# A-Steam Power Stations
Report Date - 29 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 3 8 8 7 23 24 #3 prog maint; #4 synch at 1052 Baiji Fuel Oil 6 3 90 90 95 275 500 #2 & #3 prog maint; #5 forced outage Daura Fuel Oil 4 1 70 70 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 2 25 30 55 200 #1 & #2 prog maint; #4 stopped at 750; #5 boiler leakage Mussaibe Crude and Fuel Oil 4 1 220 220 860 #1 hyd test; #2 prog maint; #4 prog maint Nassirya Crude 4 4 130 120 160 150 560 600 Najebia Natural Gas and Crude 2 2 90 90 180 160 #5 synch at 1830 Hartha Natural Gas and Crude 4 2 120 120 300 #4 stopped at 0026 boiler leakage Out of Service for Unscheduled Maintanence Total: 1503 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 29 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 135 125 Gas Oil #1 stopped at 122 L.F>P. synch at 400; #2 lub oil leak from bearing Musil Dam Main 4 4 570 600 Quds 2 1 40 160 Gas Oil 28 trucks; #2 stopped 235 FL.L Musil Dam reg 4 4 25 60 1000 Mosil 12 9 127 150 28 #1 rotor defect; #7 stopped at 0030 change rad; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 2 50 30 25 #4 rehab Haditha Dam 6 2 140 160 350 Old Mulla 12 7 105 128 430 #1 acc gear; #2 servo; #5 prog maint; #8 prog maint; #12 needs rehab Samarra 3 3 52 55 420 New Mulla 6 4 130 173 2.8 #2 prog maint; #6 generator defect Himrin 2 2 50 21 200 Taji 7 55 #3 compressor; #4 control card + N.G.P.L. Hindia 4 4 6 5 120 M. Taji 2 18 #2 software N.G.P.L. Kufa 4 1 1 0 30 Daura 4 30 #2 prog maint; #3 needs rehab + N.G.P.L. Total 954 896 Hilla 4 2 35 64 31 #1 cooling sys prog; #2 servo System Generation 81738 MWh Najaf 3 2 100 129 28 #2 stopped at 2053 oil leak from bearing Syrian Line Generation 1400 MWh Khor 4 3 60 80 Natural Gas #2 prog maint Turkey Line Generation 1994 MWh Shuaiba 2 1 5 20 Natural Gas #1 prog maint Total Generation 90559 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3777 MW Petro 4 0 Natural Gas #2 vib. Syria Peak Load 60 MW M. Dibis 4 4 12 24 Natural Gas Turkey Peak Load 84 MW Mossil East 5 3 15 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 4187 MW Diesel 49 Gas Oil Baghdad Load 1470 MW Total 865 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 29 FEBRUARY 2004 Power transferred from North to Middle 810 MW.
Power transferred from South to Middle 275 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1470 29323 1222 Duhok 84 1897 79 Naynawa 300 9323 388 Tamim 135 3471 145 Salah Aldeen 205 4951 206 Anbar 179 4650 194 Dyala 80 2313 96 Babil 90 2700 113 Kirbala 130 2598 108 Najaf 165 3487 145 Kadsya 52 1483 62 Wasit 105 2218 92 Muthana 65 1386 58 Nasirya 135 2923 122 Misan 80 1496 62 Basra 340 7690 320
الرئيسية / الخدمات الأساسية / ESS-b48828ca
الخدمات الأساسية
System Status Feb 29
- التاريخ
- 29 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| Report Date - 29 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 3 | 8 | 8 | 7 | 23 | 24 | #3 prog maint; #4 synch at 1052 | |||
| Baiji | Fuel Oil | 6 | 3 | 90 | 90 | 95 | 275 | 500 | #2 & #3 prog maint; #5 forced outage | |||
