DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 11, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: All-time high for Megawatt hours produced, 93,916
Generation:
Peak Power 4230Mw, 93,916Mw hours, 7-day Avg. 3992Mw
Generators Returned to Service 130 Mw Baiji 6, SP 100 Mw South Baghdad 5 30 Mw
Generators Unscheduled Out of Service 738 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler leak
8
Baiji 1
SP
Boiler Leak
90
Daura 3
SP
Boiler Leak
65
Daura 4
SP
Rotor repair
65
South Baghdad 1
SP
Boiler Leakage
30
South Baghdad 2
SP
Air Heater
30
South Baghdad 6
SP
Boiler Leak
30
Baiji 2,
CP
Lubricating oil leak
110
Hilla 2
CP
Servo
15
Mosil 1
CP
Rotor Defect
15
Mosil 3
CP
Bleeder Valve
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo and Circuit breaker
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji Mobile, 2
CP
Software problem
15
* Hilla, 1,2,3,4
CP
Stopped to install trans line 80 Shuaiba 2, CP Stand By 80
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 1001 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Baiji 6
SP
M
Bechtel
5 Dec 03
18 Feb
100
Daura 3
CP
R
GRD/RIE
1 Mar 03
1 Jun
20
Daura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Daura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
15 Feb
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Hartha 4
SP
M
ME/Bechtel
23Oct 03
14 Feb
150
Khor Zubayr 4
CP
R
GRD/RIE
20Dec03
14 Feb
55
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
180
Najaf 2
CP
M
GRD/RIE
5 Dec 03
30 Apr
50
New Mulla 1
CP
M
GRD/RIE
13 Jan 04
1 Jun
30
New Mulla 4
CP
M
GRD/RIE
3 Jan 04
1 Jun
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
1 Jun
15
Old Mulla 10
CP
M
GRD/RIE
6 Jan 04
1 Jun
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
1 Jun
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
1 May
Haditha-Baghd West
400
Sabotage
GRD/RIE
15 Mar
41 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
29 Feb
229 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
2 Mar
60 towers complete/66 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
2 Mar
81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
Sabotage
ME
30 Apr
Mosul – Mosul East
132
Sabotage
ME
TBD
Dibis/Irbil-Azadi/Quarqush 132 New Line GRD/RIE
1 Jun
Shuwaiba-Toba-Hamar
132
Sabotage
ME
15 Feb
Baghd West – Jamia
132
Sabotage
ME
TBD
Omara-Burzegan
132
Looting
ME
1 Mar
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date - 11 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 750 MW.
Power transferred from South to Middle 220 MW.
Baghdad
1500
32117
1338
Duhok
80
1935
81
Naynawa
375
9018
376
Tamim
165
3816
159
Salah Aldeen
190
4901
204
Anbar
155
4292
179
Dyala
92
2409
100
Babil
110
2574
107
Kirbala
127
2809
117
Najaf
135
3208
134
Kadsya
50
1449
60
Wasit
105
2423
101
Muthana
55
1356
57
Nasirya
135
2827
118
Misan
60
1303
54
Basra
335
7800
325
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 2 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-b6ee38b6
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 11, 2004
- التاريخ
- 11 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: