CP
M
GRD/RIE
28 Feb 04
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
143 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
8 Mar
294 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
31 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
8 Mar
81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE
Compl. 24 Jan
27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
TBD
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date -8 MARCH 2004
Power transferred from North to Middle 800 MW.
Power transferred from South to Middle 220 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1250
26537
1106
Duhok
82
1583
66
Naynawa
330
7999
333
Tamim
140
3020
126
Salah Aldeen
220
5205
217
Anbar
211
4802
200
Dyala
180
3372
141
Babil
125
2701
113
Kirbala
110
1904
79
Najaf
140
2630
110
Kadsya
60
1389
58
Wasit
85
1982
83
Muthana
55
1423
59
Nasirya
105
2701
113
Misan
65
1532
64
Basra
290
7096
296
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-cde2c464
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 8, 2004
- التاريخ
- 8 آذار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: