# ورقة1
DATE: 9 / 1 / 2004
POWER STATION UNITS CONDATION DURING MAIN PEAK LOAD AT : 18:30 HRS
1 2 3 4 5 6 7 8 9 10 11 12 INST. CAP. AVAIL CAP. PEAK LOAD DAILY PROD.
DBSP F 8 F 8 60 16 16 338
BAJP 100 F F 95 P F 1320 195 195 5790
BGSP 25 F 30 30 F 25 355 110 110 2520
DORP 80 F P P 640 80 80 1895
MUSP 200 F 180 200 1200 580 580 14084
NSRP 150 140 125 P 840 415 415 11103
HRTP 140 P 400 140 140 3334
NJBP 40 85 200 125 125 2928
TOTAL STEAM 5015 1661 1661 41992
GAS 1 2 3 4 5 6 7 8 9 10 11 12
MSLG F F F 13 13 13 13 12 F 12 12 12 200 100 100 3021
MSLEM F 6 F F F 40 6 6 110
DBSG F P 23 112.5 23 23 680
DBSM 3 3 3 F F 50 9 9 63
TAMG F F 13 13 F 14 P 14 13 13 12 F 220 90 90 2244
NTAMG 30 30 30 F F P 222 90 90 2412
TAJG 15 15 F F 15 15 120 60 60 1474
TAJM 9 F 24 9 9 146
DORG 25 25 F 25 150 75 75 1536
HILG 18 18 17 17 80 70 70 1559
NJFG 50 P 50 189 100 100 2341
QDSG 110 110 246 220 220 5118
KAZG 40 40 40 F 252 120 120 2970
SHBG+ DISEAL (2*6) 7 F 40 7 7 170
HMAM F F 5 0 0 7
BAJG 135 S 318 135 135 3244
PETG F 10 F F 80 10 10 240
ZAFR+ SHOM+ DIZEL 10 10 10 60
TOTAL GAS 2348.5 1134 1134 27395
HYDRO 1 2 3 4 5 6 7 8 9 10 11 12
MDM 130 P 130 130 750 390 390 6142
MDR 11 P 12 12 60 35 35 927
MPS 110 S 240 110 110 298
KADH F S 70 S P 70 660 140 140 2393
HMRH P 22 50 22 22 521
SMRH 17 16 S 84 33 33 770
HNDBH 1.5 1.5 1 1 15 5 5 120
KUFH S S S S 5 0 0 0
DOKH 400
DRBH 166
TOTAL HYDRO 2430 735 735 11171
ZHUR 0 0 0
TURK.LINE 80 80 1910
TOTAL 80 80 1910
TOTAL GEN. 9793.5 3610 3610 82468
1
# ورقة2
ELECTRICITY PRODUCTION STATUS IN MW
DATE:9/ 1 / 2004
REGION INSTALLED AVAILABLE GENERATION EXPORTED IMPORTED RECCOMMENDATION
CAPACITY CAPACITY CAPACITY
NORTH 4163.5 1316 1316 450
REGION
MIDDLE 3818 1477 1477
REGION
SOUTH 1812 817 817 170
REGION
TOTAL 9793.5 3610 3610
BAGHDAD = 1500 MW
MAIN ACT . PEAK LOAD = M.P LOAD + L.SH + F.D
5485 MW = 3610 MW + 1550 MW + 325 MW
Eng. ABDUL HAFOUD HUSSEIN DAOUD Eng. THAIR .E. YACOOUB Director Head OF Planing And Tracing DIRECTOR OF NATIONAL DISPACH CENTER Eng. MAHDI DAHAM JASSIM Eng. SALAH NASIR HASSON Director Head OF Operational Study Dept Director Head OF Operational Dept 2
# ورقة7
DATE :9 / 1 / 2004
N GOV. Average planned load (MW) Average supplied load (MW) Deviation 1 BAGD 1800 1294 506 2 DOHK 110 78 32 3 NYNW 514 313 201 4 TAME 185 129 56 5 SLAH 237 183 54 6 ANBR 221 168 53 7 DYLA 132 71 61 8 BABL 129 77 52 9 KRBL 96 68 28 10 NAJF 119 92 27 11 WAST 117 76 41 12 KADS 88 54 34 13 MUTH 70 48 22 14 THQR 127 112 15 15 MYSN 72 56 16 16 BASR 321 304 17 5
