الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً

Report Date - 01 MARCH 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas42881624#2 stopped at 2054 boiler leakage; #3 prog maint; #4 synch at 1052
BaijiFuel Oil638580100265500#2 & #3 prog maint; #5 forced outage
DauraFuel Oil417575180#4 prog maint; #5 & #6 rehab
South BaghdadFuel Oil6325303085200#1 & #2 prog maint; #4 stopped at 0130; #5 synch at 0911
MussaibeCrude and Fuel Oil41220220860#1 fire developed at 606 kV panel; #2 prog maint; #4 prog maint
NassiryaCrude44135145165155600600
NajebiaNatural Gas and Crude229090180160#5 synch at 1830
HarthaNatural Gas and Crude41120120300#4 stopped at 0026 boiler leakage
Out of Service for Unscheduled MaintanenceTotal:1,5612,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Report Date - 01 MARCH 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #2 stopped at 2054 boiler leakage; #3 prog maint; #4 synch at 1052 Baiji Fuel Oil 6 3 85 80 100 265 500 #2 & #3 prog maint; #5 forced outage Daura Fuel Oil 4 1 75 75 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 3 25 30 30 85 200 #1 & #2 prog maint; #4 stopped at 0130; #5 synch at 0911 Mussaibe Crude and Fuel Oil 4 1 220 220 860 #1 fire developed at 606 kV panel; #2 prog maint; #4 prog maint Nassirya Crude 4 4 135 145 165 155 600 600 Najebia Natural Gas and Crude 2 2 90 90 180 160 #5 synch at 1830 Hartha Natural Gas and Crude 4 1 120 120 300 #4 stopped at 0026 boiler leakage Out of Service for Unscheduled Maintanence Total: 1561 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Report Date - 01 MARCH 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 132 125 Gas Oil #1 stopped at 122 L.F.P. synch at 400; #2 lub oil leak from bearing Musil Dam Main 4 4 570 600 Quds 2 2 90 160 Gas Oil 30 trucks Musil Dam reg 4 4 24 60 1000 Mosil 12 10 150 150 26 #1 & #9 rotor defect; #7 synch at 1715 Musil Pumping 2 1 110 0 Dibis 3 2 45 30 28 #4 rehab Haditha Dam 6 2 125 160 600 Old Mulla 12 7 110 128 480 #1 acc gear; #2 servo; #5 prog maint; #8 prog maint; #12 needs rehab Samarra 3 3 55 55 480 New Mulla 6 4 140 173 3.1 #2 prog maint; #6 generator defect Himrin 2 2 50 21 200 Taji 7 55 #3 compressor; #4 control card + N.G.P.L.; #7 needs rehab Hindia 4 4 6 5 120 M. Taji 2 18 #2 software N.G.P.L. Kufa 4 1 1 0 30 Daura 4 30 #2 prog maint; #3 needs rehab + N.G.P.L. Total 941 896 Hilla 4 2 33 64 34 #1 cooling sys probl #2 servo System Generation 77793 MWh Najaf 3 2 99 129 32 #2 stopped at 2053 oil leak from bearing Syrian Line Generation 1363 MWh Khor 4 4 120 80 Natural Gas Turkey Line Generation 2056 MWh Shuaiba 2 1 5 20 Natural Gas #1 prog maint Total Generation 86639 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3525 MW Petro 4 0 Natural Gas #2 vib Syria Peak Load 63 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 82 MW Mossil East 5 2 10 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 3936 MW Diesel 55 Gas Oil Baghdad Load 1246 MW Total 1000 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Report Date - 01 MARCH 2004 Power transferred from North to Middle 850 MW. Power transferred from South to Middle 285 MW. GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1246 27764 1157 Duhok 82 1918 80 Naynawa 335 8309 346 Tamim 145 3314 138 Salah Aldeen 210 4968 207 Anbar 192 4711 196 Dyala 90 2312 96 Babil 110 2901 121 Kirbala 139 2858 119 Najaf 158 3305 138 Kadsya 57 1490 62 Wasit 90 2138 89 Muthana 60 1390 58 Nasirya 125 2928 122 Misan 67 1486 62 Basra 355 7974 332