| Daura | Fuel Oil | 4 | 1 | 70 | 70 | 180 | #4 prog maint; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 2 | 25 | 30 | 55 | 200 | #1 & #2 prog maint; #4 stopped at 750; #5 boiler leakage | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 1 | 220 | 220 | 860 | #1 hyd test; #2 prog maint; #4 prog maint | |||||
| Nassirya | Crude | 4 | 4 | 130 | 120 | 160 | 150 | 560 | 600 | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 90 | 90 | 180 | 160 | #5 synch at 1830 | ||||
| Hartha | Natural Gas and Crude | 4 | 2 | 120 | 120 | 300 | #4 stopped at 0026 boiler leakage | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,503 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date - 29 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 135 | 125 | Gas Oil | #1 stopped at 122 L.F>P. synch at 400; #2 lub oil leak from bearing | Musil Dam Main | 4 | 4 | 570 | 600 | |
| Quds | 2 | 1 | 40 | 160 | Gas Oil | 28 trucks; #2 stopped 235 FL.L | Musil Dam reg | 4 | 4 | 25 | 60 | 1,000 |
| Mosil | 12 | 9 | 127 | 150 | 28 | #1 rotor defect; #7 stopped at 0030 change rad; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 2 | 50 | 30 | 25 | #4 rehab | Haditha Dam | 6 | 2 | 140 | 160 | 350 |
| Old Mulla | 12 | 7 | 105 | 128 | 430 | #1 acc gear; #2 servo; #5 prog maint; #8 prog maint; #12 needs rehab | Samarra | 3 | 3 | 52 | 55 | 420 |
| New Mulla | 6 | 4 | 130 | 173 | 2.80 | #2 prog maint; #6 generator defect | Himrin | 2 | 2 | 50 | 21 | 200 |
| Taji | 7 | 55 | #3 compressor; #4 control card + N.G.P.L. | Hindia | 4 | 4 | 6 | 5 | 120 | |||
| M. Taji | 2 | 18 | #2 software N.G.P.L. | Kufa | 4 | 1 | 1 | 0 | 30 | |||
| Daura | 4 | 30 | #2 prog maint; #3 needs rehab + N.G.P.L. | Total | 954 | 896 | ||||||
| Hilla | 4 | 2 | 35 | 64 | 31 | #1 cooling sys prog; #2 servo | System Generation | 81,738 | MWh | |||
| Najaf | 3 | 2 | 100 | 129 | 28 | #2 stopped at 2053 oil leak from bearing | Syrian Line Generation | 1,400 | MWh | |||
| Khor | 4 | 3 | 60 | 80 | Natural Gas | #2 prog maint | Turkey Line Generation | 1,994 | MWh | |||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | #1 prog maint | Total Generation | 90,559 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,777 | MW | ||||||
| Petro | 4 | 0 | Natural Gas | #2 vib. | Syria Peak Load | 60 | MW | |||||
| M. Dibis | 4 | 4 | 12 | 24 | Natural Gas | Turkey Peak Load | 84 | MW | ||||
| Mossil East | 5 | 3 | 15 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Total Peak Load | 4,187 | MW | |||||
| Diesel | 49 | Gas Oil | Baghdad Load | 1,470 | MW | |||||||
| Total | 865 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 29 FEBRUARY 2004 | |||
|---|---|---|---|
| Power transferred from North to Middle 810 MW. | |||
| Power transferred from South to Middle 275 MW. | |||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,470 | 29,323 | 1,222 |
| Duhok | 84 | 1,897 | 79 |
| Naynawa | 300 | 9,323 | 388 |
| Tamim | 135 | 3,471 | 145 |
| Salah Aldeen | 205 | 4,951 | 206 |
| Anbar | 179 | 4,650 | 194 |
| Dyala | 80 | 2,313 | 96 |
| Babil | 90 | 2,700 | 113 |
| Kirbala | 130 | 2,598 | 108 |
| Najaf | 165 | 3,487 | 145 |
| Kadsya | 52 | 1,483 | 62 |
| Wasit | 105 | 2,218 | 92 |
| Muthana | 65 | 1,386 | 58 |
| Nasirya | 135 | 2,923 | 122 |
| Misan | 80 | 1,496 | 62 |
| Basra | 340 | 7,690 | 320 |