الرئيسية / الخدمات الأساسية / ESS-bc750579
الخدمات الأساسية
Jan 9
- التاريخ
- 9 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «ورقة1»: 49 صفاً × 19 عموداً
| DATE: 9 / 1 / 2004 | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| POWER STATION | UNITS CONDATION DURING MAIN PEAK LOAD | AT : 18:30 HRS | ||||||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | INST. CAP. | AVAIL CAP. | PEAK LOAD | DAILY PROD. | |
| DBSP | F | 8 | F | 8 | 60 | 16 | 16 | 338 | ||||||||
| BAJP | 100 | F | F | 95 | P | F | 1,320 | 195 | 195 | 5,790 | ||||||
| BGSP | 25 | F | 30 | 30 | F | 25 | 355 | 110 | 110 | 2,520 | ||||||
| DORP | 80 | F | P | P | 640 | 80 | 80 | 1,895 | ||||||||
| MUSP | 200 | F | 180 | 200 | 1,200 | 580 | 580 | 14,084 | ||||||||
| NSRP | 150 | 140 | 125 | P | 840 | 415 | 415 | 11,103 | ||||||||
| HRTP | 140 | P | 400 | 140 | 140 | 3,334 | ||||||||||
| NJBP | 40 | 85 | 200 | 125 | 125 | 2,928 | ||||||||||
| TOTAL STEAM | 5,015 | 1,661 | 1,661 | 41,992 | ||||||||||||
| GAS | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| MSLG | F | F | F | 13 | 13 | 13 | 13 | 12 | F | 12 | 12 | 12 | 200 | 100 | 100 | 3,021 |
| MSLEM | F | 6 | F | F | F | 40 | 6 | 6 | 110 | |||||||
| DBSG | F | P | 23 | 112.50 | 23 | 23 | 680 | |||||||||
| DBSM | 3 | 3 | 3 | F | F | 50 | 9 | 9 | 63 | |||||||
| TAMG | F | F | 13 | 13 | F | 14 | P | 14 | 13 | 13 | 12 | F | 220 | 90 | 90 | 2,244 |
| NTAMG | 30 | 30 | 30 | F | F | P | 222 | 90 | 90 | 2,412 | ||||||
| TAJG | 15 | 15 | F | F | 15 | 15 | 120 | 60 | 60 | 1,474 | ||||||
| TAJM | 9 | F | 24 | 9 | 9 | 146 | ||||||||||
| DORG | 25 | 25 | F | 25 | 150 | 75 | 75 | 1,536 | ||||||||
| HILG | 18 | 18 | 17 | 17 | 80 | 70 | 70 | 1,559 | ||||||||
| NJFG | 50 | P | 50 | 189 | 100 | 100 | 2,341 | |||||||||
| QDSG | 110 | 110 | 246 | 220 | 220 | 5,118 | ||||||||||
| KAZG | 40 | 40 | 40 | F | 252 | 120 | 120 | 2,970 | ||||||||
| SHBG+ DISEAL (2*6) | 7 | F | 40 | 7 | 7 | 170 | ||||||||||
| HMAM | F | F | 5 | 0 | 0 | 7 | ||||||||||
| BAJG | 135 | S | 318 | 135 | 135 | 3,244 | ||||||||||
| PETG | F | 10 | F | F | 80 | 10 | 10 | 240 | ||||||||
| ZAFR+ SHOM+ DIZEL | 10 | 10 | 10 | 60 | ||||||||||||
| TOTAL GAS | 2,348.50 | 1,134 | 1,134 | 27,395 | ||||||||||||
| HYDRO | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||
| MDM | 130 | P | 130 | 130 | 750 | 390 | 390 | 6,142 | ||||||||
