# A-Steam Power Stations
Report Date - 28 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 x x 15 24 Baiji Fuel Oil 6 4 x x x x 364 500 Daura Fuel Oil 4 1 x x x 68 180 #3 trip drum level low South Baghdad Fuel Oil 6 3 x 85 200 #5 leak in boiler Mussaibe Crude and Fuel Oil 4 1 x 219 860 #2 problem in thrust bearing Nassirya Crude 4 4 x x x x 615 600 Najebia Natural Gas and Crude 2 1 x 90 160 #5 loss of auxiliary Hartha Natural Gas and Crude 4 2 x x 185 300 Out of Service for Unscheduled Maintanence Total: 1641 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 28 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 127 125 Gas Oil Musil Dam Main 4 4 572 600 Quds 2 2 138 160 Gas Oil Musil Dam reg 4 3 21 60 Mosil 12 10 153 150 Musil Pumping 2 0 Dibis 3 2 50 30 Haditha Dam 6 160 Old Mulla 12 7 108 128 Samarra 3 3 48 55 New Mulla 6 4 140 173 Himrin 2 2 49 21 Taji 7 55 Hindia 4 4 5 5 M. Taji 2 18 Kufa 4 1 1 0 Daura 4 30 Total 696 896 Hilla 4 2 32 64 System Generation MWh Najaf 3 3 138 129 Syrian Line Generation MWh Khor 4 3 120 80 Natural Gas Turkey Line Generation MWh Shuaiba 2 1 5 20 Natural Gas Total Generation MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3618 MW Petro 4 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 12 Gas Oil Total Peak Load 4024 MW Diesel Gas Oil Baghdad Load 1125 MW Total 1023 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 28 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1345 Duhok 81 Naynawa 320 Tamim 170 Salah Aldeen 213 Anbar 170 Dyala 100 Babil 138 Kirbala 108 Najaf 150 Kadsya 65 Wasit 100 Muthana 60 Nasirya 120 Misan 65 Basra 320
الرئيسية / الخدمات الأساسية / ESS-b75d4996
الخدمات الأساسية
System Status Feb 28
- التاريخ
- 28 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| Report Date - 28 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 2 | x | x | 15 | 24 | |||||
| Baiji | Fuel Oil | 6 | 4 | x | x | x | x | 364 | 500 | |||
| Daura | Fuel Oil | 4 | 1 | x | x | x | 68 | 180 | #3 trip drum level low | |||
| South Baghdad | Fuel Oil | 6 | 3 | x | 85 | 200 | #5 leak in boiler | |||||
| Mussaibe | Crude and Fuel Oil | 4 | 1 | x | 219 | 860 | #2 problem in thrust bearing | |||||
| Nassirya | Crude | 4 | 4 | x | x | x | x | 615 | 600 | |||
| Najebia | Natural Gas and Crude | 2 | 1 | x | 90 | 160 | #5 loss of auxiliary | |||||
| Hartha | Natural Gas and Crude | 4 | 2 | x | x | 185 | 300 | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,641 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date - 28 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 127 | 125 | Gas Oil | Musil Dam Main | 4 | 4 | 572 | 600 | ||
| Quds | 2 | 2 | 138 | 160 | Gas Oil | Musil Dam reg | 4 | 3 | 21 | 60 | ||
| Mosil | 12 | 10 | 153 | 150 | Musil Pumping | 2 | 0 | |||||
| Dibis | 3 | 2 | 50 | 30 | Haditha Dam | 6 | 160 | |||||
| Old Mulla | 12 | 7 | 108 | 128 | Samarra | 3 | 3 | 48 | 55 | |||
| New Mulla | 6 | 4 | 140 | 173 | Himrin | 2 | 2 | 49 | 21 | |||
| Taji | 7 | 55 | Hindia | 4 | 4 | 5 | 5 | |||||
| M. Taji | 2 | 18 | Kufa | 4 | 1 | 1 | 0 | |||||
| Daura | 4 | 30 | Total | 696 | 896 | |||||||
| Hilla | 4 | 2 | 32 | 64 | System Generation | MWh | ||||||
| Najaf | 3 | 3 | 138 | 129 | Syrian Line Generation | MWh | ||||||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | Turkey Line Generation | MWh | |||||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | Total Generation | MWh | |||||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,618 | MW | ||||||
| Petro | 4 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||||
| M. Dibis | 4 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||||
| Mossil East | 5 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||||
| Hmam/Zafranya | 7 | 12 | Gas Oil | Total Peak Load | 4,024 | MW | ||||||
| Diesel | Gas Oil | Baghdad Load | 1,125 | MW | ||||||||
| Total | 1,023 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 28 FEBRUARY 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,345 | ||
| Duhok | 81 | ||
| Naynawa | 320 | ||
| Tamim | 170 | ||
| Salah Aldeen | 213 | ||
| Anbar | 170 | ||
| Dyala | 100 | ||
| Babil | 138 | ||
| Kirbala | 108 | ||
| Najaf | 150 | ||
| Kadsya | 65 | ||
| Wasit | 100 | ||
| Muthana | 60 | ||
| Nasirya | 120 | ||
| Misan | 65 | ||
| Basra | 320 |