| MDR | 11 | P | 12 | 12 | 60 | 35 | 35 | 927 | ||||||||
| MPS | 110 | S | 240 | 110 | 110 | 298 | ||||||||||
| KADH | F | S | 70 | S | P | 70 | 660 | 140 | 140 | 2,393 | ||||||
| HMRH | P | 22 | 50 | 22 | 22 | 521 | ||||||||||
| SMRH | 17 | 16 | S | 84 | 33 | 33 | 770 | |||||||||
| HNDBH | 1.50 | 1.50 | 1 | 1 | 15 | 5 | 5 | 120 | ||||||||
| KUFH | S | S | S | S | 5 | 0 | 0 | 0 | ||||||||
| DOKH | 400 | |||||||||||||||
| DRBH | 166 | |||||||||||||||
| TOTAL HYDRO | 2,430 | 735 | 735 | 11,171 | ||||||||||||
| ZHUR | 0 | 0 | 0 | |||||||||||||
| TURK.LINE | 80 | 80 | 1,910 | |||||||||||||
| TOTAL | 80 | 80 | 1,910 | |||||||||||||
| TOTAL GEN. | 9,793.50 | 3,610 | 3,610 | 82,468 | ||||||||||||
| 1 |
الورقة «ورقة2»: 31 صفاً × 12 عموداً
| ELECTRICITY PRODUCTION STATUS IN MW | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DATE:9/ 1 / 2004 | |||||||||||
| REGION | INSTALLED | AVAILABLE | GENERATION | EXPORTED | IMPORTED | RECCOMMENDATION | |||||
| CAPACITY | CAPACITY | CAPACITY | |||||||||
| NORTH | 4,163.50 | 1,316 | 1,316 | 450 | |||||||
| REGION | |||||||||||
| MIDDLE | 3,818 | 1,477 | 1,477 | ||||||||
| REGION | |||||||||||
| SOUTH | 1,812 | 817 | 817 | 170 | |||||||
| REGION | |||||||||||
| TOTAL | 9,793.50 | 3,610 | 3,610 | ||||||||
| BAGHDAD = | 1500 MW | ||||||||||
| MAIN ACT . PEAK LOAD = M.P LOAD + L.SH + F.D | |||||||||||
| 5,485 | MW = | 3,610 | MW + | 1,550 | MW + | 325 | MW | ||||
| Eng. ABDUL HAFOUD HUSSEIN DAOUD | Eng. THAIR .E. YACOOUB | ||||||||||
| Director Head OF Planing And Tracing | DIRECTOR OF NATIONAL DISPACH CENTER | ||||||||||
| Eng. MAHDI DAHAM JASSIM | Eng. SALAH NASIR HASSON | ||||||||||
| Director Head OF Operational Study Dept | Director Head OF Operational Dept | ||||||||||
| 2 |
الورقة «ورقة7»: 21 صفاً × 5 أعمدة
| DATE :9 / 1 / 2004 | ||||
|---|---|---|---|---|
| N | GOV. | Average planned load (MW) | Average supplied load (MW) | Deviation |
| 1 | BAGD | 1,800 | 1,294 | 506 |
| 2 | DOHK | 110 | 78 | 32 |
| 3 | NYNW | 514 | 313 | 201 |
| 4 | TAME | 185 | 129 | 56 |
| 5 | SLAH | 237 | 183 | 54 |
| 6 | ANBR | 221 | 168 | 53 |
| 7 | DYLA | 132 | 71 | 61 |
| 8 | BABL | 129 | 77 | 52 |
| 9 | KRBL | 96 | 68 | 28 |
| 10 | NAJF | 119 | 92 | 27 |
| 11 | WAST | 117 | 76 | 41 |
| 12 | KADS | 88 | 54 | 34 |
| 13 | MUTH | 70 | 48 | 22 |
| 14 | THQR | 127 | 112 | 15 |
| 15 | MYSN | 72 | 56 | 16 |
| 16 | BASR | 321 | 304 | 17 |
| 5 |
تظليل نتائج البحث عن: